919 resultados para Hydropower scheduling
Resumo:
IPTV is now offered by several operators in Europe, US and Asia using broadcast video over private IP networks that are isolated from Internet. IPTV services rely ontransmission of live (real-time) video and/or stored video. Video on Demand (VoD)and Time-shifted TV are implemented by IP unicast and Broadcast TV (BTV) and Near video on demand are implemented by IP multicast. IPTV services require QoS guarantees and can tolerate no more than 10-6 packet loss probability, 200 ms delay, and 50 ms jitter. Low delay is essential for satisfactory trick mode performance(pause, resume,fast forward) for VoD, and fast channel change time for BTV. Internet Traffic Engineering (TE) is defined in RFC 3272 and involves both capacity management and traffic management. Capacity management includes capacityplanning, routing control, and resource management. Traffic management includes (1)nodal traffic control functions such as traffic conditioning, queue management, scheduling, and (2) other functions that regulate traffic flow through the network orthat arbitrate access to network resources. An IPTV network architecture includes multiple networks (core network, metronetwork, access network and home network) that connects devices (super head-end, video hub office, video serving office, home gateway, set-top box). Each IP router in the core and metro networks implements some queueing and packet scheduling mechanism at the output link controller. Popular schedulers in IP networks include Priority Queueing (PQ), Class-Based Weighted Fair Queueing (CBWFQ), and Low Latency Queueing (LLQ) which combines PQ and CBWFQ.The thesis analyzes several Packet Scheduling algorithms that can optimize the tradeoff between system capacity and end user performance for the traffic classes. Before in the simulator FIFO,PQ,GPS queueing methods were implemented inside. This thesis aims to implement the LLQ scheduler inside the simulator and to evaluate the performance of these packet schedulers. The simulator is provided by ErnstNordström and Simulator was built in Visual C++ 2008 environmentand tested and analyzed in MatLab 7.0 under windows VISTA.
Resumo:
Train dispatchers faces lots of challenges due to conflicts which causes delays of trains as a result of solving possible dispatching problems the network faces. The major challenge is for the train dispatchers to make the right decision and have reliable, cost effective and much more faster approaches needed to solve dispatching problems. This thesis work provides detail information on the implementation of different heuristic algorithms for train dispatchers in solving train dispatching problems. The library data files used are in xml file format and deals with both single and double tracks between main stations. The main objective of this work is to build different heuristic algorithms to solve unexpected delays faced by train dispatchers and to help in making right decisions on steps to take to have reliable and cost effective solution to the problems. These heuristics algorithms proposed were able to help dispatchers in making right decisions when solving train dispatching problems.
Resumo:
This paper addresses the feasibility of implementing Japanese manufacturing systems in the United States. The recent success of Japanese transplant companies suggests that Just-In-Time (JIT) production is possible within America's industrial environment. Once American workers receive proper training, they have little difficulty participating in rapid setup procedures and utilizing the kanban system. Japanese transplants are gradually developing Japanese-style relationships with their American supplier companies by initiating long-term, mutually beneficial agreements. They are also finding ways to cope with America's problem of distance, which is steadily decreasing as an obstacle to JIT delivery. American companies, however, encounter Significant problems in trying to convert traditionally organized, factories to the JIT system. This paper demonstrates that it is both feasible and beneficial for American manufacturers to implement JIT production techniques. Many of the difficulties manufacturers experience center around a general lack of information about JIT. Once a company realizes its potential for setup-time reduction, a prerequisite for the JIT system, workers and managers can work together to create a new process for handling equipment changeover. Significant results are possible with minimal investment. Also, supervisors often do not realize that the JIT method of ordering goods from suppliers is compatible with current systems. This "kanban system" not only enhances current systems but also reduces the amount of paperwork and scheduling involved. When arranging JlT delivery of supplier goods, American manufacturers tend to overlook important aspects of JIT supplier management. However, by making long-tenn commitments, initiating the open exchange of information, assisting suppliers in reaching new standards of performance, increasing the level of conununication, and relying more on suppliers' engineering capabilities, even American manufacturers can develop Japanese-style supplier relationships that enhance the effectiveness of the system.