999 resultados para St-Lawrence River


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little information is currently available from the various societies of cardiology on primary percutaneous coronary intervention (PCI) for acute myocardial infarction (AMI). Since primary PCI is the main method of reperfusion in AMI in many centres, and since of all cardiac emergencies AMI represents the most urgent situation for PCI, recommendations based on scientific evidence and expert experience would be useful for centres practising primary PCI, or those looking to establish a primary PCI programme. To this aim, a task force for primary PCI in AMI was formed to develop a set of recommendations to complement and assist clinical judgment. This paper represents the product of their recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the City of St. Charles, Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

River regulation for the purposes of public water supply causes the flow regime downstream of a dam to change. Traditionally, in the UK, such regulation was accompanied by requirements for reservoir releases to compensate downstream water users (e.g. industry) for the loss of natural flow (compensation flows). In this article, we compare a unique pre-impoundment macroinvertebrate data set for a regulated upland river with survey data post-impoundment. This allows a longitudinal assessment of the response of the system to regulation. The Derwent River, Northumberland, was impounded in 1966. Impacts on the hydrological regime were quantified by comparing long-term hydrographs, flow duration curves, flow ranges and flashiness indices for the pre-impoundment and post-impoundment periods. The comparison of changes in macroinvertebrate richness and diversity post-impoundment showed that the change in flow regime has had limited effect on the ecological community structure. The flow regime of the Derwent River has become less flashy with fewer extreme events, and the richness and the diversity of macroinvertebrates have, in some cases, increased and at worst have not deteriorated. We suggest that this reflects the strict compensation regime, which has guaranteed minimum flows at all times. Copyright (c) 2012 John Wiley & Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To assess the impact of introducing clinical practice guidelines on acute coronary syndrome without persistent ST segment elevation (ACS) on patient initial assessment. DESIGN: Prospective before-after evaluation over a 3-month period. SETTING: The emergency ward of a tertiary teaching hospital. PATIENTS: All consecutive patients with ACS evaluated in the emergency ward over the two 3-month periods. INTERVENTION: Implementation of the practice guidelines, and the addition of a cardiology consultant to the emergency team. MAIN OUTCOME MEASURES: Diagnosis, electrocardiogram interpretation, and risk stratification after the initial evaluation. RESULTS: The clinical characteristics of the 328 and 364 patients evaluated in the emergency ward for suspicion of ACS before and after guideline implementation were similar. Significantly more patients were classified as suffering from atypical chest pain (39.6% versus 47.0%; P = 0.006) after guideline implementation. Guidelines availability was associated with significantly more formal diagnoses (79.9% versus 92.9%; P < 0.0001) and risk stratification (53.7% versus 65.4%, P < 0.0001) at the end of initial assessment. CONCLUSION: Guidelines implementation, along with availability of a cardiology consultant in the emergency room had a positive impact on initial assessment of patients evaluated for suspicion of ACS. It led to increased confidence in diagnosis and stratification by risk, which are the first steps in initiating effective treatment for this common condition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Great River Regional Waste Authority for the year ended June 30, 2012