1000 resultados para Elene-TT project
Resumo:
Background Recent reports have suggested that the prevalence of autism and related spectrum disorders (ASDs) is substantially higher than previously recognised. We sought to quantify prevalence of ASDs in children in South Thames, UK. Methods Within a total population cohort of 56946 children aged 9-10 years, we screened all those with a current clinical diagnosis of ASD (n=255) or those judged to be at risk for being an undetected case (n=1515). A stratified subsample (n=255) received a comprehensive diagnostic assessment, including standardised clinical observation, and parent interview assessments of autistic symptoms, language, and intelligence quotient (IQ). Clinical consensus diagnoses of childhood autism and other ASDs were derived. We used a sample weighting procedure to estimate prevalence. Findings The prevalence of childhood autism was 38.9 per 10000 (95% CI 29.9-47.8) and that of other ASDs was 77.2 per 10000 (52.1-102.3), making the total prevalence of all AS Ds 116.1 per 10000 (90.4-141.8). A narrower definition of childhood autism, which combined clinical consensus with instrument criteria for past and current presentation, provided a prevalence of 24.8 per 10 000 (17.6-32.0). The rate of previous local identification was lowest for children of less educated parents. Interpretation Prevalence of autism and related ASDs is substantially greater than previously recognised. Whether the increase is due to better ascertainment, broadening diagnostic criteria, or increased incidence is unclear. Services in health, education, and social care will need to recognise the needs of children with some form of ASD, who constitute 1% of the child population.
Resumo:
The eMinerals project has established an integrated compute and data minigrid infrastructure together with a set of collaborative tools,. The infrastructure is designed to support molecular simulation scientists working together as a virtual organisation aiming to understand a number of strategic processes in environmental science. The eMinerals virtual organisation is now working towards applying this infrastructure to tackle a new generation of scientific problems. This paper describes the achievements of the eMinerals virtual organisation to date, and describes ongoing applications of the virtual organisation infrastructure.
Resumo:
A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.
Resumo:
Current e-learning systems are increasing their importance in higher education. However, the state of the art of e-learning applications, besides the state of the practice, does not achieve the level of interactivity that current learning theories advocate. In this paper, the possibility of enhancing e-learning systems to achieve deep learning has been studied by replicating an experiment in which students had to learn basic software engineering principles. One group learned these principles using a static approach, while the other group learned the same principles using a system-dynamics-based approach, which provided interactivity and feedback. The results show that, quantitatively, the latter group achieved a better understanding of the principles; furthermore, qualitatively, they enjoyed the learning experience
Resumo:
Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the five remaining projects were calculated by contractors. Cost estimates prepared by contractors seemed to be closer to actual costs than estimates calculated by consultants. Projects estimated by consultants experienced an average cost overrun of 40% and time overrun of 62% whereas projects priced by contractors experienced an average cost overrun of 6% and time overrun of 41%. It seemed that contractors had a better understanding of the actual construction processes and a clearer expectation of the needs of the client hence an ability to calculate estimates that were closer to reality. Construction clients in Ghana should rely on contractors for more realistic cost estimates as estimates by consultants may be inaccurate. Where consultants are employed, an allowance of up 40% should be added to the estimated costs as a margin for inaccuracy.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.