961 resultados para Training project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how knowledge governance mechanisms can move the organization towards desired knowledge-based goals. A multiple-case study comprising 23 cases advances our understanding of the elements that trigger, enable, hamper, and drive shifting, leveraging and adapting. Finally, the paper offers a tentative framework of dynamic capability building promoting project competence development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper conceptualizes knowledge governance (KG) in project-based organizations (PBOs) and its methodological approaches for empirical investigation. Three key contributions towards a multi-faceted view of KG and an understanding of KG in PBOs are advanced. These contributions include a definition of KG in PBOs, a conceptual framework to investigate KG and a methodological framework for empirical inquiry into KG in PBO settings. Our definition highlights the contingent nature of KG processes in relation to their organizational context. The conceptual framework addresses macro- and micro-level elements of KG and their interaction. The methodological framework proposes five different research approaches, structured by differentiation and integration of various ontological and epistemological stances. Together these contributions provide a novel platform for understanding KG in PBOs and developing new insights into the design and execution of research on KG within PBOs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background The prevalence of type 2 diabetes is rising internationally. Patients with diabetes have a higher risk of cardiovascular events accounting for substantial premature morbidity and mortality, and health care expenditure. Given healthcare workforce limitations, there is a need to improve interventions that promote positive self-management behaviours that enable patients to manage their chronic conditions effectively, across different cultural contexts. Previous studies have evaluated the feasibility of including telephone and Short Message Service (SMS) follow up in chronic disease self-management programs, but only for single diseases or in one specific population. Therefore, the aim of this study is to evaluate the feasibility and short-term efficacy of incorporating telephone and text messaging to support the care of patients with diabetes and cardiac disease, in Australia and in Taiwan. Methods/design A randomised controlled trial design will be used to evaluate a self-management program for people with diabetes and cardiac disease that incorporates the use of simple remote-access communication technologies. A sample size of 180 participants from Australia and Taiwan will be recruited and randomised in a one-to-one ratio to receive either the intervention in addition to usual care (intervention) or usual care alone (control). The intervention will consist of in-hospital education as well as follow up utilising personal telephone calls and SMS reminders. Primary short term outcomes of interest include self-care behaviours and self-efficacy assessed at baseline and four weeks. Discussion If the results of this investigation substantiate the feasibility and efficacy of the telephone and SMS intervention for promoting self management among patients with diabetes and cardiac disease in Australia and Taiwan, it will support the external validity of the intervention. It is anticipated that empirical data from this investigation will provide valuable information to inform future international collaborations, while providing a platform for further enhancements of the program, which has potential to benefit patients internationally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project investigates the characteristics of Echo Theatre, its potential to foster performative and narrative competencies in students, and the role of the teacher in this performative and educational practice. Echo Theatre is a method devised during my storytelling practice and this research confirms that there is no identical research or teaching practice which involves students staging personal narratives in the classroom in this way. The study has been informed by crossdisciplinary theory studies from the fields of phenomenology, cognitive sciences, and theatre practice. To analyse and discuss Echo Theatre's potential contribution to the development of the child I have defined the concept of a performative competence as well as redefined the concept of a narrative competence. The situated, embodied and performative character of human cognition is emphasised as physical actions and thinking in movement is related to both gestural and conceptual understandings. Studies in philosophy and psychology confirm that narrative structure, related to identity construction and meaning-­‐making, can be attained through the performing body. We tell stories to know who we are. Telling stories then in the Echo Theatre model develops multiple competencies related to the performative aspects of theatre practice as well as the narrative aspects of storytelling. The practice-­‐led aspect of this research project includes two fieldwork projects involving a primary school class who created sixteen different Echo Theatre stories. Student participation reveals that Echo Theatre is most constructive when it moves through five phases; recalled experience, narrative, drama, performance, and evaluation. Ongoing reflection is a part of all five phases. The study also confirms that while there is potential for Echo Theatre to support the development of performative and narrative competencies in students, the effectiveness of this directly relates to the teacher's theatre knowledge and skills and his or her didactic attitude towards the students. This study confirms that the potential for learning through the moving and performing body of Echo Theatre is strengthened by working with personal narratives in the classroom and led by teachers displaying heightened skills and knowledge of the aesthetics and dynamics of theatrical form.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we develop and test a model of the relationships between mega-project leaders’ personal attributes and their ratings of project success in the context of the Australian defense industry. In our model, emotional intelligence, cognitive flexibility, and systemic thinking were hypothesized to be related to project success ratings, mediated by internal and external stakeholder relationships. We tested the model in an online survey study of 373 mega-project leaders. Results were that emotional intelligence and cognitive flexibility were found to be related to the quality of mega-project leader’s relationships with both internal and external stakeholders; and that these relationships in turn were found to be associated with the project leaders’ ratings of project success. We found however that systemic thinking had no relationship with either stakeholder relationships or ratings of project success. We conclude with a discussion of the implications of these findings and make recommendations for future research. In particular, additional