970 resultados para completion


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: Shifting gaze and attention ahead of the hand is a natural component in the performance of skilled manual actions. Very few studies have examined the precise co-ordination between the eye and hand in children with Developmental Coordination Disorder (DCD). Methods This study directly assessed the maturity of eye-hand co-ordination in children with DCD. A double-step pointing task was used to investigate the coupling of the eye and hand in 7-year-old children with and without DCD. Sequential targets were presented on a computer screen, and eye and hand movements were recorded simultaneously. Results There were no differences between typically developing (TD) and DCD groups when completing fast single-target tasks. There were very few differences in the completion of the first movement in the double-step tasks, but differences did occur during the second sequential movement. One factor appeared to be the propensity for the DCD children to delay their hand movement until some period after the eye had landed on the target. This resulted in a marked increase in eye-hand lead during the second movement, disrupting the close coupling and leading to a slower and less accurate hand movement among children with DCD. Conclusions In contrast to skilled adults, both groups of children preferred to foveate the target prior to initiating a hand movement if time allowed. The TD children, however, were more able to reduce this foveation period and shift towards a feedforward mode of control for hand movements. The children with DCD persevered with a look-then-move strategy, which led to an increase in error. For the group of DCD children in this study, there was no evidence of a problem in speed or accuracy of simple movements, but there was a difficulty in concatenating the sequential shifts of gaze and hand required for the completion of everyday tasks or typical assessment items.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Intrusive reexperiencing in posttraumatic stress disorder (PTSD) has been linked to perceptual priming for trauma-related material. A prospective longitudinal study (N = 69) investigated perceptual priming for trauma-related, general threat, and neutral words in assault survivors with and without PTSD, using a new version of the word-stem completion task. Survivors with PTSD showed enhanced priming for trauma-related words. Furthermore, priming for trauma-related words measured soon after the trauma was associated with subsequent PTSD severity at 3 6, and 9 months. The enhanced priming effect was specific to trauma-related words. Enhanced perceptual priming for traumatic material appears to be one of the cognitive processes operating in PTSD.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study examined age differences in the accessibility of a single pool of naturally occurring intentions both before and after completion. Following Maylor, Darby, and Della Sala (2000), accessibility was measured in terms of the number of activities generated in a 4-minute activity fluency task. Each participant undertook two such tasks. A prospective task in which they generated activities intended for completion during the following week and a retrospective task, I week later, in which they generated activities carried out over the previous week. In a partial replication of Maylor et al.'s findings, young, but not healthy older, adults generated more to-be-completed intentions than completed ones, demonstrating an intention-superiority effect (ISE) for everyday activities. The absence of an ISE for older adults appeared to reflect the reduced accessibility of intentions prior to completion, rather than the impaired inhibition of fulfilled intentions. Moreover, both groups showed greater inaccessibility of completed than intended activities, thus demonstrating an intentioncompletion effect for naturally occurring intentions that is preserved in healthy ageing (cf. Marsh, Hicks, & Bink, 1998). Despite showing a reduced accessibility of intended activities, older adults reported having completed a greater proportion of their intentions during the week than young adults. Moreover, there was a correlation between the ability to access intentions and the proportion of intentions completed only for young adults. These observations suggest that older adults' everyday prospective memory performance may be relatively less dependent on intention accessibility and more dependent on other factors. While there was no age difference in the reported use and effectiveness of external retrieval aids, older adults demonstrated a greater level of temporal organization in the production of their intentions in the fluency task. This is consistent with the possibility that older adults may have more structured daily lives and may be able to use information about the sequence of ongoing events to support superior everyday prospective remembering.