931 resultados para Suspended solids removal
Resumo:
A mathematical model of the transport of sedimented solids within a decanter centrifuge has been developed. The primary purpose of the model is to calculate the power, torque and axial force required for the scroll to transport the solids along the bowl. The model is presented in a non-dimensional form and the procedure for implementing the model is included. The model is compared to test data from an existing publication; there was good agreement between the model and data. Example results are presented in the form of graphs to illustrate the influence of key parameters. © 2013 Elsevier Ltd.
Resumo:
From June 2004 to December 2004, Lake Dianchi, which had large scale of cyanobacterial blooms was investigated in order to study P-fractionation in the suspended matter and the sediment. The investigation improves our understanding of phosphorus in Lake Dianchi and the relationship between phosphorus and cyanobacterial blooms. It contributes to the available literature on the behavior of P in hypertrophic lakes. The distribution of P-fractions in Lake Dianchi was not uniform from northwest to south, but was closely related to the trophic status of the whole lake. The concentrations of total phosphorus, labile P (NH4Cl-P), Organic P (NaOH-NRP) and loss on ignition in suspended matter were positively correlated with the strength of cyanobacterial blooms. Total phosphorus in suspended matter was relatively stable for almost half an year and closely related to Chl. a concentration. The main content of organic phosphorus is in the cyanobacterial blooms. The concentrations of phosphorus bound to metal oxides and carbonates (NaOH-SRP and HCl-P) in sediment were similar to NaOH-SRP and HCl-P in the corresponding suspended matter. The latter two forms of P in suspended matter were not affected by cyanobacterial blooms, indicating that the inorganic phosphorus is derived from the sediment after resuspension from the sediment due to wind and wave action. The contribution of the different P-fractions to TP in sediment and in suspended matter indicates that NH4Cl-P in the suspended matter is an important buffer for maintaining dissolved phosphorus in water.
Resumo:
Nutrient-rich effluents caused rising concern due to eutrophication of aquatic environment by utilization of a large amount of formula feed. Nutrient removal and water quality were investigated by planting aquatic vegetable on artificial beds in 36-m(2) concrete fishponds. After treatment of 120 days, 30.6% of total nitrogen (TN) and 18.2% of total phosphorus (TP) were removed from the total input nutrients by 6-m(2) aquatic vegetable Ipomoea aquatica. The concentrations of TN, TP, chemical oxygen demand (COD) and chlorophyll a in planted ponds were significantly lower than those in non-planted ponds (P<0.05). Transparency of water in planted ponds was much higher than that of control ponds. No significant differences in the concentration of total ammonia nitrogen (TAN), nitrate nitrogen (NO3-N) and nitrite nitrogen (NO2--N) were found between planted and non-planted ponds. These results suggested that planting aquatic vegetable with one-sixth covered area of the fishponds could efficiently remove nutrient and improve water quality.
Resumo:
Using artificial systems to simulate natural lake environments with cyanobacterial blooms, we investigated plankton community succession by polymerase chain reaction-denaturing gradient gel electrophoresis (PCR-DGGE) fingerprinting and morphological method. With this approach, we explored potential ecological effects of a newly developed cyanobacterial blooms removal method using chitosan-modified soils. Results of PCR-DGGE and morphological identification showed that plankton communities in the four test systems were nearly identical at the beginning of the experiment. After applying the newly developed and standard removal methods, there was a shift in community composition, but neither chemical conditions nor plankton succession were significantly affected by the cyanobacteria removal process. The planted Vallisneria natans successfully recovered after cyanobacteria removal, whereas that in the box without removal process did not. Additionally, canonical correspondence analysis indicated that other than for zooplankton abundance, total phosphorus was the most important environmental predictor of planktonic composition. The present study and others suggest that dealing with cyanobacteria removal using chitosan-modified soils can play an important role in controlling cyanobacterial blooms in eutrophicated freshwater systems.
Resumo:
Phthalic acid esters (PAEs) have become widely diffused in the environment via the manufacturing process. Numerous experiments have shown that the bioaccumulation of PAEs occurred in the aquatic and terrestrial food chain; meanwhile, it was found that some of PAEs were considered as potential carcinogens, teratogens and mutagens. In this research, two vertical/reverse-vertical flow constructed wetland systems were set up to study its removal efficiency of dibutyl, phthalate (DBP) pollution. The results showed that the constructed wetland system could remove DBP effectively, and the removal rates reached nearly 100%. Substrate microorganism and enzymatic activities probably played key roles during DBP removal, and the removal of DBP probably mainly took place in the upper layer of chamber A in the constructed wetland systems. (C) 2007 Elsevier GmbH. All rights reserved.