research is needed to examine the contribution of a wider range of competencies on stakeholder relationships and project success in mega-projects, and that there is also a need for research in future to attempt to use more objective ratings of project success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: Hyperactive platelets contribute to the thrombotic response in humans, and exercise transiently increases platelet function. Caffeine is routinely used by athletes as an ergogenic aid, but the combined effect of exercise and caffeine on platelet function has not been investigated. Methods: Twelve healthy males were randomly assigned to one of four groups and undertook four experimental trials of a high-intensity aerobic interval training (AIT) bout or rest with ingestion of caffeine (3 mg·kg-1) or placebo. AIT was 8 × 5 min at approximately 75% peak power output (approximately 80% V?O2peak) and 1-min recovery (approximately 40% peak power output, approximately 50% V?O2peak) intervals. Blood/urine was collected before, 60, and 90 min after capsule ingestion and analyzed for platelet aggregation/activation. Results: AIT increased platelet reactivity to adenosine diphosphate (placebo 30.3%, caffeine 13.4%, P < 0.05) and collagen (placebo 10.8%, caffeine 5.1%, P < 0.05) compared with rest. Exercise placebo increased adenosine diphosphate-induced aggregation 90 min postingestion compared with baseline (40.5%, P < 0.05), but the increase when exercise was combined with caffeine was small (6.6%). During the resting caffeine protocol, collagen-induced aggregation was reduced (-4.3%, P < 0.05). AIT increased expression of platelet activation marker PAC-1 with exercise placebo (P < 0.05) but not when combined with caffeine. Conclusion: A single bout of AIT increases platelet function, but caffeine ingestion (3 mg·kg) does not exacerbate platelet function at rest or in response to AIT. Our results provide new information showing caffeine at a dose that can elicit ergogenic effects on performance has no detrimental effect on platelet function and may have the potential to attenuate increases in platelet activation and aggregation when undertaking strenuous exercise.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Skeletal muscle is a malleable tissue capable of altering the type and amount of protein in response to disruptions to cellular homeostasis. The process of exercise-induced adaptation in skeletal muscle involves a multitude of signalling mechanisms initiating replication of specific DNA genetic sequences, enabling subsequent translation of the genetic message and ultimately generating a series of amino acids that form new proteins. The functional consequences of these adaptations are determined by training volume, intensity and frequency, and the half-life of the protein. Moreover, many features of the training adaptation are specific to the type of stimulus, such as the mode of exercise. Prolonged endurance training elicits a variety of metabolic and morphological changes, including mitochondrial biogenesis, fast-to-slow fibre-type transformation and substrate metabolism. In contrast, heavy resistance exercise stimulates synthesis of contractile proteins responsible for muscle hypertrophy and increases in maximal contractile force output. Concomitant with the vastly different functional outcomes induced by these diverse exercise modes, the genetic and molecular mechanisms of adaptation are distinct. With recent advances in technology, it is now possible to study the effects of various training interventions on a variety of signalling proteins and early-response genes in skeletal muscle. Although it cannot presently be claimed that such scientific endeavours have influenced the training practices of elite athletes, these new and exciting technologies have provided insight into how current training techniques result in specific muscular adaptations, and may ultimately provide clues for future and novel training methodologies. Greater knowledge of the mechanisms and interaction of exercise-induced adaptive pathways in skeletal muscle is important for our understanding of the aetiology of disease, maintenance of metabolic and functional capacity with aging, and training for athletic performance. This article highlights the effects of exercise on molecular and genetic mechanisms of training adaptation in skeletal muscle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this commentary the authors discuss the molecular basis of the training adaptation and review the role of several key signaling proteins important in the adaptation to endurance and resistance training.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose The objectives of this study were to examine the effect of 4-week moderate- and high-intensity interval training (MIIT and HIIT) on fat oxidation and the responses of blood lactate (BLa) and rating of perceived exertion (RPE). Methods Ten overweight/obese men (age = 29 ±3.7 years, BMI = 30.7 ±3.4 kg/m2) participated in a cross-over study of 4-week MIIT and HIIT training. The MIIT training sessions consisted of 5-min cycling stages at mechanical workloads 20% above and 20% below 45%VO2peak. The HIIT sessions consisted of intervals of 30-s work at 90%VO2peak and 30-s rest. Pre- and post-training assessments included VO2max using a graded exercise test (GXT) and fat oxidation using a 45-min constant-load test at 45%VO2max. BLa and RPE were also measured during the constant-load exercise test. Results There were no significant changes in body composition with either intervention. There were significant increases in fat oxidation after MIIT and HIIT (p ≤ 0.01), with no effect of intensity. BLa during the constant-load exercise test significantly decreased after MIIT and HIIT (p ≤ 0.01), and the difference between MIIT and HIIT was not significant (p = 0.09). RPE significantly decreased after HIIT greater than MIIT (p ≤ 0.05). Conclusion Interval training can increase fat oxidation with no effect of exercise intensity, but BLa and RPE decreased after HIIT to greater extent than MIIT.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Defence projects are typically undertaken within a multi-project-management environment where a common agenda of project managers is to achieve higher project efficiency. This study adopted a multi-facet qualitative approach to investigate factors contributing to or impeding project efficiency in the Defence sector. Semi-structured interviews were undertaken to identify additional factors to those compiled from the literature survey. This was followed by a three-round Delphi study to examine the perceived critical factors of project efficiency. The results showed that project efficiency in the Defence sector went beyond its traditional internally focused scope to one that is externally focused. As a result, efforts are needed on not only those factors related to individual projects but also those factors related to project inter-dependencies and external customers. The management of these factors will help to enhance the efficiency of a project within the Defence sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.