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research shows that poor indoor air quality (IAQ) in school buildings can cause a reduction in the students' performance assessed by short-term computer-based tests: whereas good air quality in classrooms can enhance children's concentration and also teachers' productivity. Investigation of air quality in classrooms helps us to characterise pollutant levels and implement corrective measures. Outdoor pollution, ventilation equipment, furnishings, and human activities affect IAQ. In school classrooms, the occupancy density is high (1.8-2.4m(2)/person) compared to offices (10 m(2)/person). Ventilation systems expend energy and there is a trend to save energy by reducing ventilation rates. We need to establish the minimum acceptable level of fresh air required for the health of the occupants. This paper describes a project, which will aim to investigate the effect of IAQ and ventilation rates on pupils' performance and health using psychological tests. The aim is to recommend suitable ventilation rates for classrooms and examine the suitability of the air quality guidelines for classrooms. The air quality, ventilation rates and pupils' performance in classrooms will be evaluated in parallel measurements. In addition, Visual Analogue Scales will be used to assess subjective perception of the classroom environment and SBS symptoms. Pupil performance will be measured with Computerised Assessment Tests (CAT), and Pen and Paper Performance Tasks while physical parameters of the classroom environment will be recorded using an advanced data logging system. A total number of 20 primary schools in the Reading area are expected to participate in the present investigation, and the pupils participating in this study will be within the age group of 9-11 years. On completion of the project, based oil the overall data recommendations for suitable ventilation rates for schools will be formulated. (C) 2006 Elsevier Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The performance benefit when using Grid systems comes from different strategies, among which partitioning the applications into parallel tasks is the most important. However, in most cases the enhancement coming from partitioning is smoothed by the effect of the synchronization overhead, mainly due to the high variability of completion times of the different tasks, which, in turn, is due to the large heterogeneity of Grid nodes. For this reason, it is important to have models which capture the performance of such systems. In this paper we describe a queueing-network-based performance model able to accurately analyze Grid architectures, and we use the model to study a real parallel application executed in a Grid. The proposed model improves the classical modelling techniques and highlights the impact of resource heterogeneity and network latency on the application performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a clocking pipeline technique referred to as a single-pulse pipeline (PP-Pipeline) and applies it to the problem of mapping pipelined circuits to a Field Programmable Gate Array (FPGA). A PP-pipeline replicates the operation of asynchronous micropipelined control mechanisms using synchronous-orientated logic resources commonly found in FPGA devices. Consequently, circuits with an asynchronous-like pipeline operation can be efficiently synthesized using a synchronous design methodology. The technique can be extended to include data-completion circuitry to take advantage of variable data-completion processing time in synchronous pipelined designs. It is also shown that the PP-pipeline reduces the clock tree power consumption of pipelined circuits. These potential applications are demonstrated by post-synthesis simulation of FPGA circuits. (C) 2004 Elsevier B.V. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Typically, the relationship between insect development and temperature is described by two characteristics: the minimum temperature needed for development to occur (T-min) and the number of day degrees required (DDR) for the completion of development. We investigated these characteristics in three English populations of Thrips major and T tabaci [Cawood, Yorkshire (N53degrees49', W1degrees7'); Boxworth, Cambridgeshire (N52degrees15', W0degrees1'); Silwood Park, Berkshire (N51degrees24', W0degrees38')], and two populations of Frankliniella occidentalis (Cawood; Silwood Park). While there were no significant differences among populations in either T-min (mean for T major = 7.0degreesC; T tabaci = 5.9degreesC; F. occidentalis = 6.7degreesC) or DDR (mean for T major = 229.9; T tabaci = 260.8; F occidentalis = 233.4), there were significant differences in the relationship between temperature and body size, suggesting the presence of geographic variation in this trait. Using published data, in addition to those newly collected, we found a negative relationship between T-min. and DDR for F occidentalis and T tabaci, supporting the hypothesis that a trade-off between T-min and DDR may constrain adaptation to local climatic conditions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Anxiety disorders in childhood are common, disabling and run a chronic course. Cognitive Behaviour Therapy (CBT) effective but is expensive and trained therapists are scarce. Guided self-help treatments may be a means of widening access to treatment. This study aimed to examine the feasibility of guided CBT self-help for childhood anxiety disorders in Primary Care, specifically in terms of therapist adherence, patient and therapist satisfaction and clinical gain. Participants were children aged 5-12 years referred to two Primary Child and Adolescent Mental Health Services (PCAMHSs) in Oxfordshire, UK, who met diagnostic criteria for a primary anxiety disorder. Of the 52 eligible children, 41 anxious children were assessed for anxiety severity and interference before and after receiving CBT self-help, delivered via the parent (total therapy time= 5 hours) by Primary Mental Health Workers (PMHWs). Therapy sessions were rated for treatment adherence and patients and PMHWs completed satisfaction questionnaires after treatment completion. Over 80% of therapy sessions were rated at a high level of treatment adherence. Parents and PMHWs reported high satisfaction with the treatment. 