973 resultados para Congress of Panama (1826)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we explore the implications of pluralist curricula for architectural technology. This includes the potential effects on strengthening the identity of the architectural technology profession and the academic development of the discipline. This latter relies, arguably, on research being explicit in CIAT’s eight mandatory threshold standards. This work concentrates on one of the Chartered Institute of Architectural Technologist’s (CIATS’s) key subjects; 'design', defined as detail design for the architectural technologist. In postulating a philosophy of architectural technology epistemology with a focus on detail design, the pedagogy of architectural detailing in practice and academia is investigated: the associated roles of creativity and conditioning are explored. The interrelationship between conceptual design and construction processes in practice is outlined, identifying the role of the detail design specialist (architectural technologist) in the management of design and production information. Thus is identified the future architectural technologists’ specialisation of nuclear architecture: the total quality construction created by quality of thinking which permeates from and to detail design for assembly/disassembly and production within a collaboratively mechanised AEC team. A theory of nuclear architecture and an associated approach to detail design pedagogy are postulated, aiming to promote a revised perception of the definition of design for the architectural technologist. How this theory can be applied to the creation of a paradigmatic student project, themed on designing for disassembly as a key future focus of ‘Healthy Building’ design is introduced for future exploration. This future research into detail design, the authors propose, should be predicated on the appropriate methodology related to the epistemology of a design-based area of the architectural technology discipline. The roles of Professional, Statutory and Regulatory Bodies (PSRB) in the evaluation and subsequent dissemination of this detail design pedagogy, with the aim of strengthening the architectural technology discipline are emphasised.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cultural heritage sites all over the world are at risk due to aggressive urban expansion, development, wars and general obsolescence. Not all objects are recorded in detail although they may have social and historical significance. For example more emphasis is placed on the recording of castles and palaces than on crofters’ cottages or tenement blocks, although their history can be just as rich. This paper will investigate the historic fabric of Aberdeen through the use of digital scanning, supported by a range of media including old photographs and paintings. Dissemination of social heritage through visualisations will be explored and how this can aid the understanding of space within the city or specific area. Focus will be given to the major statues/monuments within the context of the city centre, exploring their importance in their environment. In addition studying why many have been re-located away from their original site, the reasons why, and how we have perhaps lost some of the social and historical importance of why that monument was first located there. It will be argued that Digital Media could be utilised for much more than re-creation and re-presentation of physical entities. Digital scanning, in association with visualisation tools, is used to capture the essence of both the cultural heritage and the society that created or used the sites in association with visualisation tools and in some way re-enacting the original importance placed upon the monument in its original location, through adoption of BIM Heritage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Some would argue that there is a need for the traditional lecture format to be rethought in favour of a more active approach. However, this must form part of a bipartite strategy, considered in conjunction with the layout of any new space to facilitate alternative learning and teaching methods. With this in mind, this paper begins to examine the impact of the learning environment on the student learning experience, specifically focusing on students studying on the Architectural Technology and Management programme at Ulster University. The aim of this study is two-fold: to increase understanding of the impact of learning space layout, by taking a student centered approach; and to gain an appreciation of how technology can impact upon the learning space. The study forms part of a wider project being undertaken at Ulster University known as the Learning Landscape Transition Project, exploring the relationship between learning, teaching and space layout. Data collection was both qualitative and quantitative, with use of a case study supported by a questionnaire based on attitudinal scaling. A focus group was also used to further analyse the key trends resulting from the questionnaire. The initial results suggest that the learning environment, and the technology within it, can not only play an important part in the overall learning experience of the student, but also assist with preparation for the working environment to be experienced in professional life.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to equip architecture students with ambitious detail designing ability, related courses of the architecture programs should deal with subjects which are rather rare and unusual for real life practices in order to prevent students copying standard details. In 2015 an innovative project brief has been given to architecture students of Istanbul Technical University. The scenario given in the brief is to design a research station for the first group of Turkish scientist, to be built in one of the coldest and most arid regions on earth; the Antarctica. The performance requirements given in the brief were determined to prevent the students from copying details from any kind of resources as the total number of details generated in real life for those conditions are very limited and specific. The method used has demonstrated a great success and creative detail solutions were generated by the students. In the paper, the innovative coursework brief for bettering the detail design ability of architecture students is explained and the output of the studio is presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dealing with the environmental problems is one of the biggest challenges within the field of architectural technology. Solutions to this problem are mostly exclusively sought in materials and computer technology. However, far more attention should be paid to humans and their role in this problem. This paper presents a small part of our bachelor thesis, which started as an investigation on the Dutch terraced house and through research ended as a study on the human behaviour and motivation. The first part of this paper, the evolution, is focussed on the traditional way of problem solving. The second part, the revolution, is focussed on human behaviour and motivation. These two studies put together lead to our conclusion: The only way to structurally solve our environmental problem is to revolutionize our way of building by involving the human interaction into our solution instead of forcing it out.