Resumo:
A comparative study was conducted to reveal the differentiate effects of eight different filter media including gravel, zeolites, anthracite, shale, vermiculite, ceramic filter media, blast furnace steel slag and round ceramsite. The study mainly related to the eight different filter media's removal performances of organic matter, nitrogen and phosphorus in the vertical flow constructed wetland simulated system, which treating wastewater at hydraulic loading rate of 1000-2500 mm/d. The results indicated that the removal effects were closely related to the physical and chemical properties of medium materials. Anthracite-filled system had the highest removal rate for the total organic carbon (TOC), up to 70%, and the removal rates of other systems ranged from 20% to 30%. As for the five-day biochemical oxygen demand (BOD5), anthracite-filled and steel slag-filled systems had the highest removal rates, also up to 70%, as well as other systems all exceeded 50%. At the same time, for the total nitrogen (TN) and NH4(+)-N, the zeolites-filled and ceramic-filled systems had the best performances with the removal rates of more than 70%, the other way round, the removal rates of other systems were only about 20%. The distinguishable effects were also observed in removal performances of total phosphorus (TP) and total dissoluble phosphorus (TDP). The removal rates of TP and TDP in steel slag-filled systems were more than 90%, a much higher value, followed by that of the anthracite-filled system, more than 60%, but those of other systems being the less. Our study provided a potential mechanism to optimize the filter media design for the vertical flow constructed wetlands.
Resumo:
In this paper, the adsorption equilibrium and kinetic behaviors of pentachlorophenol (PCP) on suspended particulate matter (SPM) in Donghu Lake water were investigated. The Langmuir and Freundlich adsorption models were applied to describe the equilibrium isotherms and their constants were evaluated. The results indicated that the adsorption of PCP on Donghu Lake SPM followed the Freundlich isotherm. Furthermore, the first order Lagergren rate equation and the pseudo-second order rate equation were used to describe the kinetic behaviors of PCP adsorption on Donghu Lake SPM, the rate constants were determined, and the kinetic process of the adsorption of PCP on Donghu Lake SPM followed the second order kinetic model.
Resumo:
Phosphorus removal performance and a possible mechanism for the phosphorus removal from an eutrophic lake water were investigated using a medium-scale integrated vertical constructed wetland (combined vertical and reverse-vertical systems) from April, 11, 2001 to September, 28, 2004. Environmental factors affecting phosphorus removal and release profiles were monitored simultaneously under hydraulic loads from 400 to 2000 mm per day. The phosphorus removal rate varied with the environmental conditions. The removal rate for acidic influent water was superior to that for alkaline influent water. The substrate in the wetland chamber acted as a buffer to regulate the pH value of the water sample. As regards the water temperature, no significant differences were observed for the removal rate of total phosphorus (TP) and soluble reactive phosphorus (SRP) between low (lower than 15 degrees C) medium (16-25 degrees C) and high temperature (higher than 26 degrees C) conditions. Under a hydraulic load of 400 mm per day, the removal rate reached over 70%, the highest value achieved in this work. In addition, the highest hydraulic load of 2000 mm/d did not result in the lowest removal rate, as had been expected. After a two-year high hydraulic load test, the removal rate decreased significantly. Phosphorous release from the substrate was examined using a spatial sampling method. Depth profiles of total phosphorus and different states of phosphorus present in the substrate were recorded. This further study demonstrated that binding of phosphorus by iron and calcium might be another major factor in the removal and release of TP and SRP in this wetland system. The distribution of the speciated phosphorus showed that the amount of phosphorus captured in the substrate of the down-flow chamber was significantly higher than that captured in the up-flow chamber, suggesting that the up-flow chamber was the main source of phosphorus release in this constructed wetland.
