995 resultados para Indian Refining Company Site (Lawrence County, Ill.)
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
"May, 1969."
Resumo:
"January, 1970."
Resumo:
Bibliography: p. 55-56.
Resumo:
Kept up to date by addendum.
Resumo:
"...first statewide development and operation plan for DNR trails." -- Letter of transmittal.
Resumo:
"December 19, 1996."
Resumo:
Description based on: 1997 ; caption title.
Resumo:
"October, 1982."
Resumo:
"IEPA/WPC/83-004."
Resumo:
Includes bibliographical references (p. 157-161).
Resumo:
In a 2002 Record of decision, the Illinois Environmental Protection Agency (IEPA) outlined remedies for four major sources of groundwater contamination found in the Southeast Rockford Groundwater Contamination Superfund Site. This fact sheet updates information on further investigations at the Area 4, Area 7, Area 9/10 and Area 11 locations.
Resumo:
Bibliography: p. 40-41.
Resumo:
"October 1965."
Resumo:
"Illinois Mine Subsidence Research Program"