976 resultados para Railroad Strike, Calif., 1894.
Resumo:
The “Quincy & Torch Lake Railroad Engine House Facility Management and Interpretive Plan" was designed to serve as a guide to aid the Quincy Mine Hoist Association in their efforts to restore and interpret historic railroad resources under their stewardship. Early searches for existing management and interpretive plans demonstrated that similar plans were primarily produced by the National Park Service and were intended to guide large scale heritage sites that consist of a variety of cultural resources. This project adapts concepts found in those large scale management and interpretive site plans, to guide small scale site management, restoration, and interpretive projects. The document presents a three stage, second phase restoration process. Each stage of development is guided by a series of management and interpretive goals and objectives which were set for the engine house facility.
Resumo:
The late Paleozoic collision between Gondwana and Laurussia resulted in the polyphase deformation and magmatism that characterizes the Iberian Massif of the Variscan orogen. In the Central Iberian Zone, initial con- tinental thickening (D1; folding and thrusting) was followed by extensional orogenic collapse (D2) responsible for the exhumation of high-grade rocks coeval to the emplacement of granitoids. This study presents a tectonometamorphic analysis of the Trancoso-Pinhel region (Central Iberian Zone) to ex- plain the processes in place during the transition froman extension-dominated state (D2) to a compression-dom- inated one (D3).Wereveal the existence of low-dipping D2 extensional structures later affected by several pulses of subhorizontal shortening, each of them typified by upright folds and strike-slip shearing (D3, D4 and D5, as identified by superimposition of structures). The D2 Pinhel extensional shear zone separates a low-grade domain from an underlying high-grade domain, and it contributed to the thermal reequilibration of the orogen by facil- itating heat advection from lower parts of the crust, crustal thinning, decompression melting, and magma intru- sion. Progressive lessening of the gravitational disequilibrium carried out by this D2 shear zone led to a switch from subhorizontal extension to compression and the eventual cessation and capture of the Pinhel shear zone by strike-slip tectonics during renewed crustal shortening. High-grade domains of the Pinhel shear zone were folded together with low-grade domains to define the current upright folded structure of the Trancoso-Pinhel re- gion, the D3 Tamames-Marofa-Sátão synform. Newdating of syn-orogenic granitoids (SHRIMP U\\Pb zircon dat- ing) intruding the Pinhel shear zone, together with the already published ages of early extensional fabrics constrain the functioning of this shear zone to ca. 331–311 Ma, with maximum tectonomagmatic activity at ca. 321–317 Ma. The capture and apparent cessation of movement of the Pinhel shear zone occurred at ca. 317– 311 Ma.
Resumo:
ResumenExamina los motivos y la actuación política del gobierno liberal encabezado por le presidente José SANTOS Zelaya, en la fase inicial de las reincorporación de la Mosquita a Nicaragua. Los conceptos vigentes de territorio, soberanía y progreso material pasaron por alto los derechos legítimos de la población costeña.AbstractAn analysis of the motivations and political conduct of the Liberal government headed by President José Santos Zelaya, during the early stage of reincorporation of Mosquitia to Nicaragua. The prevailing concepts with respect to territory, sovereignty, and material progress did not take into account the legitimate rights of the coastal inhabitants.
Resumo:
President’s Message Hello fellow AITPM members, Due to three colliding forces of nature I find myself writing this month’s message from home – today, I am still getting over a persistent virus that seemed to set in just after returning from Singapore a couple of weeks ago, which my diabetes won’t let me get away with too easily (no Kermit the Frog swine flu jokes please). Combine this with a very wet day in Brisbane – in fact the wettest for 20 years (how can we complain, except for flash flooding?). And in Queensland today is a state school teachers’ strike, so one half of our brood is over watching TV. Family snapshots aside, the biggest news for our industry of late is the $8.5 billion announced in the Federal Budget for transport infrastructure projects; many “shovel ready”, but some – and fortunate for our profession – desktop ready. This newsletter provides nationwide coverage on the transport infrastructure aspects of the Federal Budget. We’ll need a bit more time to carefully look at the ensuing State Budgets’ announcements. Regarding the federal budget announcements, I am pleased to see serious attention being paid to upgrading the M1 system – I hope to see a motorway standard facility connecting Adelaide to at least Rockhampton in my lifetime. But some other important roads are of course missing out in this particular budget. Various levels of commitment are being made to urban passenger rail – some project significant while others planning significant. Enhancement of suburban rail is important across the capitals and Australia’s medium sized cities such as the Gold Coast and Newcastle. Not much on road safety initiatives jumped out at me, but I believe it is implied in the large road projects and in some of the detail elsewhere. I do believe it’s about time a ‘Vision Zero’ style policy is adopted at the National level, since any death is unacceptable on the road, just as it is in any other workplace. So, overall some good news on building transport infrastructure to keep the economy purring during this recession, and strongly supporting it during future boom times. The other edge to the sword, of course, is that we tax payers will be paying a considerable amount for borrowings for these projects over a long period of time. I close again in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker
Resumo:
PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.
Resumo:
This paper takes stock of current changes affecting journalism, and as a case study brings up to date the record of progress made with an online publishing enterprise, EUAustralia Online, first reported on in 2007. It perceives the development of news publishing on line as being in two sectors: media corporations moving to occupy the online publishing field, through complex business stratagems and product-making, and small publications enjoying low production costs and the ability to strike up relationships with numerous users, even on a mass scale. Recent developments in both major publishing and niche publishing are appraised in a literature review, considering both broad-scale industry trends; and pressure from fresh advances in information and communication technology to produce ever-more sophisticated media artefacts, like multi-platform news coverage. The paper also recounts the pattern of work on EUAustralia Online, showing how such publications, ubiquitous ‘blogs’ or newsletters, may be placed in a prospective online order, where large and small operations might co-exist.
