975 resultados para cost estimate
Resumo:
The main aim of this research was to develop cost of poor quality calculation model which will better reflect business impacts of lost productivity caused by IT incidents for the case company. This objective was pursued by reviewing literature and conducting a study in a Finnish multinational manufacturing company. Broad analysis of the scientific literature allowed to identify main theories and models of Cost of Poor Quality and provided better base for development of measurements of business impacts of lost productivity. Empirical data was gathered with semi-structured interviews and internet based survey. In total, twelve interviews with experts and 39 survey results from business stakeholders were gathered. Main results of empirical study helped to develop the measurement model of cost of poor quality and it was tied to incident priority matrix. Nevertheless, the model was created based on available data. Main conclusions of the thesis were that cost of poor quality measurements could be even further improved if additional data points could be used. New model takes into consideration different cost regions and utilizes on this notion.
Resumo:
[Institutes (français-latin). 1669]
Resumo:
[Institutes (français-latin). 1669]
Resumo:
Contient : 1 à 71 Ce recueil comprend soixante et onze pièces, dont quinze en espagnol. Les rois Louis XIV et Philippe IV, le cardinal Mazarin, Michel Le Tellier, Pierre de Marca, archevêque de Toulouse, Hyacinthe Serroni, évêque d'Orange, don Miguel Çalba, don Joseph Romeu, le marquis de Mortara, Etienne Baluze, le « docteur Pont, chanoine et archidiacre de la Seu d'Urgel, abbé nommé d'Arles », et « don Joseph de Margarit, marquis d'Aguilar, gouverneur de Catalogne », figurent ici ou comme auteurs ou comme destinataires. Les dates extrêmes sont le 26 novembre 1659 et le 12 novembre 1660
Resumo:
The purpose of the present study was to examine the role of the bystander in bullying situations. A cost/benefit model was explored in researching factors adolescents consider in deciding whether to intervene when witnessing bullying. Adolescents in the present study (N = 101 (50.5% female), between the ages of 12 to 18, M = 15.37 years; SD = 1.71 years) completed self-report questionnaires, and also responded to bullying scenarios, stating how the bystander would react, while explaining potential personal costs and benefits. Adolescents were able to articulate various personal costs and benefits when making the decision to intervene. Conclusions of the present study include: 1) the evolutionary approach is quite informative in illuminating the decision process of the bystander, 2) adolescents’ beliefs about bullying and the role of bystanders are different from their teachers’, and 3) the rather explicit cost/benefit model could be used to develop more targeted anti-bullying programs.
Resumo:
Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines, April 1847.
Resumo:
Handwritten sheet of paper detailing the cost of transporting boxes containing the Gravatt’s level from London to St. Catharines. This sheet is signed by S.D. Woodruff, Jan. 11, 1847.
Resumo:
Original estimate of Mr. Danforth on the Port Dalhousie and Thorold Railway (1 page, handwritten), Nov. 3, 1853.
Resumo:
Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.
Resumo:
Port Dalhousie and Thorold Railway estimate of work done to date with an approximation of probable damage sustained by suspending the track, Aug. 22, 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Aug. 31, 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month of August, 1854, signed by S.D. Woodruff, Sept. 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Sept. 30, 1854.