943 resultados para Enterprise Resources Planning ERP


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Thesis to obtain the Master Degree in Electronics and Telecommunications Engineering

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatório de Estágio apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Auditoria, sob orientação do Senhor Dr. Paulo Jorge Seabra dos Anjos, Revisor Oficial de Contas, na sociedade António Anjos, F. Brandão & Associados, SROC, Lda. e da Exma. Senhora Professora Doutora Susana Adelina Moreira Carvalho Basto

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada ao Instituto Politécnico do Porto, Instituto Superior de Contabilidade e Administração do Porto, para obtenção do Grau de Mestre em Empreendedorismo e Internacionalização Orientador: Doutor Orlando Manuel Martins Marques de Lima Rua Coorientadora: Mestre Anabela Paula Alferes Ferreira Ribeiro

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Comunicação apresentada no 8º Congresso Nacional de Administração Pública - Desafios e Soluções, em Carcavelos de 21 a 22 de Novembro de 2011.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lunacloud is a cloud service provider with offices in Portugal, Spain, France and UK that focus on delivering reliable, elastic and low cost cloud Infrastructure as a Service (IaaS) solutions. The company currently relies on a proprietary IaaS platform - the Parallels Automation for Cloud Infrastructure (PACI) - and wishes to expand and integrate other IaaS solutions seamlessly, namely open source solutions. This is the challenge addressed in this thesis. This proposal, which was fostered by Eurocloud Portugal Association, contributes to the promotion of interoperability and standardisation in Cloud Computing. The goal is to investigate, propose and develop an interoperable open source solution with standard interfaces for the integrated management of IaaS Cloud Computing resources based on new as well as existing abstraction libraries or frameworks. The solution should provide bothWeb and application programming interfaces. The research conducted consisted of two surveys covering existing open source IaaS platforms and PACI (features and API) and open source IaaS abstraction solutions. The first study was focussed on the characteristics of most popular open source IaaS platforms, namely OpenNebula, OpenStack, CloudStack and Eucalyptus, as well as PACI and included a thorough inventory of the provided Application Programming Interfaces (API), i.e., offered operations, followed by a comparison of these platforms in order to establish their similarities and dissimilarities. The second study on existing open source interoperability solutions included the analysis of existing abstraction libraries and frameworks and their comparison. The approach proposed and adopted, which was supported on the conclusions of the carried surveys, reuses an existing open source abstraction solution – the Apache Deltacloud framework. Deltacloud relies on the development of software driver modules to interface with different IaaS platforms, officially provides and supports drivers to sixteen IaaS platform, including OpenNebula and OpenStack, and allows the development of new provider drivers. The latter functionality was used to develop a new Deltacloud driver for PACI. Furthermore, Deltacloud provides a Web dashboard and REpresentational State Transfer (REST) API interfaces. To evaluate the adopted solution, a test bed integrating OpenNebula, Open- Stack and PACI nodes was assembled and deployed. The tests conducted involved time elapsed and data payload measurements via the Deltacloud framework as well as via the pre-existing IaaS platform API. The Deltacloud framework behaved as expected, i.e., introduced additional delays, but no substantial overheads. Both the Web and the REST interfaces were tested and showed identical measurements. The developed interoperable solution for the seamless integration and provision of IaaS resources from PACI, OpenNebula and OpenStack IaaS platforms fulfils the specified requirements, i.e., provides Lunacloud with the ability to expand the range of adopted IaaS platforms and offers a Web dashboard and REST API for the integrated management. The contributions of this work include the surveys and comparisons made, the selection of the abstraction framework and, last, but not the least, the PACI driver developed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

