958 resultados para Urban Development
Resumo:
The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.
Resumo:
This paper presents the results of a pilot study examining the factors that impact most on the effective implementation of, and improvement to, Quality Mangement Sytems (QMSs) amongst Indonesian construction companies. Nine critical factors were identified from an extensive literature review, and a survey was conducted of 23 respondents from three specific groups (Quality Managers, Project Managers, and Site Engineers) undertaking work in the Indonesian infrastructure construction sector. The data has been analyzed initially using simple descriptive techniques. This study reveals that different groups within the sector have different opinions of the factors regardless of the degree of importance of each factor. However, the evaluation of construction project success and the incentive schemes for high performance staff, are the two factors that were considered very important by most of the respondents in all three groups. In terms of their assessment of tools for measuring contractor’s performance, additional QMS guidelines, techniques related to QMS practice provided by the Government, and benchmarking, a clear majority in each group regarded their usefulness as ‘of some importance’.
Resumo:
A finite element numerical simulation is carried out to examine stress distributions on railhead in the cicinity of the endpost of an insulated rail joint. The contact patch and pressure distribution are considered using modified Hertzian simulation. A combined elasto-plastic material modelling available in Abaqus is employed in the simulation. A dynamic load factor of 1.21 is considered in modelling for the wheel load based on a previous study as part of this on going research. Shakedown theorem is employed in this study. A peak pressure load which is above the shakedown limit is determined as input load. As a result, a progressive damage in the railhead has been captured as depicted in the equivalent plastic strain plot.
Resumo:
The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.
Resumo:
Accessibility to affordable housing for low income people are one of the housing problems in Indonesia, especially in major cities like Jakarta and Surabaya. Government has provided indirect subsidised on home ownership for low income people through planning instrument such as inclusionary zoning. However, low cost housing has been located in cheaper land which is very far from city and employment centre. This paper aims to discuss recent government initiatives to support low cost strata title housing in prime location which closer to the employment centre. This paper compares the characteristics of existing affordable housing solutions and focus on a new initiative as a case study. Learning from this initiative will allow a recommendation on application of similar scheme in other sites. The land availability, high construction cost, culture barriers and higher risk with lower return have been named as main barriers on repeating this model in other sites. Moreover, the high-rise solution is still very expensive compared to landed houses.
Resumo:
Accessibility to housing for low to moderate income groups in Australia has experienced a severe decline since 2002. On the supply side, the public sector has been reducing its commitment to the direct provision of public housing. Despite strong demand for affordable housing, limited supply has been generated by non-government housing providers. This paper identifies and discusses some current affordable housing solutions which have been developed by non-government housing providers to ameliorate the problem. This study utilises case studies generated from nineteen housing providers during in-depth interviews in South East Queensland in 2007-2008. The case studies are classified into four categories which relate to the nature of their product: affordable rental housing, mixed housing, affordable housing for people with special needs and low cost home ownership. Each category is discussed on the basis of the characteristics typical of that organisation of housing provider, their partnership arrangements and main target market. In addition, the special design and facilities required for people with special needs which include high care accommodation and aged care are highlighted. Finally, this study recommends offering a continuum of solutions to affordable housing for low income people by means of a rent-to-buy scheme.
Resumo:
Accessibility to housing for low to moderate income groups in Australia has been experiencing a severe decline since 2002. On the supply side, the public sector has been reducing its commitment to the direct provision of public housing. Despite strong demand for affordable housing, limited supply has been generated by nongovernment housing providers. This paper identifies and discusses some current affordable housing solutions to ameliorate the problem which have been developed by non-government housing providers. This study utilises case studies generated from nineteen housing providers during indepth interviews in South East Queensland in 2007-2008. The case studies are classified into four categories which relate to the nature of their product: affordable rental housing, mixed housing, affordable housing for people with special needs and low cost home ownership. Each category is discussed on the basis of the characteristics typical of that organisation of housing provider, their partnership arrangements and main target market. In addition, the special design and facilities required for people with special needs which include high care accommodation and aged care are highlighted. Finally, this study recommends offering a continuum of solutions to affordable housing for low income people by means of a rent-to-buy scheme.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.
