954 resultados para Construction industry - Cost effectiveness


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK construction industry has embarked on one of the largest experiments in the implementation of innovative technologies and practices in its history. Following Rethinking Construction[1], generally known as the Egan Report, the Movement for Innovation was established with the aim of using demonstration projects as practical examples of innovation in order to encourage others to follow the example. The number of demonstration projects has exceeded the original plans and more are being added. This paper reviews the approach in terms of the practice of using demonstration projects to achieve widespread take up of innovation, the modifications to the programme and its management and considers future developments to improve its, effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An overtly critical perspective on 're-engineering construction' is presented. It is contended that re-engineering is impossible to define in terms of its substantive content and is best understood as a rhetorical label. In recent years, the language of re-engineering has heavily shaped the construction research agenda. The declared goals are to lower costs and improve value for the customer. The discourse is persuasive because it reflects the ideology of the 'enterprise culture' and the associated rhetoric of customer responsiveness. Re-engineering is especially attractive to the construction industry because it reflects and reinforces the existing dominant way of thinking. The overriding tendency is to reduce organizational complexities to a mechanistic quest for efficiency. Labour is treated as a commodity. Within this context, the objectives of re-engineering become 'common sense'. Knowledge becomes subordinate to the dominant ideology of neo-liberalism. The accepted research agenda for re-engineering construction exacerbates the industry's problems and directly contributes to the casualization of the workforce. The continued adherence to machine metaphors by the construction industry's top management has directly contributed to the 'bad attitudes' and 'adversarial culture' that they repeatedly decry. Supposedly neutral topics such as pre-assembly, partnering, supply chain management and lean thinking serve only to justify the shift towards bogus labour-only subcontracting and the associated reduction of employment rights. The continued casualization of the workforce raises real questions about the industry's future capacity to deliver high-quality construction. In order to appear 'relevant' to the needs of industry, it seems that the research community is doomed to perpetuate this regressive cycle.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current recipes for learning across business sectors too often fail to recognize the embedded and contextual nature of management practice. The existing literature gives little emphasis to the symbiotic relationship between supply chain management and the broader dynamics of context. The aerospace and construction sectors are selected for comparison on the basis that they are so different. The UK aerospace sector has undergone extensive consolidation as a result of the imperatives of global competitive pressures. In contrast, the construction industry has experienced decades of fragmentation and remains highly localized. An increasing proportion of output in the aerospace sector occurs within a small number of large, globally orientated firms. In contrast, construction output is dominated by a plethora of small firms with high levels of subcontracting and a widespread reliance on self-employment. These differences have fundamental implications for the way that supply chain management is understood and implemented in the two sectors. Semi-structured interviews with practitioners from both sectors support the contention that supply chain management is more established in aerospace than construction. The introduction of prime contracting and the increasing use of framework agreements within the construction sector potentially provide a much more supportive climate for supply chain management than has traditionally prevailed. However, progress depends upon an improved continuity of workload under such arrangements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The existing literature on lean construction is overwhelmingly prescriptive with little recognition of the social and politicised nature of the diffusion process. The prevailing production-engineering perspective too often assumes that organizations are unitary entities where all parties strive for the common goal of 'improved performance'. An alternative perspective is developed that considers the diffusion of lean construction across contested pluralistic arenas. Different actors mobilize different storylines to suit their own localized political agendas. Multiple storylines of lean construction continuously compete for attention with other management fashions. The conceptualization and enactment of lean construction therefore differs across contexts, often taking on different manifestations from those envisaged. However, such localized enactments of lean construction are patterned and conditioned by pre-existing social and economic structures over which individual managers have limited influence. Taking a broader view, 'leanness' can be conceptualized in terms of a quest for structural flexibility involving restructuring, downsizing and outsourcing. From this perspective, the UK construction industry can be seen to have embarked upon leaner ways of working