974 resultados para NORTH KARELIA PROJECT


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to take a critical look at the question “what is a competent project manager?” and bring some fresh added-value insights. This leads us to analyze the definitions, and assessment approaches of project manager competence. Three major standards as prescribed by PMI, IPMA, and GAPPS are considered for review from an attribute-based and performance-based approach and from a deontological and consequentialist ethics perspectives. Two fundamental tensions are identified: an ethical tension between the standards and the related competence assessment frameworks and a tension between attribute and performance-based approaches. Aristotelian ethical and practical philosophy is brought in to reconcile these differences. Considering ethics of character that rises beyond the normative deontological and consequentialist perspectives is suggested. Taking the mediating role of praxis and phrónêsis between theory and practice into consideration is advocated to resolve the tension between performance and attribute-based approaches to competence assessment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainability is a global issue that urgently needs addressing, and for which the most serious consequences are for children and future generations. This insightful research text tackles one of the most significant contemporary issues of our times – the nexus between society and environment – and how early childhood education can contribute to sustainable living. By offering international and multidisciplinary research perspectives on Early Childhood Education for Sustainability, each chapter explores and investigates the complex topic of sustainability and its relationship to early childhood education. A particular emphasis that runs through this text is young children as empowered citizens, capable of both contributing to and creating change for sustainability. The chapter authors work from, or are aligned with, a transformative education paradigm that suggests the socio-constructivist frameworks currently underpinning Early Childhood Education require reframing in light of the social transformations necessary to address humanity’s unsustainable, unjust and unhealthy living patterns. This research text is designed to be provocative and challenging; in so doing it seeks to encourage exploration of current understandings about Early Childhood Education for Sustainability, offers new dimensions for more deeply informed practice, and proposes avenues for further research in this field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Baseline findings from the Healthy Home Child Care Project include data from Family Child Care Providers (FCCPs) in Oregon (n=53) who completed assessments of nutrition and physical activity policies and practices and BMI data for children in the care of FCCPs (n=205). Results show that a significant percentage of FCCPs failed to meet child care standards in several areas and that 26.8% of children under the care of FCCPs were overweight or obese. These data supported the development of an Extension-delivered intervention specific to FCCPs in Oregon and highlight areas of concern that should be addressed through targeted trainings of FCCPs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

"The aims of the project have been to conduct research that will inform a description of the core role of the nurse, core competency standards for the nurse and standards for education and program accreditation for nurse preparation leading to regsitration and authorisation. Includes Nurse Practitioner Standards Project: Toolkit, developed from the findings of the Nurse Practitioner standards research project. It presents standards related to Nurse Practitioner practice, education and authorisation/evaluation."--Libraries Australia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An investigation of the construction data management needs of the Florida Department of Transportation (FDOT) with regard to XML standards including development of data dictionary and data mapping. The review of existing XML schemas indicated the need for development of specific XML schemas. XML schemas were developed for all FDOT construction data management processes. Additionally, data entry, approval and data retrieval applications were developed for payroll compliance reporting and pile quantity payment development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sediments cored along the southwestern Iberian margin during Integrated Ocean Drilling Program Expedition 339 provide constraints on Mediterranean Outflow Water (MOW) circulation patterns from the Pliocene epoch to the present day. After the Strait of Gibraltar opened (5.33 million years ago), a limited volume of MOW entered the Atlantic. Depositional hiatuses indicate erosion by bottom currents related to higher volumes of MOW circulating into the North Atlantic, beginning in the late Pliocene. The hiatuses coincide with regional tectonic events and changes in global thermohaline circulation (THC). This suggests that MOW influenced Atlantic Meridional Overturning Circulation (AMOC), THC, and climatic shifts by contributing a component of warm, saline water to northern latitudes while in turn being influenced by plate tectonics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose My aim is to introduce, in the project management field, an Aristotelian ethics lens moving beyond the classical deontological and consequentialism approaches underlying the current ethical practices and codes of ethics and professional conducts. In doing so, I wish to pose the premises of a debate on the implications of a conscious ethical perspective for the structure and agency relationship within the project management field Design/methodology/approach Project management is a knowledge field on its own right. However the current perspectives applied to make sense and develop the