991 resultados para Program validation
Validation of the New Mix Design Process for Cold In-Place Rehabilitation Using Foamed Asphalt, 2007
Resumo:
Asphalt pavement recycling has grown dramatically over the last few years as a viable technology to rehabilitate existing asphalt pavements. Iowa's current Cold In-place Recycling (CIR) practice utilizes a generic recipe specification to define the characteristics of the CIR mixture. As CIR continues to evolve, the desire to place CIR mixture with specific engineering properties requires the use of a mix design process. A new mix design procedure was developed for Cold In-place Recycling using foamed asphalt (CIR-foam) in consideration of its predicted field performance. The new laboratory mix design process was validated against various Reclaimed Asphalt Pavement (RAP) materials to determine its consistency over a wide range of RAP materials available throughout Iowa. The performance tests, which include dynamic modulus test, dynamic creep test and raveling test, were conducted to evaluate the consistency of a new CIR-foam mix design process to ensure reliable mixture performance over a wide range of traffic and climatic conditions. The “lab designed” CIR will allow the pavement designer to take the properties of the CIR into account when determining the overlay thickness.
Resumo:
Many definitions and debates exist about the core characteristics of social and solidarity economy (SSE) and its actors. Among others, legal forms, profit, geographical scope, and size as criteria for identifying SSE actors often reveal dissents among SSE scholars. Instead of using a dichotomous, either-in-or-out definition of SSE actors, this paper presents an assessment tool that takes into account multiple dimensions to offer a more comprehensive and nuanced view of the field. We first define the core dimensions of the assessment tool by synthesizing the multiple indicators found in the literature. We then empirically test these dimensions and their interrelatedness and seek to identify potential clusters of actors. Finally we discuss the practical implications of our model.
Resumo:
Background: Although CD4 cell count monitoring is used to decide when to start antiretroviral therapy in patients with HIV-1 infection, there are no evidence-based recommendations regarding its optimal frequency. It is common practice to monitor every 3 to 6 months, often coupled with viral load monitoring. We developed rules to guide frequency of CD4 cell count monitoring in HIV infection before starting antiretroviral therapy, which we validated retrospectively in patients from the Swiss HIV Cohort Study.Methodology/Principal Findings: We built up two prediction rules ("Snap-shot rule" for a single sample and "Track-shot rule" for multiple determinations) based on a systematic review of published longitudinal analyses of CD4 cell count trajectories. We applied the rules in 2608 untreated patients to classify their 18 061 CD4 counts as either justifiable or superfluous, according to their prior >= 5% or < 5% chance of meeting predetermined thresholds for starting treatment. The percentage of measurements that both rules falsely deemed superfluous never exceeded 5%. Superfluous CD4 determinations represented 4%, 11%, and 39% of all actual determinations for treatment thresholds of 500, 350, and 200x10(6)/L, respectively. The Track-shot rule was only marginally superior to the Snap-shot rule. Both rules lose usefulness for CD4 counts coming near to treatment threshold.Conclusions/Significance: Frequent CD4 count monitoring of patients with CD4 counts well above the threshold for initiating therapy is unlikely to identify patients who require therapy. It appears sufficient to measure CD4 cell count 1 year after a count > 650 for a threshold of 200, > 900 for 350, or > 1150 for 500x10(6)/L, respectively. When CD4 counts fall below these limits, increased monitoring frequency becomes advisable. These rules offer guidance for efficient CD4 monitoring, particularly in resource-limited settings.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program - June 2007
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program - July 2007
Resumo:
A-1a - SUPPLEMENTAL SECURITY INCOME PROGRAM - July 2007
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program - August 2007
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
A-1a - SUPPLEMENTAL SECURITY INCOME PROGRAM - August 2007