61% of the children assessed no longer met criteria for their primary anxiety disorder diagnosis following treatment, and 76% were rated as ‘much’/’very much’ improved on the Clinician’s Global Impression-Improvement scale. There were significant reductions on parent and child report measures of anxiety symptoms, interference, and depression. Preliminary exploration indicated that parental anxiety was associated with child treatment outcome. The findings suggest that guided CBT self-help represents a promising treatment for childhood anxiety in primary care.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Current forest Free Air CO2 Enrichment (FACE) experiments are reaching completion. Therefore, it is time to define the scientific goals and priorities of future experimental facilities. In this opinion article, we discuss the following three overarching issues (i) What are the most urgent scientific questions and how can they be addressed? (ii) What forest ecosystems should be investigated? (iii) Which other climate change factors should be coupled with elevated CO2 concentrations in future experiments to better predict the effects of climate change? Plantations and natural forests can have conflicting purposes for high productivity and environmental protection. However, in both cases the assessment of carbon balance and how this will be affected by elevated CO2 concentrations and the interacting climate change factors is the most pressing priority for future experiments.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a semi-synchronous pipeline scheme, here referred as single-pulse pipeline, to the problem of mapping pipelined circuits to a Field Programmable Gate Array (FPGA). Area and timing considerations are given for a general case and later applied to a systolic circuit as illustration. The single-pulse pipeline can manage asynchronous worst-case data completion and it is evaluated against two chosen asynchronous pipelining: a four-phase bundle-data pipeline and a doubly-latched asynchronous pipeline. The semi-synchronous pipeline proposal takes less FPGA area and operates faster than the two selected fully-asynchronous schemes for an FPGA case.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Real estate development appraisal is a quantification of future expectations. The appraisal model relies upon the valuer/developer having an understanding of the future in terms of the future marketability of the completed development and the future cost of development. In some cases the developer has some degree of control over the possible variation in the variables, as with the cost of construction through the choice of specification. However, other variables, such as the sale price of the final product, are totally dependent upon the vagaries of the market at the completion date. To try to address the risk of a different outcome to the one expected (modelled) the developer will often carry out a sensitivity analysis on the development. However, traditional sensitivity analysis has generally only looked at the best and worst scenarios and has focused on the anticipated or expected outcomes. This does not take into account uncertainty and the range of outcomes that can happen. A fuller analysis should include examination of the uncertainties in each of the components of the appraisal and account for the appropriate distributions of the variables. Similarly, as many of the variables in the model are not independent, the variables need to be correlated. This requires a standardised approach and we suggest that the use of a generic forecasting software package, in this case Crystal Ball, allows the analyst to work with an existing development appraisal model set up in Excel (or other spreadsheet) and to work with a predetermined set of probability distributions. Without a full knowledge of risk, developers are unable to determine the anticipated level of return that should be sought to compensate for the risk. This model allows the user a better understanding of the possible outcomes for the development. Ultimately the final decision will be made relative to current expectations and current business constraints, but by assessing the upside and downside risks more appropriately, the decision maker should be better placed to make a more informed and “better”.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Uncertainty affects all aspects of the property market but one area where the impact of uncertainty is particularly significant is within feasibility analyses. Any development is impacted by differences between market conditions at the conception of the project and the market realities at the time of completion. The feasibility study needs to address the possible outcomes based on an understanding of the current market. This requires the appraiser to forecast the most likely outcome relating to the sale price of the completed development, the construction costs and the timing of both. It also requires the appraiser to understand the impact of finance on the project. All these issues are time sensitive and analysis needs to be undertaken to show the impact of time to the viability of the project. The future is uncertain and a full feasibility analysis should be able to model the upside and downside risk pertaining to a range of possible outcomes. Feasibility studies are extensively used in Italy to determine land value but they tend to be single point analysis based upon a single set of “likely” inputs. In this paper we look at the practical impact of uncertainty in variables using a simulation model (Crystal Ball ©) with an actual case study of an urban redevelopment plan for an Italian Municipality. This allows the appraiser to address the issues of uncertainty involved and thus provide the decision maker with a better understanding of the risk of development. This technique is then refined using a “two-dimensional technique” to distinguish between “uncertainty” and “variability” and thus create a more robust model.