in the mid-1970s, long before the terminology of lean thinking came into vogue. Semi-structured interviews with construction sector policy-makers provide empirical support for the view that lean construction is a multifaceted concept that defies universal definition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Anticipating the future is increasingly being seen as a useful way to align, direct and improve current organizational strategy. Several such 'future studies' have been produced which envision various construction industry scenarios which result from technological and socio-economic trends and influences. Thirteen construction-related future studies are critically reviewed. Most studies fail to address the complexities and uncertainties of both the present and the future, and fail to explore the connections between global, local, construction-specific and more widespread factors. The methodological approaches used in these studies do not generate any significantly different advice or recommendations for the industry than those emerging from the much larger canon of non-future oriented construction research. As such, these reports are less about the future than the present. If future studies are to make a worthwhile contribution to construction, it is critical that they develop our appreciation of the practical ability of stakeholders to influence some aspects of the future and not others, and an awareness of the competing agendas and the relative benefits and disadvantages of specific futures within the construction sector. Only then can future studies provide insights and help in preparing for the opportunities and threats the future may bring.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems. Design/methodology/approach – The use of ILS within a through-life business model (TLBM) is a better framework to achieve a well-designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed. Findings – The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies. Originality/value – The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVES: To determine the cost-effectiveness of influenza vaccination in people aged 65-74 years in the absence of co-morbidity. DESIGN: Primary research: randomised controlled trial. SETTING: Primary care. PARTICIPANTS: People without risk factors for influenza or contraindications to vaccination were identified from 20 general practitioner (GP) practices in Liverpool in September 1999 and invited to participate in the study. There were 5875/9727 (60.4%) people aged 65-74 years identified as potentially eligible and, of these, 729 (12%) were randomised. INTERVENTION: Participants were randomised to receive either influenza vaccine or placebo (ratio 3:1), with all individuals receiving pneumococcal vaccine unless administered in the previous 10 years. Of the 729 people randomised, 552 received vaccine and 177 received placebo; 726 individuals were administered pneumococcal vaccine. MAIN OUTCOME MEASURES AND METHODOLOGY OF ECONOMIC EVALUATION: GP attendance with influenza-like illness (ILI) or pneumonia (primary outcome measure); or any respiratory symptoms; hospitalisation with a respiratory illness; death; participant self-reported ILI; quality of life (QoL) measures at 2, 4 and 6 months post-study vaccination; adverse reactions 3 days after vaccination. A cost-effectiveness analysis was undertaken to identify the incremental cost associated with the avoidance of episodes of influenza in the vaccination population and an impact model was used to extrapolate the cost-effectiveness results obtained from the trial to assess their generalisability throughout the NHS. RESULTS: In England and Wales, weekly consultations for influenza and ILI remained at baseline levels (less than 50 per 100,000 population) until week 50/1999 and then increased rapidly, peaking during week 2/2000 with a rate of 231/100,000. This rate fell within the range of 'higher than expected seasonal activity' of 200-400/100,000. Rates then quickly declined, returning to baseline levels by week 5/2000. The predominant circulating strain during this period was influenza A (H3N2). Five (0.9%) people in the vaccine group were diagnosed by their GP with an ILI compared to two (1.1%) in the placebo group [relative risk (RR), 0.8; 95% confidence interval (CI) = 0.16 to 4.1]. No participants were diagnosed with pneumonia by their GP and there were no hospitalisations for respiratory illness in either group. Significantly fewer vaccinated individuals self-reported a single ILI (4.6% vs 8.9%, RR, 0.51; 95% CI for RR, 0.28 to 0.96). There was no significant difference in any of the QoL measurements over time between the two groups. Reported systemic side-effects showed no significant differences between groups. Local side-effects occurred with a significantly increased incidence in the vaccine group (11.3% vs 5.1%, p = 0.02). Each GP consultation avoided by vaccination was estimated from trial data to generate a net NHS cost of 174 pounds. CONCLUSIONS: No difference was seen between groups for the primary outcome measure, although the trial was underpowered to demonstrate a true difference. Vaccination had no significant effect on any of the QoL measures used, although vaccinated individuals were less likely to self-report ILI. The analysis did not suggest that influenza vaccination in healthy people aged 65-74 years would lead to lower NHS costs. Future research should look at ways to maximise vaccine uptake in people at greatest risk from influenza and also the level of vaccine protection afforded to people from different age and socio-economic populations.