RESUMO - A consciência de uma necessidade clara em rentabilizar a capacidade instalada e os meios tecnológicos e humanos disponíveis no Bloco Operatório e face ao imperativo de um cabal desempenho e de uma adequada efectividade nestes serviços levou-nos à realização deste estudo. Objectivos: O trabalho de projecto centrou-se em quatro objectivos concretos: Elaboração de uma grelha de observação de Modelos de Gestão de Bloco Operatório; Observação de seis Modelos de Gestão de Blocos Operatórios em experiências nacionais e in-loco, de acordo com a grelha de observação; Avaliação da qualidade gestionária na amostra seleccionada à luz dos modelos existentes; Criação de uma grelha de indicadores para a monitorização e avaliação do Bloco Operatório. Metodologia: Na elaboração da grelha de observação dos Blocos Operatórios recorremos a um grupo de peritos, à bibliografia disponível e à informação recolhida em entrevistas. Aplicámos a grelha de observação aos seis Blocos Operatórios e analisámos as informações referentes a cada modelo com a finalidade de encontrar os pontos-chave que mais se destacavam em cada um deles. Para a elaboração da grelha de indicadores de monitorização do Bloco Operatório realizámos uma reunião recorrendo à técnica de grupo nominal para encontrar o nível de consenso entre os peritos. Resultados: Criámos uma grelha de observação de Modelos de Gestão de Bloco Operatório que permite comparar as características de gestão. Esta grelha foi aplicada a seis Blocos Operatórios o que permitiu destacar como elementos principais e de diferenciação: o sistema de incentivos implementado; o sistema informático, de comunicação entre os serviços e de débito directo dos gastos; a existência de uma equipa de gestão de Bloco Operatório e de Gestão de Risco; a importância de um planeamento cirúrgico semanal e da existência de um regulamento do Bloco Operatório. Desenhámos um painel de indicadores para uma monitorização do Bloco Operatório, de onde destacamos: tempo médio de paragem por razões técnicas, tempo médio de paragem por razões operacionais, tempo médio por equipa e tempo médio por procedimento. Considerações finais: Os Blocos Operatórios devem ponderar a existência das componentes mais importantes dos Modelos, bem como recolher exaustivamente indicadores de monitorização. A investigação futura deverá debruçar-se sobre a relação entre os indicadores de monitorização e os Modelos de Gestão, recorrendo à técnicas de benchmarking. -------------------ABSTRACT - This study was driven by the need to optimise available capacity, technology and human resources in the Operating Room and to address the corresponding goals of adequate performance and effectiveness. Objectives: This project focuses on four specific objectives: development of an observation grid of operating room management models; in-loco observation and documentation of six national operating room, according to the grid; assess the quality of management in the selected sample relative to existing management models; create a set of indicators for monitoring and evaluating operating rooms. Methodology: The design of the observation grid was based on experts’ consultation, a literature survey and information gathered in various interviews. The observation grid was applied to six operating rooms and the information for each management model was analysed in order to find its key characteristics. We used the Nominal Group Technique in order to develop a set of indicators for monitoring and evaluating operating rooms. Results: An observation grid was created for operating rooms management models, which allowed comparing management characteristics. This grid was applied to six operating rooms allowing disentangle its main features and differentiating characteristics: implementation of incentive systems; IT systems including information flow between services; inventory and expense management; existence of a management team and effective risk management; importance of weekly planning and regulations. We designed a set control indicators, whose major characteristics are the following: the average down time due to technical reasons, the average down time due to operational reasons, the average time per team and the average time per procedure. Final Conclusions: Operating rooms should consider the most relevant characteristics of management models and collect exhaustive information on control indicators. Future research should be devoted to assessing the operating room performance according to management models, using control indicators and benchmarking techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper focuses on the Portuguese results from an international survey on LIS students’ information literacy skills. The results’ analysis will be grounded on a literature review on the criteria application to evaluate information and determine the credibility by undergraduate students. The guidelines for the information evaluation, especially regarding credibility aspect, on three main information literacy frameworks will be presented. After an overall presentation of the main results, the analysis of the Portuguese survey results will focus on issues related to information evaluation skills, namely on criteria to assess information credibility and on difficulties to apply them.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The intensive use of distributed generation based on renewable resources increases the complexity of power systems management, particularly the short-term scheduling. Demand response, storage units and electric and plug-in hybrid vehicles also pose new challenges to the short-term scheduling. However, these distributed energy resources can contribute significantly to turn the shortterm scheduling more efficient and effective improving the power system reliability. This paper proposes a short-term scheduling methodology based on two distinct time horizons: hour-ahead scheduling, and real-time scheduling considering the point of view of one aggregator agent. In each scheduling process, it is necessary to update the generation and consumption operation, and the storage and electric vehicles status. Besides the new operation condition, more accurate forecast values of wind generation and consumption are available, for the resulting of short-term and very short-term methods. In this paper, the aggregator has the main goal of maximizing his profits while, fulfilling the established contracts with the aggregated and external players.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing importance of the integration of distributed generation and demand response in the power systems operation and planning, namely at lower voltage levels of distribution networks and in the competitive environment of electricity markets, leads us to the concept of smart grids. In both traditional and smart grid operation, non-technical losses are a great economic concern, which can be addressed. In this context, the ELECON project addresses the use of demand response contributions to the identification of non-technical losses. The present paper proposes a methodology to be used by Virtual Power Players (VPPs), which are entities able to aggregate distributed small-size resources, aiming to define the best electricity tariffs for several, clusters of consumers. A case study based on real consumption data demonstrates the application of the proposed methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The provision of reserves in power systems is of great importance in what concerns keeping an adequate and acceptable level of security and reliability. This need for reserves and the way they are defined and dispatched gain increasing importance in the present and future context of smart grids and electricity markets due to their inherent competitive environment. This paper concerns a methodology proposed by the authors, which aims to jointly and optimally dispatch both generation and demand response resources to provide the amounts of reserve required for the system operation. Virtual Power Players are especially important for the aggregation of small size demand response and generation resources. The proposed methodology has been implemented in MASCEM, a multi agent system also developed at the authors’ research center for the simulation of electricity markets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Text based on the paper presented at the Conference "Autonomous systems: inter-relations of technical and societal issues" held at Monte de Caparica (Portugal), Universidade Nova de Lisboa, November, 5th and 6th 2009 and organized by IET-Research Centre on Enterprise and Work Innovation