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Carsberg (2002) suggested that the periodic valuation accuracy studies undertaken by, amongst others, IPD/Drivers Jonas (2003) should be undertaken every year and be sponsored by the RICS, which acts as the self-regulating body for valuations in the UK. This paper does not address the wider issues concerning the nature of properties which are sold and whether the sale prices are influenced by prior valuations, but considers solely the technical issues concerning the timing of the valuation and sales data. This study uses valuations and sales data from the Investment Property Databank UK Monthly Index to attempt to identify the date that sale data is divulged to valuers. This information will inform accuracy studies that use a cut-off date as to the closeness of valuations to sales completion date as a yardstick for excluding data from the analysis. It will also, assuming valuers are informed quickly of any agreed sales, help to determine the actual sale agreed date rather than the completion date, which includes a period of due diligence between when the sale is agreed and its completion. Valuations should be updated to this date, rather than the formal completion date, if a reliable measure of valuation accuracy is to be determined. An accuracy study is then undertaken using a variety of updating periods and the differences between the results are examined. The paper concludes that the sale only becomes known to valuers in the month prior to the sale taking place and that this assumes either that sales due diligence procedures are shortening or valuers are not told quickly of agreed sale prices. Studies that adopt a four-month cut-off date for any valuations compared to sales completion dates are over cautious, and this could be reduced to two months without compromising the data.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper draws from a wider research programme in the UK undertaken for the Investment Property Forum examining liquidity in commercial property. One aspect of liquidity is the process by which transactions occur including both how properties are selected for sale and the time taken to transact. The paper analyses data from three organisations; a property company, a major financial institution and an asset management company, formally a major public sector pension fund. The data covers three market states and includes sales completed in 1995, 2000 and 2002 in the UK. The research interviewed key individuals within the three organisations to identify any common patterns of activity within the sale process and also identified the timing of 187 actual transactions from inception of the sale to completion. The research developed a taxonomy of the transaction process. Interviews with vendors indicated that decisions to sell were a product of a combination of portfolio, specific property and market based issues. Properties were generally not kept in a “readiness for sale” state. The average time from first decision to sell the actual property to completion had a mean time of 298 days and a median of 190 days. It is concluded that this study may underestimate the true length of the time to transact for two reasons. Firstly, the pre-marketing period is rarely recorded in transaction files. Secondly, and more fundamentally, studies of sold properties may contain selection bias. The research indicated that vendors tended to sell properties which it was perceived could be sold at a ‘fair’ price in a reasonable period of time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The National Grid Company plc. owns and operates the electricity transmission network in England and Wales, the day to day running of the network being carried out by teams of engineers within the national control room. The task of monitoring and operating the transmission network involves the transfer of large amounts of data and a high degree of cooperation between these engineers. The purpose of the research detailed in this paper is to investigate the use of interfacing techniques within the control room scenario, in particular, the development of an agent based architecture for the support of cooperative tasks. The proposed architecture revolves around the use of interface and user supervisor agents. Primarily, these agents are responsible for the flow of information to and from individual users and user groups. The agents are also responsible for tackling the synchronisation and control issues arising during the completion of cooperative tasks. In this paper a novel approach to human computer interaction (HCI) for power systems incorporating an embedded agent infrastructure is presented. The agent architectures used to form the base of the cooperative task support system are discussed, as is the nature of the support system and tasks it is intended to support.