933 resultados para system recovery
Resumo:
The thesis provides a framework for potential implementation of the design-build (DB) project delivery system in road infrastructure projects in Indonesia. This framework proposed a structure of the hierarchy of factors promoting the potential implementation of the DB project delivery system and introduced ways to implement the DB project delivery system through level of hierarchical factors. These findings not only give benefit to the academic knowledge but also to the public officials in guiding them with regard to the priority of promoting factors in the process to implement the DB system.
Resumo:
Awareness to avoid losses and casualties due to rain-induced landslide is increasing in regions that routinely experience heavy rainfall. Improvements in early warning systems against rain-induced landslide such as prediction modelling using rainfall records, is urgently needed in vulnerable regions. The existing warning systems have been applied using stability chart development and real-time displacement measurement on slope surfaces. However, there are still some drawbacks such as: ignorance of rain-induced instability mechanism, mislead prediction due to the probabilistic prediction and short time for evacuation. In this research, a real-time predictive method was proposed to alleviate the drawbacks mentioned above. A case-study soil slope in Indonesia that failed in 2010 during rainfall was used to verify the proposed predictive method. Using the results from the field and laboratory characterizations, numerical analyses can be applied to develop a model of unsaturated residual soils slope with deep cracks and subject to rainwater infiltration. Real-time rainfall measurement in the slope and the prediction of future rainfall are needed. By coupling transient seepage and stability analysis, the variation of safety factor of the slope with time were provided as a basis to develop method for the real-time prediction of the rain-induced instability of slopes. This study shows the proposed prediction method has the potential to be used in an early warning system against landslide hazard, since the FOS value and the timing of the end-result of the prediction can be provided before the actual failure of the case study slope.
Resumo:
In this study, we explore the relationship between the qualities of the information system environment and management accounting adaptability. The information system environment refers to three distinct elements: the degree of information system integration, system flexibility, and shared knowledge between business unit managers and the IT function. We draw on the literature on integrated information systems (IIS) and management accounting change and propose a model to test the hypothesized relationships. The sample for this study consists of Australian companies from all industries.