932 resultados para Children -- Recreation -- Case studies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

We propose a method denoted as synthetic portfolio for event studies in market microstructure that is particularly interesting to use with high frequency data and thinly traded markets. The method is based on Synthetic Control Method and provides a robust data driven method to build a counterfactual for evaluating the effects of the volatility call auctions. We find that SMC could be used if the loss function is defined as the difference between the returns of the asset and the returns of a synthetic portfolio. We apply SCM to test the performance of the volatility call auction as a circuit breaker in the context of an event study. We find that for Colombian Stock Market securities, the asynchronicity of intraday data reduces the analysis to a selected group of stocks, however it is possible to build a tracking portfolio. The realized volatility increases after the auction, indicating that the mechanism is not enhancing the price discovery process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In aircraft components maintenance shops, components are distributed amongst repair groups and their respective technicians based on the type of repair, on the technicians skills and workload, and on the customer required dates. This distribution planning is typically done in an empirical manner based on the group leader’s past experience. Such a procedure does not provide any performance guarantees, leading frequently to undesirable delays on the delivery of the aircraft components. Among others, a fundamental challenge faced by the group leaders is to decide how to distribute the components that arrive without customer required dates. This paper addresses the problems of prioritizing the randomly arriving of aircraft components (with or without pre-assigned customer required dates) and of optimally distributing them amongst the technicians of the repair groups. We proposed a formula for prioritizing the list of repairs, pointing out the importance of selecting good estimators for the interarrival times between repair requests, the turn-around-times and the man hours for repair. In addition, a model for the assignment and scheduling problem is designed and a preliminary algorithm along with a numerical illustration is presented.