Resumo:
This paper discusses the content, origin and development of Tendering Theory as a theory of price determination. It demonstrates how tendering theory determines market prices and how it is different from game and decision theories, and that in the tendering process, with non-cooperative, simultaneous, single sealed bids with individual private valuations, extensive public information, a large number of bidders and a long sequence of tendering occasions, there develops a competitive equilibrium. The development of a competitive equilibrium means that the concept of the tender as the sum of a valuation and a strategy, which is at the core of tendering theory, cannot be supported and that there are serious empirical, theoretical and methodological inconsistencies in the theory.
Resumo:
The concept of constructability is to use construction knowledge and experience during all phases of a project, particularly in the earliest phases of planning and design. It facilitates project objectives before delivery stage, and decreases unnecessary costs during construction phase. Despite the extensive use, constructability concept fails to address many issues related to Operation and Maintenance (O&M) of construction projects. Extending constructability concept, to include the O&M issues, could lead to the projects that are not fitted for construction purposes only, but also fitted for use. This study reviews the literature of constructability implementation, its benefits and shortcomings during the infrastructure life cycle, as well as the delivery success factors of infrastructure projects. This contributes to the propose need of a model to improve the effectiveness and efficiency of infrastructure project by extending the concept of constructability to include O&M. Development of such a model can facilitate post-occupancy stakeholders’ participation in a constructability program. It will help infrastructure owners eliminate project reworks, and improve O&M effectiveness and efficiency.
Resumo:
Sustainability Declarations were introduced by the Queensland State Government on 1 January 2010 as a compulsory measure for all dwelling sales. The purpose of this policy decision was to improve the relevance of sustainability in the home ownership decision making process. This paper assesses the initial impact of this initiative over its first year in operation. In partnership with the Real Estate Institute of Queensland, real estate agents and salespeople in Queensland were surveyed to determine what impact the Sustainability Declaration has had on home buyer decision making. The level of compliance by the real estate industry was also reviewed. These preliminary findings indicate a high level of compliance from the real estate industry, however results confirm that sustainability is yet to become a criterion of relevance to the majority of home buyers in Queensland. The Sustainability Declarations are a first step in raising awareness in home owners of the importance of sustainability in housing. Further monitoring of this impact will be carried out over time.
Resumo:
Many cities worldwide face the prospect of major transformation as the world moves towards a global information order. In this new era, urban economies are being radically altered by dynamic processes of economic and spatial restructuring. The result is the creation of ‘informational cities’ or its new and more popular name, ‘knowledge cities’. For the last two centuries, social production had been primarily understood and shaped by neo-classical economic thought that recognized only three factors of production: land, labor and capital. Knowledge, education, and intellectual capacity were secondary, if not incidental, factors. Human capital was assumed to be either embedded in labor or just one of numerous categories of capital. In the last decades, it has become apparent that knowledge is sufficiently important to deserve recognition as a fourth factor of production. Knowledge and information and the social and technological settings for their production and communication are now seen as keys to development and economic prosperity. The rise of knowledge-based opportunity has, in many cases, been accompanied by a concomitant decline in traditional industrial activity. The replacement of physical commodity production by more abstract forms of production (e.g. information, ideas, and knowledge) has, however paradoxically, reinforced the importance of central places and led to the formation of knowledge cities. Knowledge is produced, marketed and exchanged mainly in cities. Therefore, knowledge cities aim to assist decision-makers in making their cities compatible with the knowledge economy and thus able to compete with other cities. Knowledge cities enable their citizens to foster knowledge creation, knowledge exchange and innovation. They also encourage the continuous creation, sharing, evaluation, renewal and update of knowledge. To compete nationally and internationally, cities need knowledge infrastructures (e.g. universities, research and development institutes); a concentration of well-educated