986 resultados para Behavioral management
Resumo:
The MAP-i Doctoral Program of the Universities of Minho, Aveiro and Porto.
Resumo:
Through the analysis of the exceptional accounting documents of 1517 related to the construction of the Monastery of Jerónimos (Lisbon), this paper discusses the main characteristics of a new model of construction site organization. In the later Middle Ages we can find, among others, two main models of constructing site organization. One, older and more widespread, consisted in a centralized and pyramidal management model. The other, apparently more recent, was based in the existence of several autonomous teams working simultaneously, each one responsible for building a specific part or section of the building. This paper describes and discusses this new organizational model as it was adopted and implemented by João de Castilho (1470–1552) for the construction of the Monastery of Jerónimos in 1517, probably for the first time in Portugal, but with some parallels in other places in Europe.
Resumo:
The Prognostic Health Management (PHM) has been asserting itself as the most promising methodology to enhance the effective reliability and availability of a product or system during its life-cycle conditions by detecting current and approaching failures, thus, providing mitigation of the system risks with reduced logistics and support costs. However, PHM is at an early stage of development, it also expresses some concerns about possible shortcomings of its methods, tools, metrics and standardization. These factors have been severely restricting the applicability of PHM and its adoption by the industry. This paper presents a comprehensive literature review about the PHM main general weaknesses. Exploring the research opportunities present in some recent publications, are discussed and outlined the general guide-lines for finding the answer to these issues.
Resumo:
Objetivo do presente trabalho foi estudar a influência dos diferentes sistemas de fios (trama, teia de base e teia da argola) no desempenho dos tecidos de felpos, no que concerne às propriedades de absorção, capilaridade e libertação de humidade. Para este estudo usaram-se quatro tipos de combinações destes sistemas de fios, para a mesma estrutura de tecidos de felpo, na teia de base utilizou-se somente fios de Tencel®, na teia de argola e da trama varou-se a composição dos fios entre fios de algodão e de Tencel®. Os resultados obtidos demonstram que quando a utilização fios de Tencel® em qualquer dos sistemas (trama ou teia da argola) favorece a capacidade de difusão de líquidos na estrutura, a utilização de fios de algodão na teia de argola favorece a capacidade de absorção.
Resumo:
Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
This study focuses on the granite mountain known as Monte Pindo (627 m above sea level) in the Autonomous Community of Galicia (NW Spain). This territory is included in the area classified as “Costa da Morte” in the “Politica de Ordenación Litoral” (POL) (Coastal Planning Policy) for the region of Galicia. This coastal unit, located between “Rías Baixas” and “Cape Fisterra” has great potential for demonstrating geological processes and its geomorphological heritage is characterized by a high degree of geodiversity of granite landforms. The main objective of our work is to assess the geomorphological heritage of the site, thus revealing its wide geodiversity. We shall analyze and highlight: its scientific value, developing an inventory of granite landforms; its educational valuel and its geotouristic potential. It must be ensured that the Administration understands that natural diversity is composed of both geodiversity and biodiversity. Only then will the sustainable management of Monte Pindo become possible by integrating natural and cultural heritage values. The goal is to ensure that Monte Pindo and its immediate surroundings become a geopark with the aim of promoting local development projects based on the conservation and valorization of its geological heritage.
Resumo:
ICEIM – International Conference in Entrepreneurship and Innovation Management, Roma, 17-18 de setembro de 2015.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação
Resumo:
OBJETIVO: Realizar uma revisão de estudos sobre programa de tratamento assertivo na comunidade (PACT) e case management para verificar se os resultados demonstram desfechos mais favoráveis quando tais modelos são implementados na rede comunitária de assistência para portadores de doença mental grave e persistente. MÉTODOS: A coleta de artigos - publicados entre 1985 e 2005 - foi realizada em duas etapas: a primeira, na base de dados PubMed, com expressões-chave mental health, community care, services evaluation e seleção de artigos cuja temática era PACT e case management, e a segunda, no banco de dados da revista Psychiatric Services, com palavras-chave assertive community treatment, PACT e case management. Foram desconsiderados estudos que analisavam serviços exclusivos para crianças, idosos e pacientes com diagnóstico único de abuso de álcool/drogas; abordavam unicamente os custos da intervenção e se referiam exclusivamente a serviços hospitalares. RESULTADOS: A partir da leitura dos 73 estudos selecionados, os autores descreveram oito categorias nas quais os artigos foram agrupados, visto que um artigo poderia pertencer a mais de uma categoria. CONCLUSÕES: O PACT e o case management são estratégias importantes e reconhecidamente mais eficazes, quando comparados a outros modelos de cuidado, em trazer evoluções favoráveis para indivíduos com doença mental grave e persistente.