field (modernism vs. postmodernism) leads to dichotomous thinking rather than recognizing the merits and contextual validity of both sides. I call for Aristotelian Ethics as a way of moving beyond this dichotomous thinking. I introduce briefly Aristotelian Ethics and its consequences in term of relation theory – practice, means and ends, facts and values, and finally politics (i.e. being part of a community of practitioners). Then I illustrate some consequences for the field taking PMI Code of Ethics and Professional Conduct and APM Code of Professional Conduct as supports for discussion Findings I suggest a need for revisiting and/or redesigning the codes of ethics and professional conducts for project management according to an Aristotelian perspective, in order to move beyond the normative limitations of classical deontological (conflict between competing duties, exemplified by PMI Code) or consequentialism (focusing on the "right" outcome to the detriment of duties, exemplified by APM Code) approaches (both, in fact, leading to a disconnection means and ends, and facts and values). This implicates shifting our view from the question "what is my duty?" to the questions "why should I undertake my duty?" and "how ought I act in this situation?" Practical implications Raising Professional Bodies, Industry and Education institutions awareness and consciousness and leading them to rethink about codes of ethics and the implications for the way they conceive practice and research, bodies of knowledge, credentialing, education... Originality/value To the best of my knowledge, this kind of discussion has not yet been conducted within the project management field, and considering the implication of project management in our life and for the well being of the society, an ethical debate may present some value(s)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on the 2nd ShARe/CLEFeHealth evaluation lab which continues our evaluation resource building activities for the medical domain. In this lab we focus on patients' information needs as opposed to the more common campaign focus of the specialised information needs of physicians and other healthcare workers. The usage scenario of the lab is to ease patients and next-of-kins' ease in understanding eHealth information, in particular clinical reports. The 1st ShARe/CLEFeHealth evaluation lab was held in 2013. This lab consisted of three tasks. Task 1 focused on named entity recognition and normalization of disorders; Task 2 on normalization of acronyms/abbreviations; and Task 3 on information retrieval to address questions patients may have when reading clinical reports. This year's lab introduces a new challenge in Task 1 on visual-interactive search and exploration of eHealth data. Its aim is to help patients (or their next-of-kin) in readability issues related to their hospital discharge documents and related information search on the Internet. Task 2 then continues the information extraction work of the 2013 lab, specifically focusing on disorder attribute identification and normalization from clinical text. Finally, this year's Task 3 further extends the 2013 information retrieval task, by cleaning the 2013 document collection and introducing a new query generation method and multilingual queries. De-identified clinical reports used by the three tasks were from US intensive care and originated from the MIMIC II database. Other text documents for Tasks 1 and 3 were from the Internet and originated from the Khresmoi project. Task 2 annotations originated from the ShARe annotations. For Tasks 1 and 3, new annotations, queries, and relevance assessments were created. 50, 79, and 91 people registered their interest in Tasks 1, 2, and 3, respectively. 24 unique teams participated with 1, 10, and 14 teams in Tasks 1, 2 and 3, respectively. The teams were from Africa, Asia, Canada, Europe, and North America. The Task 1 submission, reviewed by 5 expert peers, related to the task evaluation category of Effective use of interaction and targeted the needs of both expert and novice users. The best system had an Accuracy of 0.868 in Task 2a, an F1-score of 0.576 in Task 2b, and Precision at 10 (P@10) of 0.756 in Task 3. The results demonstrate the substantial community interest and capabilities of these systems in making clinical reports easier to understand for patients. The organisers have made data and tools available for future research and development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research is focused on realizing productivity benefits for the delivery of transport infrastructure in the Australian construction industry through the use of building information modeling (BIM), virtual design and construction (VDC) and integrated project delivery (IPD). Specific objectives include: (I) building an understanding of the institutional environment, business systems and support mechanisms (e.g., training and skilling) which impact on the uptake of BIM/VDC; (II) gathering data to undertake a cross-country analysis of these environments; and (III) providing strategic and practical outcomes to guide the uptake of such processes in Australia. Activities which will inform this research include a review of academic literature and industry documentation, semi-formal interviews in Australia and Sweden, and a cross-country comparative analysis to determine factors affecting uptake and associated productivity improvements. These activities will seek to highlight the gaps between current-practice and best-practice which are impacting on widespread adoption of BIM/VDC and IPD. Early findings will be discussed with intended outcomes of this research being used to: inform a national public procurement strategy; provide guidelines for new contractual frameworks; and contribute to closing skill gaps. Keywords: building information modeling (BIM); virtual design and construction (VDC); integrated project delivery (IPD); transport infrastructure; Australia; procurement