Resumo:
In this study, optimization of operational conditions of a submerged membrane bioreactor treating municipal waste-water was studied. Mixed liquid suspended solid (MLSS), membrane flux (J(v)), aeration (Q), ratio of pumping, time to break time (t(p)/t(b)), and ratio of up flow area to down flow area (A Ad) were chosen as the easily manipulable parameters to study their effects on removal efficiency and membrane fouling. Totally, 16 different runs were designed to compare and select the best combination of the 5 parameters. The results showed that the optimal operational conditions were MLSS = 7g(.)L(-1), J(v) = 10L(.)m(-2.)h(-1), Q = 6 m(3.)h(-1), t(p)/t(b)= 4 min/1 min, and A(r)/A(d) = 1.7 m(2)/m(2). Under such conditions, the SMBR could achieve a double win of high removal efficiency and low membrane fouling.
Resumo:
Pollution resulting from increased human activities is threatening Lake Donghu, its effects being characterized by serious eutrophication. A steady increase of phosphorus loading is the most important factor of the lake eutrophication. Pollution external control projects are being implemented and will be accomplished before the year 2010. In order to predict the restoration rate by the lake's self-purification after the projects of external control, a model of predicting the removal rate of total phosphorus (TP) from lake water is developed, and a brief method of estimating the release and export rate of sediment phosphorus is suggested. Results show that, on the premise of external loading fully controlled. The restoration needs about 55 years or more. Obviously, the great P pool in the sediment will be a limiting factor of preventing the improvement of water quality after the external loading is under control. Based on the estimation we conclude that after the external control projects before 2010, in order to restore the lake in a few years, although highly cost, the first step must be the sediment dredging to remove internal loading. The second step is diverting water of River Changjiang into the lake to accelerate the improvement of lake water. Otherwise, removal of pollutant sources will become meaningless. (c) 2006 Elsevier B.V. All rights reserved.
Resumo:
Two sets of small scale systems of staged, vertical-flow constructed wetlands (VFCW) were operated in a greenhouse to study the purification of dibutyl phthalate (DBP) in admeasured water. Each system consisted of two chambers in which water flowed downward in chamber I and then upward in chamber 2. The systems were intermittently fed with wastewater under a hydraulic load of 420 mm(.)d(-1). The measured influent concentrations of DBP in the experimental system were 9.84 mg(.)l(-1), while the other system was used as a control and received no DBP. Effluent concentrations of the treated system averaged 5.82 mug(.)l(-1) and were far below the Chinese DBP discharge standard of less than or equal to0.2 mg(.)l(-1). These results indicate the potential purification capacity of this new kind of constructed wetland in removing DBP from a polluted water body.
Resumo:
Removal efficiencies on xenobiotics from polluted water in a twin-shaped constructed wetland consisting of a vertical flow chamber with the crop plant Colocasia esculenta L. Schott and a reverse vertical flow one with Ischaemum aristatum var. glaucum Honda, were assessed by chemical analysis and bioassays. After a four-month period of application, removal efficiencies of the applied pesticides parathion and omethoate were 100%, with no detectable parathion and omethoate in the effluent. For the applied herbicides, the decontamination was less efficient with removal efficiencies of 36% and 0% for 4-chloro-2-methyl-phenoxyacetic acid and dicamba, respectively. As shown by toxicity assay with duckweed Lemna minor L., growth retardation may occur if the water treated for herbicide removal is used in irrigation of sensitive cultivars in agriculture or horticulture. In contrast to I. aristatum var. glaucum Honda, the crop C esculenta L. Schott has a high yield in biomass production as a valuable source of renewable energy. (C) 2002 Elsevier Science Ltd. All rights reserved.
Resumo:
A new method to fabricate nanoscale metallic air-bridges has been investigated. The pillar patterns of the air-bridge were defined on a SiO2, sacrificial layer by electron-beam lithography combined with inductively coupled plasma etching. Thereafter, the span (suspended part between the pillars) patterns were defined with a second electron-beam exposure on a PMMA/PMMA-MAA resist system. The fabrication process was completed by subsequent metal electron-beam evaporation, lift-off in acetone, and removal of the sacrificial layer in a buffered hydrofluoric (HF) solution. Air-bridges with two different geometries (line-shaped and cross-shaped) were studied in detail. The narrowest width of the air-bridges was around 200 nm, and the typical length of the air-bridges was 2-5 mu m. The advantages of our method are the simplicity of carrying out electron-beam exposure with good reproducibility and the capability of more accurate control of the pillar sizes and shapes of the air-bridge. (C) 2007 Elsevier Ltd. All rights reserved.