Resumo:
Dissertação de mestrado em Sistemas de Informação
Resumo:
OBJECTIVE: To assess the frequency of comorbidities of mental and behavioral disorders (CMBD) in psychoactive substance (PAS)-dependent patients with different periods of abstinence cared for at Alcohol and Other Drug Psychosocial Care Centers (CAPS-ad). METHOD: All patients under treatment in the two CAPS-ad of the city of Uberlândia-MG, between April and September 2010, were consecutively assessed. The ICD-10 symptom checklist was used to diagnose CMBD; additional information was obtained from interviews and medical records. The patients were divided according to duration of abstinence: < 1 week (Group 1); 1-4 weeks (Group 2); and > 4 weeks (Group 3). RESULTS: Of all patients assessed, 62.8% were diagnosed with CMBD, which were more frequent (p < 0.05) in Group 1 (72%) than Group 3 (54.2%), and both groups were similar to Group 2 (61%). Depressive and anxiety disorders were more frequent among patients of Group 1. Mood disorders were more frequent (p < 0.05) in women [22/34 (65%) vs. 54/154 (35.1%)], whereas psychotic disorders were more frequent (p = 0.05) in men [16/154 (10.4%) vs. 0]. The presence of CMBD was associated with more severe clinical conditions. CONCLUSIONS: The higher frequency of diagnosis of CMBD in patients of Group 1 may have resulted from the difficulties in distinguishing mental disorders that are due to PAS intoxication or withdrawal from those that are not. However, to make the diagnosis of CMBD, even during detoxification, can increase the likelihood of better response to treatment.
Resumo:
Large scale distributed data stores rely on optimistic replication to scale and remain highly available in the face of net work partitions. Managing data without coordination results in eventually consistent data stores that allow for concurrent data updates. These systems often use anti-entropy mechanisms (like Merkle Trees) to detect and repair divergent data versions across nodes. However, in practice hash-based data structures are too expensive for large amounts of data and create too many false conflicts. Another aspect of eventual consistency is detecting write conflicts. Logical clocks are often used to track data causality, necessary to detect causally concurrent writes on the same key. However, there is a nonnegligible metadata overhead per key, which also keeps growing with time, proportional with the node churn rate. Another challenge is deleting keys while respecting causality: while the values can be deleted, perkey metadata cannot be permanently removed without coordination. Weintroduceanewcausalitymanagementframeworkforeventuallyconsistentdatastores,thatleveragesnodelogicalclocks(BitmappedVersion Vectors) and a new key logical clock (Dotted Causal Container) to provides advantages on multiple fronts: 1) a new efficient and lightweight anti-entropy mechanism; 2) greatly reduced per-key causality metadata size; 3) accurate key deletes without permanent metadata.
Resumo:
Objective To conduct a systematic review about the long-term response to cognitive-behavioral therapy (CBT) for anxiety disorders (ADs) in children and adolescents. Methods The PubMed and ISI Web of Science databases were consulted. Search in the databases was performed in November 2012 and included cohort studies after CBT for ADs in children and adolescents with a follow-up period over 12 months. Results A total of 10 papers met the inclusion criteria. The follow-up period ranged from 12 months to 13 years and the results generally showed maintenance of the short-term benefits with CBT. However, the studies presented limitations, especially regarding methods, such as lack of a control group and losses to follow-up. Conclusion The long-term benefits of CBT were identified, however it would be interesting to conduct other studies with more frequent assessment periods, in order to minimize losses to follow-up, in addition to evaluating children and adolescents in the various stages of their development.