950 resultados para Construction Industry Development


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Performance in the construction industry is increasingly scrutinized as a result of the delays, cost overruns and poor quality of the industry’s products and services. Increasingly, disputes, conflicts and mismatches of objectives among participants are contributory factors. Performance measurement approaches have been developed to overcome these problems. However, these approaches focus primarily on objective measures to the exclusion of subjective measures, particularly those concerning contractor satisfaction (Co-S). The contractor satisfaction model (CoSMo) developed here is intended to rectify the situation. Data derived from a questionnaire survey of 75 large contractors in Malaysia in respect of a key project are analysed to identify participant factors and their strength of relationship with Co-S dimensions. The results are presented in the form of eight regression equations. The outcome is a tool for use by project participants to provide a better understanding of how they, and the project, affect contractor satisfaction. The developed model sheds some light on a hitherto unknown aspect of construction management in providing an increased awareness of the importance of major Malaysian construction contractors’ needs in the execution of successful projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In cold-formed steel construction, the use of a range of thin, high strength steels (0.35 mm thickness and 550 MPa yield stress) has increased significantly in recent times. A good knowledge of the basic mechanical properties of these steels is needed for a satisfactory use of them. In relation to the modulus of elasticity, the current practice is to assume it to be about 200 GPa for all steel grades. However, tensile tests of these steels have consistently shown that the modulus of elasticity varies with grade of steel and thickness. It was found that it increases to values as high as 240 GPa for smaller thicknesses and higher grades of steel. This paper discusses this topic, presents the tensile test results for a number of steel grades and thicknesses, and attempts to develop a relationship between modulus of elasticity, yield stress and thickness for the steel grades considered in this investigation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In Australia, the building and construction industry is taking significant steps towards the enhancement of environmental performance of the built environment. A large number of world class sustainable buildings have been constructed in recent years, offering researchers and practitioners alike a good opportunity to identify the best practices and real life experiences in delivering high performance buildings. A case study of ONE ONE ONE Eagle Street, a 6 Star Green Star office building in Brisbane, was conducted to investigate the best practice in achieving this “world leader” green office building. The study identified a number of key factors relating to project delivery system, contractor selection method, client’s early commitment, design integration, communication as major contributors to the successful delivery of this project. Additionally, key environmentally sustainable features and their cost implications were explored through in-depth interviews with the main contractor. The findings of this study will shed lights on the successful delivery of sustainable buildings and provide practical implications for different stakeholders.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This research identifies factors that are crucial to the success of a knowledge management system (KMS) implementation in a prominent Australian engineering consultancy firm. The study employs the Delphi method to solicit the opinions of experienced market leaders in the Australian construction industry, and then benchmarks the organisational profile of the consultancy firm against the Delphi findings. From this comparative case study, recommendations are made pertaining to the organisational and cultural changes required within the consultancy firm in order to improve its readiness to successfully implement a KMS.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.