995 resultados para cooling-off period


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s Human Resource Information System (HRIS), Payroll System and Integrated Information for Iowa System (I/3) for the period March 26, 2012 through April 27, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Workforce Development (IWD) MyIowaUI and Unemployment Insurance Benefit systems for the period April 16, 2012 through May 4, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The focus of this report is a capacity analysis of two long-term urban freeway Work Zones. Work Zone #1 tapered four mainline lanes to two, using two separate tapers; Work Zone #2 tapered two mainline lanes to one. Work Zone throughput was analyzed throughout the day over multiple days and traffic operations conditions were analyzed up to a distance of five miles upstream of the Work Zone entrance. Historical data from pavement-embedded detectors were used to analyze traffic conditions. The database consisted of five-minute volume, speed and occupancy data collected from 78 detectors for a total of 50 days. Congestion during each analyzed Work Zone existed for more than fourteen hours each day; Work Zone impacts adversely affected freeway operations over distances of 3.7 to 4.2 miles. Speed and occupancy conditions further upstream were, however, not affected, or even improved due to significant trip diversion. Work Zone capacity was defined based on the maximum traffic flows observed over a one-hour period; throughput values were also compiled over longer periods of time when traffic was within 90% of the maximum observed one-hour flows, as well as over the multi-hour mid-day period. The Highway Capacity Manual freeway capacity definition based on the maximum observed 15-min period was not used, since it would have no practical application in estimating Work Zone throughput when congested conditions prevail for the majority of the hours of the day. Certain noteworthy changes took place for the duration of the analyzed Work Zones: per-lane throughput dropped; morning peak periods started earlier, evening peak periods ended later and lasted longer; mid-day volumes dropped accompanied by the highest occupancies of the day. Trip diversion was evident in lower volumes entering the analyzed freeway corridor, higher volumes using off-ramps and lower volumes using onramps upstream of the Work Zones. The majority of diverted traffic comprised smaller vehicles (vehicles up to 21 feet in length); combination truck volumes increased and their use of the median lane increased, contrary to smaller vehicles that shifted toward a heavier use of the shoulder lane.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the University of Northern Iowa Student Information System for the period June 12, 2012 through July 16, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the football program at Lincoln High School within the Des Moines Independent Community School District for the period May 30, 2003 through October 31, 2012

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Backup warning system devices were evaluated to determine if they would alert winter maintenance snow plow drivers to obstacles directly behind the trailer and out of view of the driver when a unit is backed up. When the sensors on the back of the tow plow were covered with snow during plowing operations, the sensor would go off in the cab and continue going off, which would result in drivers turning the volume of the unit way down. One shop stated that the wireless transmitted signal would be hit or miss depending on the winter weather that they were operating in. The sensors on the back of the tow plow trailer would come in contact with salt brine and in this situation one of the sensors did go bad. The weatherproof box that was designed to keep the system waterproof did not fully keep the moisture out. It was found that the system did alert drivers of items behind the unit and there were no backup accidents reported during the research period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Iowa Innovation Corporation for the period from October 24, 2011 (the date of inception) through June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Shared Visions Preschool Program and the Early Elementary Innovative Grants administered by the Department of Education for the period July 1, 2006 through June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Addendum to a report on a special investigation of the Iowa Department of Transportation for the period January 29, 1994 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Examination report on the City of Walcott, Iowa for the period July 1, 2012 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Examination report on the City of Glidden, Iowa for the period July 1, 2012 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reaudit report on the City of Remsen and the Remsen Municipal Utilities for the period July 1, 2010 through June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of the operations of the Poweshiek County Sheriff’s Office for the period January 1, 2010 through March 31, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of Remsen-Union Family Connections for the period July 1, 2011 through October 31, 2012