920 resultados para Upper, George.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to investigate the influence of exercise order on one-repetition maximum (1-RM) and ten-repetition maximum (10-RM) strength gains after 6 weeks of resistance training (RT) in trained men. Sixteen men were randomly assigned into two groups based on the order of exercises performed during training sessions: a group that performed large muscle group exercises first and progressed to small muscle group exercises (LG-SM); while a second group performed the opposite sequence and started with small muscle group exercises and progressed to large muscle group exercises (SM-LG). Four sessions of RT were conducted per week; all exercises were performed for three sets of 8-12 repetitions with 1-min rest intervals between sets. Maximal and submaximal strength were assessed at baseline and after 6 weeks of RT with 1-RM and 10-RM testing for the bench press (BP), lat pulldown (LPD), triceps pulley extension (TE) and biceps curl (BC), respectively. Two-way ANOVA for the 1-RM and 10-RM tests indicated a significant group x time interaction. The 1-RM values significantly increased for all exercises in both groups (P<0.05), but were not significantly different between groups. However, effect size (ES) data indicated that the LG-SM group exhibited a greater magnitude of gains (1-RM and 10-RM) for the BP and LPD exercises. Conversely, ES indicated that the SM-LG group exhibited a greater magnitude of gains (1-RM and 10-RM) for the TE and BC exercises. In conclusion, the results suggest that upper body movements should be prioritized and performed according to individual needs to maximize maximal and submaximal strength. © 2013 Scandinavian Society of Clinical Physiology and Nuclear Medicine.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A search is performed for heavy resonances decaying to two long-lived massive neutral particles, each decaying to leptons. The experimental signature is a distinctive topology consisting of a pair of oppositely charged leptons originating at a separated secondary vertex. Events were collected by the CMS detector at the LHC during pp collisions at √s = 7 TeV, and selected from data samples corresponding to 4.1 (5.1) fb-1 of integrated luminosity in the electron (muon) channel. No significant excess is observed above standard model expectations, and an upper limit is set with 95% confidence level on the production cross section times the branching fraction to leptons, as a function of the long-lived massive neutral particle lifetime. Copyright CERN.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Results are presented from a search for the rare decays Bs0→μ+μ- and B0→μ+μ - in pp collisions at √s=7 and 8 TeV, with data samples corresponding to integrated luminosities of 5 and 20 fb-1, respectively, collected by the CMS experiment at the LHC. An unbinned maximum-likelihood fit to the dimuon invariant mass distribution gives a branching fraction B(Bs0→μ+μ-)=(3.0-0.9+1.0) ×10-9, where the uncertainty includes both statistical and systematic contributions. An excess of Bs0→μ+μ- events with respect to background is observed with a significance of 4.3 standard deviations. For the decay B0→μ+μ- an upper limit of B(B0→μ+μ-)<1.1×10 -9 at the 95% confidence level is determined. Both results are in agreement with the expectations from the standard model. © 2013 CERN. Published by the American Physical Society under the terms of the.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In fluvial systems, the relationship between a dominant variable (e.g. flood pulse) and its dependent ones (e.g. riparian vegetation) is called connectivity. This paper analyzes the connectivity elements and processes controlling riparian vegetation for a reach of the upper Paraná River (Brazil) and estimates the future changes in channel-vegetation relationship as a consequence of the managing of a large dam. The studied reach is situated 30km downstream from the Porto Primavera Dam (construction finished in 1999). Through aerial photography (1:25,000, 1996), RGB-CBERS satellite imagery and a previous field botany survey it was possible to elaborate a map with the five major morpho-vegetation units: 1) Tree-dominated natural levee, 2) Shrubby upper floodplain, 3) Shrub-herbaceous mid floodplain, 4) Grass-herbaceous lower floodplain and 5) Shrub-herbaceous flood runoff channel units. By use of a detailed topographic survey and statistical tools each morpho-vegetation type was analyzed according to its connectivity parameters (frequency, recurrence, permanence, seasonality, potamophase, limnophase and FCQ index) in the pre- and post-dam closure periods of the historical series. Data showed that most of the morpho-vegetation units were predicted to present changes in connectivity parameters values after dam closing and the new regime could affect, in different intensity, the river ecology and particularly the riparian vegetation. The methods used in this study can be useful for dam impact studies in other South American tropical rivers. © 2012 Elsevier Ltd.