996 resultados para Numbers, Complex.
Resumo:
Robert S. K. Welch celebrates the opening of the new Science Complex wing, an addition to the Mackenzie Chown Complex, as Dr. Alan Earp (pictured behind Welch) and others look on. The new name for the Academic Staging Building was also unveiled. It was renamed after former mayor Mackenzie Chown.
Resumo:
Rather then cutting a piece of red tape with scissors, the Science students at Brock prepared a laser devise to cut through a specially made piece of metallic ribbon for the opening ceremony of the Science Complex addition. Pictured here is Robert Welch with the laser device as he attempts to 'cut' the tape. Unfortunately the device failed and Dr. Earp resorted to cutting the tape with a Swiss Army knife he had on hand.
Resumo:
The Aumni Greenhouse and the Science Complex in the background.
Resumo:
Mackenzie Chown Complex model.
Resumo:
View of the Mackenzie Chown Complex model from above.
Resumo:
A model showing the Mackenzie Chown complex and the H Block addition.
Resumo:
View of the progress of the Mackenzie Chown Complex several months into construction.
Resumo:
Initial groundwork taking place during the construction of the addition.
Resumo:
Early groundwork continues during the construction of the addition.
Resumo:
An excavator sits near several piles of building supplies during initial construction.
Resumo:
Framework for the addition goes up.
Resumo:
Heavy cranes working on finishing the framework for the addition.
Resumo:
Framework for the addition is completed and further work begins.
Resumo:
Exterior construction nears completion.
Resumo:
Construction of the addition nears completion.