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Demand response concept has been gaining increasing importance while the success of several recent implementations makes this resource benefits unquestionable. This happens in a power systems operation environment that also considers an intensive use of distributed generation. However, more adequate approaches and models are needed in order to address the small size consumers and producers aggregation, while taking into account these resources goals. The present paper focuses on the demand response programs and distributed generation resources management by a Virtual Power Player that optimally aims to minimize its operation costs taking the consumption shifting constraints into account. The impact of the consumption shifting in the distributed generation resources schedule is also considered. The methodology is applied to three scenarios based on 218 consumers and 4 types of distributed generation, in a time frame of 96 periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the smart grids context, distributed energy resources management plays an important role in the power systems’ operation. Battery electric vehicles and plug-in hybrid electric vehicles should be important resources in the future distribution networks operation. Therefore, it is important to develop adequate methodologies to schedule the electric vehicles’ charge and discharge processes, avoiding network congestions and providing ancillary services. This paper proposes the participation of plug-in hybrid electric vehicles in fuel shifting demand response programs. Two services are proposed, namely the fuel shifting and the fuel discharging. The fuel shifting program consists in replacing the electric energy by fossil fuels in plug-in hybrid electric vehicles daily trips, and the fuel discharge program consists in use of their internal combustion engine to generate electricity injecting into the network. These programs are included in an energy resources management algorithm which integrates the management of other resources. The paper presents a case study considering a 37-bus distribution network with 25 distributed generators, 1908 consumers, and 2430 plug-in vehicles. Two scenarios are tested, namely a scenario with high photovoltaic generation, and a scenario without photovoltaic generation. A sensitivity analyses is performed in order to evaluate when each energy resource is required.