976 resultados para Owen, Edward Roderic, 1856-1896.
Resumo:
Mode of access: Internet.
Resumo:
Engraving, 19 x 19 cm. Original painting by J.F. Cropsey dated 1856. Publication information: New York : R. Leggett, 1856
Resumo:
Jenison, Edward S., architect. University Hall was built in 1872; the auditorium completed in 1873. Prior to this time there was no place on campus where students and faculty could assemble. New opera seats were put in during Christmas 1896 at the same time the new dome was installed. On verso: University Hall -- 133 feet wide, 140 long, seating capacity about 3000. Photographed in 1887 [June 8] by A.L. Colton, '89
Resumo:
Jenison, Edward S., architect. University Hall was built in 1872; the auditorium completed in 1873. Prior to this time there was no place on campus where students and faculty could assemble. New opera seats were put in during Christmas 1896 at the same time the new dome was installed. Photographer's stamp on verso: Randall ' 76, 220 Woodward Avenue, Detroit, Mich.
Resumo:
[From Jasper Cropsey Sketch book, 1855-1856]
Resumo:
[From Jasper Cropsey Sketch book, 1855-1856]
Resumo:
[From Jasper Cropsey Sketch book, 1855-1856]
Resumo:
[Dave Owen ., copy neg from MSU original]