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On a global level the population growth and increase of the middle class lead to a growing demand on material resources. The built environment has an enormous impact on this scarcity. In addition, a surplus of construction and demolition waste is a common problem. The construction industry claims to recycle 95% of this waste but this is in fact mainly downcycling. Towards the circular economy, the quality of reuse becomes of increasing importance. Buildings are material warehouses that can contribute to this high quality reuse. However, several aspects to achieve this are unknown and a need for more insight into the potential for high quality reuse of building materials exists. Therefore an instrument has been developed that determines the circularity of construction waste in order to maximise high quality reuse. The instrument is based on three principles: ‘product and material flows in the end of life phase’, ‘future value of secondary materials and products’ and ‘the success of repetition in a new life cycle’. These principles are further divided into a number of criteria to which values and weighting factors are assigned. A degree of circularity can then be determined as a percentage. A case study for a typical 70s building is carried out. For concrete, the circularity is increased from 25% to 50% by mapping out the potential for high quality reuse. During the development of the instrument it was clarified that some criteria are difficult to measure. Accurate and reliable data are limited and assumptions had to be made. To increase the reliability of the instrument, experts have reviewed the instrument several times. In the long-term, the instrument can be used as a tool for quantitative research to reduce the amount of construction and demolition waste and contribute to the reduction of raw material scarcity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Contains instructions for preparing and administering medicine for adults and children, and generalized uses for certain ingredients, written by Dr. Francis Kittredge. Preparations include ointment for scurvy, bone ointment, nerve ointments, procedures to soothe a sore mouth and to stop excessive bleeding, and treatment to kill worms. The materials used to prepare bone ointment include fresh butter, hog fat, chamomile, garlic, and night shade, among other ingredients. The recipe for “simple nerve ointment” instructs the preparer to simmer half a pint of neet foot oil, a pint of rum, and one jell of oil of turpentine over a “gentle fire.” Kittredge writes that oil of St. John’s Wort is effective in treating swelling of the legs, for cold and aches, and for burning and scalds, while oil of Elderflower is indicated for belly aches. The manuscript is housed in a binding created by the Harvard Medical School library. Tipped into the binding is one letter from Frederick O. West, M.D., Harvard Medical School, Boston, Massachusetts, that accompanied his donation of the Kittredge receipt book to the library in 1919. There is also one letter of unknown provenance enclosed with the receipt book, which contains an inventory of the estate of Antipas Brigham, of Grafton, Massachusetts, signed by Worcester County Judge Joseph Wilder on 7 November 1749. It is unclear if this letter has any connection to Frederick O. West or Francis Kittredge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2000, Vladimir Putin came to power after nearly a decade of the rule of the first Russian president, Boris Yeltsin. As prime minister, and later as a candidate for president, Putin announced that he would reform the state. The main assumptions of this reform were presented during a congress of the pro-Kremlin Unity movement, in Putin's address entitled 'Russia at the turn of the millennium' which was delivered on 29 December 1999, and later in a open letter to voters published on 25 February 2000. Both declarations were rather general, but they gave a clear picture of the principal directions of and priority areas for the future president's efforts: they outlined Russia's development path as pro-market and democratic. Nearly seven years have passed since Vladimir Putin came to power, a time for a summary of his achievements. In a way, Vladimir Putin has partially delivered on his initial declarations; indeed, Russia has undergone a deep transformation. However, when seen in the light of the president’s initial promises, the changes appear to be no more than 'counter-reforms', because instead of putting into practice the policy he outlined seven years ago, they have largely followed a different, if not entirely opposite direction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract of the poster presented at the First international Congress of CiiEM “From Basic Sciences to Clinical Research”, 27-28 November 2015, Egas Moniz, Caparica, Portugal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poster presented at the First international Congress of CiiEM “From Basic Sciences to Clinical Research”, 27-28 November 2015, Egas Moniz, Caparica, Portugal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poster presented at the First international Congress of CiiEM “From Basic Sciences to Clinical Research”, 27-28 November 2015, Egas Moniz, Caparica, Portugal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poster presented at the First international Congress of CiiEM “From Basic Sciences to Clinical Research”, 27-28 November 2015, Egas Moniz, Caparica, Portugal.