Resumo:
In the 21st century, our global community is changing to increasingly value creativity and innovation as driving forces in our lives. This paper will investigate how educators need to move beyond the rhetoric to effective practices for teaching and fostering creativity. First, it will describe the nature of creativity at different levels, with a focus on personal and everyday creativity. It will then provide a brief snapshot of creativity in education through the lens of new policies and initiatives in Queensland, Australia. Next it will review two significant areas related to enriching and enhancing students’ creative engagement and production: 1) influential social and environmental factors; and 2) creative self-efficacy. Finally, this paper will propose that to effectively promote student creativity in schools, we need to not only emphasise policy, but also focus on establishing a shared discourse about the nature of creativity, and researching and implementing effective practices for supporting and fostering creativity. This paper has implications for educational policy, practice and teacher training that are applicable internationally.
Resumo:
This article examines the role of the recently introduced fair dealing exception for the purposes of parody and satire in Australian copyright law. Parody and satire, while central to Australian expression, pose a substantial challenge for copyright policy. The law is asked to strike a delicate balance between an author’s right to exploit their work, the interests of the public in stimulating free speech and critical discussion, the rights of artists who rely on existing material in creating their own expression, and the rights of all artists in their reputation and the integrity of their works. This article highlights the difficulty parodists and satirists have historically faced in Australia and examines the potential of the new fair dealing exceptions to relieve this difficulty. This article concludes that the new exceptions have the potential, if read broadly, not only to bridge the gap between humorous and non-humorous criticism, but also to allow for the use of copyright material to critique figures other than the copyright owner or author, extending to society generally. This article will argue that the new exceptions should be read broadly to further this important policy goal while also being limited in their application so as to prevent mere substitutable uses of copyright material. To achieve these twin goals, I suggest that the primary indication of fairness of an unlicensed parody should be whether or not it adds significant new expression so as not to be substitutable for the original work.
Resumo:
Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.
Resumo:
Powerful brands create meaningful images in the minds of customers (Keller, 1993). A strong brand image and reputation enhances differentiation and has a positive influence on buying behaviour (Gordon et al., 1993; McEnally and de Chernatony, 1999). While the power of branding is widely acknowledged in consumer markets, the nature and importance of branding in industrial markets remains under-researched. Many business-to-business (B2B) strategists have claimed brand-building belongs in the consumer realm. They argue that industrial products do not need branding as it is confusing and adds little value to functional products (Collins, 1977; Lorge, 1998; Saunders and Watt, 1979). Others argue that branding and the concept of brand equity however are increasingly important in industrial markets, because it has been shown that what a brand means to a buyer can be a determining factor in deciding between industrial purchase alternatives (Aaker, 1991). In this context, it is critical for suppliers to initiate and sustain relationships due to the small number of potential customers (Ambler, 1995; Webster and Keller, 2004). To date however, there is no model available to assist B2B marketers in identifying and measuring brand equity. In this paper, we take a step in that direction by operationalising and empirically testing a prominent brand equity model in a B2B context. This makes not only a theoretical contribution by advancing branding research, but also addresses a managerial need for information that will assist in the assessment of industrial branding efforts.
Resumo:
There has been a worldwide trend to increase axle loads and train speeds. This means that railway track degradation will be accelerated, and track maintenance costs will be increased significantly. There is a need to investigate the consequences of increasing traffic load. The aim of the research is to develop a model for the analysis of physical degradation of railway tracks in response to changes in traffic parameters, especially increased axle loads and train speeds. This research has developed an integrated track degradation model (ITDM) by integrating several models into a comprehensive framework. Mechanistic relationships for track degradation hav~ ?een used wherever possible in each of the models contained in ITDM. This overcc:mes the deficiency of the traditional statistical track models which rely heavily on historical degradation data, which is generally not available in many railway systems. In addition statistical models lack the flexibility of incorporating future changes in traffic patterns or maintenance practices. The research starts with reviewing railway track related studies both in Australia and overseas to develop a comprehensive understanding of track performance under various traffic conditions. Existing railway related models are then examined for their suitability for track degradation analysis for Australian situations. The ITDM model is subsequently developed by modifying suitable existing models, and developing new models where necessary. The ITDM model contains four interrelated submodels for rails, sleepers, ballast and subgrade, and track modulus. The rail submodel is for rail wear analysis and is developed from a theoretical concept. The sleeper submodel is for timber sleepers damage prediction. The submodel is developed by modifying and extending an existing model developed elsewhere. The submodel has also incorporated an analysis for the likelihood of concrete sleeper cracking. The ballast and subgrade submodel is evolved from a concept developed in the USA. Substantial modifications and improvements have been made. The track modulus submodel is developed from a conceptual method. Corrections for more global track conditions have been made. The integration of these submodels into one comprehensive package has enabled the interaction between individual track components to be taken into account. This is done by calculating wheel load distribution with time and updating track conditions periodically in the process of track degradation simulation. A Windows-based computer program ~ssociated with ITDM has also been developed. The program enables the user to carry out analysis of degradation of individual track components and to investigate the inter relationships between these track components and their deterioration. The successful implementation of this research has provided essential information for prediction of increased maintenance as a consequence of railway trackdegradation. The model, having been presented at various conferences and seminars, has attracted wide interest. It is anticipated that the model will be put into practical use among Australian railways, enabling track maintenance planning to be optimized and potentially saving Australian railway systems millions of dollars in operating costs.