999 resultados para Sandwich construction
Resumo:
Versova, one of the 23 fishing villages in the district of Greater Bombay, is a major fishing centre. During the last three decades mechanisation of fishing boats received a tremendous boost in the state specially in and around Bombay resulting in higher income and gainful employment to fishermen. Indigenous construction of fishing boats at Versova contributes to the marine fisheries development. Inspite of certain constraints in construction activities, training of artisans in boat construction would ultimately help in the economic growth of the village.
Resumo:
The design and construction of the otter board is a subject of great importance for economy in trawling. This review incorporates a historical resume tracing the change and development• of otter boards. The size of the otter board and its relationship with the horse power of the engine and size of the net and the methods of rigging are dealt with. The factors influencing the horizontal spread are discussed. The effect of the angles of attack, heel and tilt and the ground reaction on the force coefficients have been reviewed and discussed with particular reference to flat rectangular otter boards used for bottom trawling. A short account of other designs of otter boards used for improved efficiency is given. Suggestion for improving the efficacy of otter boards based on the work hitherto done has been made. The contributions relating to the various aspects of design and performance of trawl boards carried out till 1969 have been considered.
Resumo:
A pair of blades were constructed following a Tapered Chord, Zero Twist pattern after Anderson. The construction uses the Wood Epoxy Saturation Technique, with a solid Beech main spar and leading edge joined together with laminated veneers of beech forming a D-section; the trailing edge is formed from millimetre ply skins, foam filled to resist compressive loads. This construction leads to an extremely light, flexible blade, with the centres of gravity and torsion well forward, giving good stability. Each blade has three built-in strain gauges, alowing flapwise bending to be measured. Stiffness, and natural frequencies, were measured, to input to a numerical computer model to calculate blade deformation during operation, and to determine stability boundaries of the blade. Preliminary aerodynamic performance measurements are presented and close agreement is found with theory.
Resumo:
A system of computer assisted grammar construction (CAGC) is presented in this paper. The CAGC system is designed to generate broad-coverage grammars for large natural language corpora by utilizing both an extended inside-outside algorithm and an automatic phrase bracketing (AUTO) system which is designed to provide the extended algorithm with constituent information during learning. This paper demonstrates the capability of the CAGC system to deal with realistic natural language problems and the usefulness of the AUTO system for constraining the inside-outside based grammar re-estimation. Performance results, including coverage, recall and precision, are presented for a grammar constructed for the Wall Street Journal (WSJ) corpus using the Penn Treebank.
Resumo:
Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Makwanzi) and the immediate downstream .transect (Buyala-Kikubamutwe). The routine monitoring surveys were designed to be conducted twice a week at each of the tWo transects. It was anticipated that major immediate impacts were to occur during construction, and these needed to be known by BEL as part of a mitigation strategy. For example, the construction of it cofferdam could be accompanied by rapid changes in water quality and quantity downstream of the construction. These changes in turn could affect the fish catch and would probably be missed by the quarterly monitoring already in place. Therefore, a major cbjective of the more regular and rapid monitoring was to discern immediate impacts of construction activities by focusing on selected water quality parameters (total suspended solids, water conductivity, temperature, dissolved oxygen and pH) and fish catch characteristics (total catch, catch rates and value of the catch)