983 resultados para Service product


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Performance-related pay within public organizations is continuing to spread. Although it can help to strengthen an entrepreneurial spirit in civil servants, its implementation is marred by technical, financial, managerial and cultural problems. This article identifies an added problem, namely the contradiction that exists between a managerial discourse that emphasizes the team and collective performance, on the one hand, and the use of appraisal and reward tools that are above all individual, on the other. Based on an empirical survey carried out within Swiss public organizations, the analysis shows that the team is currently rarely taken into account and singles out the principal routes towards an integrated system for the management and rewarding of civil servants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Appanoose County Service Agency in Centerville, Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Weathering steel is commonly used as a cost-effective alternative for bridge superstructures, as the costs and environmental impacts associated with the maintenance/replacement of paint coatings are theoretically eliminated. The performance of weathering steel depends on the proper formation of a surface patina, which consists of a dense layer of corrosion product used to protect the steel from further atmospheric corrosion. The development of the weathering steel patina may be hindered by environmental factors such as humid environments, wetting/drying cycles, sheltering, exposure to de-icing chlorides, and design details that permit water to pond on steel surfaces. Weathering steel bridges constructed over or adjacent to other roadways could be subjected to sufficient salt spray that would impede the development of an adequate patina. Addressing areas of corrosion on a weathering steel bridge superstructure where a protective patina has not formed is often costly and negates the anticipated cost savings for this type of steel superstructure. Early detection of weathering steel corrosion is important to extending the service life of the bridge structure; however, written inspection procedures are not available for inspectors to evaluate the performance or quality of the patina. This project focused on the evaluation of weathering steel bridge structures, including possible methods to assess the quality of the weathering steel patina and to properly maintain the quality of the patina. The objectives of this project are summarized as follows:  Identify weathering steel bridge structures that would be most vulnerable to chloride contamination, based on location, exposure, environment, and other factors.  Identify locations on an individual weathering steel bridge structure that would be most susceptible to chloride contamination, such as below joints, splash/spray zones, and areas of ponding water or debris.  Identify possible testing methods and/or inspection techniques for inspectors to evaluate the quality of the weathering steel patina at locations discussed above.  Identify possible methods to measure and evaluate the level of chloride contamination at the locations discussed above.  Evaluate the effectiveness of water washing on removing chlorides from the weathering steel patina.  Develop a general prioritization for the washing of bridge structures based on the structure’s location, environment, inspection observations, patina evaluation findings, and chloride test results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

[Acte royal. 1788-07-01. Versailles]