990 resultados para Instrument construction


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hidden Markov model (HMM)-based speech synthesis systems possess several advantages over concatenative synthesis systems. One such advantage is the relative ease with which HMM-based systems are adapted to speakers not present in the training dataset. Speaker adaptation methods used in the field of HMM-based automatic speech recognition (ASR) are adopted for this task. In the case of unsupervised speaker adaptation, previous work has used a supplementary set of acoustic models to estimate the transcription of the adaptation data. This paper first presents an approach to the unsupervised speaker adaptation task for HMM-based speech synthesis models which avoids the need for such supplementary acoustic models. This is achieved by defining a mapping between HMM-based synthesis models and ASR-style models, via a two-pass decision tree construction process. Second, it is shown that this mapping also enables unsupervised adaptation of HMM-based speech synthesis models without the need to perform linguistic analysis of the estimated transcription of the adaptation data. Third, this paper demonstrates how this technique lends itself to the task of unsupervised cross-lingual adaptation of HMM-based speech synthesis models, and explains the advantages of such an approach. Finally, listener evaluations reveal that the proposed unsupervised adaptation methods deliver performance approaching that of supervised adaptation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sir John Egan’s 1998 report on the construction industry (Construction Task Force 1998) noted its confrontational and adversarial nature. Both the original report and its subsequent endorsement in Accelerating Change (Strategic Forum 2002) called for improved working relationships—so-called ‘integration’—within and between both design and construction aspects. In this paper, we report on our observations of on-site team meetings for a major UK project during its construction phase. We attended a series of team meetings and recorded the patterns of verbal interaction that took place within them. In reporting our findings, we have deliberately used a graphical method for presenting the results, in the expectation that this will make them more readily accessible to designers. Our diagrams of these interaction patterns have already proved to be intuitively and quickly understood, and have generated interest and discussion among both those we observed and others who have seen them. We noted that different patterns of communication occurred in different types of meetings. Specifically, in the problem-solving meeting, there was a richness of interaction that was largely missing from progress meetings and technical meetings. Team members expressed greater satisfaction with this problem-solving meeting where these enriched exchanges took place. By making comparisons between the different patterns, we are also able to explore functional roles and their interactions. From this and other published evidence, we conclude that good teamworking practices depend on a complex interplay of relations and dependencies embedded within the team.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fishing boats and canoes varied very little in Uganda from the middle of the 19th century umil 1949. types in use being the Dug Out Canoe. up to 40 ft. in length with 4 ft. beam hollowed from trees, and "Sesse" canoes which were used on Lake Victoria; these had an obvious Arab influence. The length of the "Sesse" in recent years as from about 1912 is 28 ft., and it is used as an open fishing craft.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The specific objectives were to: WATER QUALITY 1. To measure the water physical variables as indicators of environmental conditions in the upstream and downstream transects of Kalange (1) and Buyala (2), respectively, 2. To determine the concentrations of total suspended solids as a major constituent likely to be released into the waters at any time during the construction activities, by comparing the concentrations at the two transects. FISH CATCH 1. To follow up trends in fish catch as construction activity progresses, and to precision of the estimate; 2. To estimate the prevailing fish catch rates, total fish catches and the total value of the fish catch to the local fishers at the two transects.