1000 resultados para Pedagogic projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

An extensive and growing road system in the United States bisects vital wildlife habitat and is causing deleterious ecological effects on many wildlife species. The primary impacts include collisions between wildlife and vehicles, altered movement patterns within habitat, and/or the complete blockage of movements between vital habitats. The increasing size of the road network and number of vehicles will only intensify the problem unless proactive wildlife mitigation measures are developed to minimize these adverse effects. Therefore, this capstone project examines the role of citizen advocacy for promoting wildlife protection in the planning and development of wildlife-sensitive transportation projects in the United States. Based upon a data analysis of 21 questionnaires from qualified participants, it was determined that citizen participation is an important component associated with the development of wildlife-sensitive transportation projects. However, four major barriers to facilitating effective citizen participation processes were identified. 1) A lack of awareness. Citizens are only minimally aware of wildlife and transportation issues, including: a) the ecological impacts of roads, b) the solutions available to mitigate these impacts, and c) the opportunities to advocate for the protection of wildlife during transportation planning processes; 2) Public apathy or a lack of citizen interest in wildlife and transportation issues; 3) Ineffective citizen participation techniques and processes; and 4) Poor communication with citizens. Four recommendations were provided to assist in overcoming these barriers and to help define a better role for citizen advocacy in protecting wildlife from the growing road network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mobile players in men's football are highly skilled professionals who move to a country other than the one where they grew up and started their careers. They are commonly described as migrants or expatriate players. Due to a much less advanced stage of professionalism and production of the game in women's football mobility projects are different. At describing the cases of Brazil, Equatorial Guinea, Mexico, Colombia and Portugal, the aim of this paper is to conceptualise an umbrella category for mobile players that can include current realities in the women's game, namely the transnational player who has gained and displays transnational football experience in different countries and socio-culturally contexts. Furthermore, analyses allow introducing two new subcategories besides the “expatriate”, namely diaspora players and new citizens.