people; technological, mainly electronic, infrastructure; and connections to the global economy (e.g. international companies and finance institutions for trade and investment). Moreover, they must possess the people and things necessary for the production of knowledge and, as importantly, function as breeding grounds for talent and innovation. The economy of a knowledge city creates high value-added products using research, technology, and brainpower. Private and the public sectors value knowledge, spend money on its discovery and dissemination and, ultimately, harness it to create goods and services. Although many cities call themselves knowledge cities, currently, only a few cities around the world (e.g., Barcelona, Delft, Dublin, Montreal, Munich, and Stockholm) have earned that label. Many other cities aspire to the status of knowledge city through urban development programs that target knowledge-based urban development. Examples include Copenhagen, Dubai, Manchester, Melbourne, Monterrey, Singapore, and Shanghai. Knowledge-Based Urban Development To date, the development of most knowledge cities has proceeded organically as a dependent and derivative effect of global market forces. Urban and regional planning has responded slowly, and sometimes not at all, to the challenges and the opportunities of the knowledge city. That is changing, however. Knowledge-based urban development potentially brings both economic prosperity and a sustainable socio-spatial order. Its goal is to produce and circulate abstract work. The globalization of the world in the last decades of the twentieth century was a dialectical process. On one hand, as the tyranny of distance was eroded, economic networks of production and consumption were constituted at a global scale. At the same time, spatial proximity remained as important as ever, if not more so, for knowledge-based urban development. Mediated by information and communication technology, personal contact, and the medium of tacit knowledge, organizational and institutional interactions are still closely associated with spatial proximity. The clustering of knowledge production is essential for fostering innovation and wealth creation. The social benefits of knowledge-based urban development extend beyond aggregate economic growth. On the one hand is the possibility of a particularly resilient form of urban development secured in a network of connections anchored at local, national, and global coordinates. On the other hand, quality of place and life, defined by the level of public service (e.g. health and education) and by the conservation and development of the cultural, aesthetic and ecological values give cities their character and attract or repel the creative class of knowledge workers, is a prerequisite for successful knowledge-based urban development. The goal is a secure economy in a human setting: in short, smart growth or sustainable urban development.
Resumo:
Where a city or a country aspires to be in a decade or two from now on? How its social, economic and urban structures would be shaped by then? These are very complex two questions to answer precisely, just as it is not possible to accurately predict, especially in the wake of the recent global financial crisis, what a city or a country would be transformed into over the next decades. Under this uncertainly, the incredible speed of the knowledge that is generated, marketed, exchanged and applied in all parts of our lives – society, economy, environment – provides a hope for furthering the development of our cities and countries (Carrillo, 2006). This is to say, in today’s global knowledge economy knowledge and talent are continued to be seen as prerequisites for success as it was always the case in the course of history.
Resumo:
‘Knowledge’ is a resource, which relies on the past for a better future. In the 21st century, more than ever before, cities around the world depend on the knowledge of their citizens, their institutions and their firms and enterprises. The knowledge image, the human competence and the reputation of their public and private institutions and corporations profiles a city. It attracts investment, qualified labour and professionals, as well as students and researchers. And it creates local life spaces and professional milieus, which offer the quality of life to the citizens that are seeking to cope with the challenges of modern life in a competitive world. Integrating knowledge-based development in urban strategies and policies, beyond the provision of schools and locations for higher education, has become a new ambitious arena of city politics. Coming from theory to practice, and bringing together the manifold knowledge stakeholders in a city and preparing joint visions for the knowledge city is a new challenge for city managers, urban planners and leaders of the civic society . It requires visionary power, creativity, holistic thinking, the willingness to cooperate with all groups of the local civil society, and the capability to moderate communication processes to overcome conflicts and to develop joint action for a sustainable future.