964 resultados para Generation expansion planning
Resumo:
This research is about jazz in Chile in relation to modernity and identity. Final chapters focus and detach latest jazz musician s generation in 1990 decade and composer guitarist Angel Parra. An historic and sociological approach is developed, which will be useful for modernity and identity analysis, and so on post modernity and globalization. Modernity has been studied in texts of Adorno, Baudrillard, Brünner, García Canclini, Habermas and Jameson. Identity has been studied in texts of Aharonián, Cordúa, Garretón, Gissi, Larraín and others. Chapter 3 is about Latin-American musicology and jazz investigations, in relation to approach developed in chapter 2. Chapters 4 and 5 are about history of jazz in Chile until beginning of XXI century. Chapter 6 focuses in Ángel Parra Orrego. Conclusions of this investigation detach the modernist mechanical that has conducted jazz development in Chile, which in Ángel Parra´s case has been overcame by a post modernist behaviour. This behaviour has solved in a creative way, subjects like modernity and identity in jazz practice in a Latin-American country.
Resumo:
Through an analysis using the transfer function of a pinhole camera, the multiple imaging characteristics of photographic diffusers described by Grover and Tremblay [Appl. Opt.21,4500(1982)] is studied. It is found that only one pinhole diameter satisfies the optimum imaging condition for best contrast transfer at any desired spatial frequency. A simple method of generating random pinhole arrays with a controlled pinhole diameter is described. These pinhole arrays are later used to generate high frequency sinusoidal gratings from a coarse grid. The contrast in the final gratings is found to be reasonably high.
Resumo:
This report summarises the findings of a case study on Queensland’s New Generation Rollingstock (NGR) Project carried out as part of SBEnrc Project 2.34 Driving Whole-of-life Efficiencies through BIM and Procurement. This case study is one of three exemplar projects studied in order to leverage academic research in defining indicators for measuring tangible and intangible benefits of Building Information Modelling (BIM) across a project’s life-cycle in infrastructure and buildings. The NGR is an AUD 4.4 billion project carried out under an Availability Payment Public-Private Partnership (PPP) between the Queensland Government and the Bomabardier-led QTECTIC consortium comprising Bombardier Transportation, John Laing, ITOCHU Corporation and Aberdeen Infrastructure Investments. BIM has been deployed on the project from conceptual stages to drive both design and the currently ongoing construction at the Wulkuraka Project Site. This case study sourced information from a series of semi-structured interviews covering a cross-section of key stakeholders on the project. The present research identified 25 benefits gained from implementing BIM processes and tools. Some of the most prominent benefits were those leading to improved outcomes and higher customer satisfaction such as improved communications, data and information management, and coordination. There were also a number of expected benefits for future phases such as: • Improved decision making through the use of BIM for managing assets • Improved models through BIM maturity • Better utilisation of BIM for procurement on similar future projects • New capacity to specify the content of BIM models within contracts There were also three benefits that were expected to have been achieved but were not realised on the NGR project. These were higher construction information quality levels, better alignment in design teams as well as project teams, and capability improvements in measuring the impact of BIM on construction safety. This report includes individual profiles describing each benefit as well as the tools and processes that enabled them. Four key BIM metrics were found to be currently in use and six more were identified as potential metrics for the future. This case study also provides insights into challenges associated with implementing BIM on a project of the size and complexity of the NGR. Procurement aspects and lessons learned for managers are also highlighted, including a list of recommendations for developing a framework to assess the benefits of BIM across the project life-cycle.
Resumo:
The relationship between governance arrangements and sustainability planning outcomes in complex governance systems remains poorly understood, despite significant discussions of governance in the environmental management literature emerging in the last decade. In order to analyse and examine the relationship between the health of sustainability planning governance and decision-making outcomes, this paper applies the Governance Systems Analysis framework (GSA) in the Cairns region. This paper analyses the sustainability planning governance arrangements in the Cairns region by exploring the capacity, connectivity and knowledge use of institutions in the region to deliver desired sustainability planning outcomes. The paper finds that the planning for sustainability in the Cairns region is on a knife’s edge, and could fail or succeed to deliver its intended decision-making outcomes. The paper concludes with recommendations for governance reform for sustainability in the Cairns region.