971 resultados para Operation Research


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Faced with the need for strategic change, structural and cultural realignment, innovation and value-adding, many public sector organisations are tapping into a wider senior leadership talent pool and attracting successful leaders from other sectors (Flynn and Thompson, 2009). Leadership renewal has resulted, in some cases, in the external recruitment of whole senior leadership teams (Hockridge, 2008), raising issues about the influence of context on leader success (Pawar and Eastman, 1997) and potential leader transition failure, a costly outcome for leaders and organisations (Howard, 2001). There is little research on inter-sector leader transitions, which is surprising given the significant costs associated with leader acquisition and failure(Conger, 2010; Day and Halpin, 2004). For example, it is not clear what organizations do (or do not do) to ensure the outcomes of their significant investment in inter sector transitions are realised. In addition, it is not clear how the individual leader manages the challenging transition into a new leadership context and how their approach to leadership facilitates or inhibits successful transition (Avolio, 2010). Leader assimilation programs have been developed to assimilate new leaders (Manderscheid, 2008); however, assimilation is not necessarily a desired organisational outcome (Denis and Pineault, 2000). In this paper we critically review the limited literature on inter-sector leader transitions and transformational change outcomes and argue for a mutual accommodation approach. We draw on our own initial empirical work to propose the elements of a program for achieving this outcome from the perspective of the public organisation and the inter-sector appointee.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports an empirical study on measuring transit service reliability using the data from a Web-based passenger survey on a major transit corridor in Brisbane, Australia. After an introduction of transit service reliability measures, the paper presents the results from the case study including study area, data collection, and reliability measures obtained. This includes data exploration of boarding/arrival lateness, in-vehicle time variation, waiting time variation, and headway adherence. Impacts of peak-period effects and separate operation on service reliability are examined. Relationships between transit service characteristics and passenger waiting time are also discussed. A summary of key findings and an agenda of future research are offered in conclusions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In pre-Fitzgerald Queensland, the existence of corruption was widely known but its extent and modes of operation were not fully evident. The Fitzgerald Report identified the need for reform of the structure, procedures and efficiency in public administration in Queensland. What was most striking in the Queensland reform process was that a new model for combating corruption had been developed. Rather than rely upon a single law and a single institution, existing institutions were strengthened and new institutions were instituted to create a set of mutually supporting and mutually checking institutions, agencies and laws that jointly sought to improve governmental standards and combat corruption. Some of the reforms were either unique to Queensland or very rare. One of the strengths of this approach was that it avoided creating a single overarching institution to fight corruption. There are many powerful opponents of reform. Influential institutions and individuals resist any interference with their privileges. In order to cause a mass exodus from an entrenched corruption system, a seminal event or defining process is needed to alter expectations and incentives that are sufficient to encourage significant numbers of individuals to desert the corruption system and assist the integrity system in exposing and destroying it. The Fitzgerald Inquiry was such an event. The article also briefly addresses methods for destroying national corruption system where they emerge and exist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Circuit-breakers (CBs) are subject to electrical stresses with restrikes during capacitor bank operation. Stresses are caused by the overvoltages across CBs, the interrupting currents and the rate of rise of recovery voltage (RRRV). Such electrical stresses also depend on the types of system grounding and the types of dielectric strength curves. The aim of this study is to demonstrate a restrike waveform predictive model for a SF6 CB that considered the types of system grounding: grounded and non-grounded and the computation accuracy comparison on the application of the cold withstand dielectric strength and the hot recovery dielectric strength curve including the POW (point-on-wave) recommendations to make an assessment of increasing the CB remaining life. The simulation of SF6 CB stresses in a typical 400 kV system was undertaken and the results in the applications are presented. The simulated restrike waveforms produced with the identified features using wavelet transform can be used for restrike diagnostic algorithm development with wavelet transform to locate a substation with breaker restrikes. This study found that the hot withstand dielectric strength curve has less magnitude than the cold withstand dielectric strength curve for restrike simulation results. Computation accuracy improved with the hot withstand dielectric strength and POW controlled switching can increase the life for a SF6 CB.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this editorial letter, we provide the readers of Information Systems and e-Business Management with an introduction to Business Process Management and the challenges of empirical research in this field. We then briefly describe selected examples of current research efforts in this fields and how the papers accepted for this special issue contribute to extending our body of knowledge.