984 resultados para Economic projects
Resumo:
Each year, IEDA’s contract compliance team compiles a report of the status of each business project awarded or under contract. The FY14 annual report measures status and progress of projects awarded since 2003 and tracked by the compliance team. Within this version of the report, the projects are grouped by status. Within this version of the report, the projects are first grouped by the status.
Resumo:
The Lane-Wells Road Logger was utilized primarily to determine the feasibility of employing such a device for moisture and density control in Iowa highway construction. A secondary objective was the use of the Road Logger to obtain information concerning moisture content and density during and after construction. Correlation studies with conventional test results required a small portion of the lease period. Practically all phases of construction and most materials utilized in base and surface courses were surveyed. Results of this study were good, in general, with the Road Logger indicating dry density slightly higher and the moisture content slightly lower than conventional results in most instances. Economic feasibility seemed to pose the greatest problem for the acceptance of the Road Logger as a standard compaction control device. It would appear from the findings of this study that probably only large projects, or several smaller contracts tested simultaneously, could justify the expense of the Logger. A total of about 128 miles were surveyed with the Logger during the lease period. Approximately 16 days of downtime due to minor breakdowns were recorded. Inclement weather forcing construction delays resulted in several idle days in which the Logger's full capabilities were not realized.
Resumo:
The use of Railroad Flatcars (RRFCs) as the superstructure on low-volume county bridges has been investigated in a research project conducted by the Bridge Engineering Center at Iowa State University. These bridges enable county engineers to replace old, inadequate county bridge superstructures for less than half the cost and in a shorter construction time than required for a conventional bridge. To illustrate their constructability, adequacy, and economy, two RRFC demonstration bridges were designed, constructed, and tested: one in Buchanan County and the other in Winnebago County. The Buchanan County Bridge was constructed as a single span with 56-ft-long flatcars supported at their ends by new, concrete abutments. The use of concrete in the substructure allowed for an integral abutment at one end of the bridge with an expansion joint at the other end. Reinforced concrete beams (serving as longitudinal connections between the three adjacent flatcars) were installed to distribute live loads among the RRFCs. Guardrails and an asphalt milling driving surface completed the bridge. The Winnebago County Bridge was constructed using 89-ft-long flatcars. Preliminary calculations determined that they were not adequate to span 89 ft as a simple span. Therefore, the flatcars were supported by new, steel-capped piers and abutments at the RRFCs' bolsters and ends, resulting in a 66-ft main span and two 10-ft end spans. Due to the RRFC geometry, the longitudinal connections between adjacent RRFCs were inadequate to support significant loads; therefore, transverse, recycled timber planks were utilized to effectively distribute live loads to all three RRFCs. A gravel driving surface was placed on top of the timber planks, and a guardrail system was installed to complete the bridge. Bridge behavior predicted by grillage models for each bridge was validated by strain and deflection data from field tests; it was found that the engineered RRFC bridges have live load stresses significantly below the AASHTO Bridge Design Specification limits. To assist in future RRFC bridge projects, RRFC selection criteria were established for visual inspection and selection of structurally adequate RRFCs. In addition, design recommendations have been developed to simplify live load distribution calculations for the design of the bridges. Based on the results of this research, it has been determined that through proper RRFC selection, construction, and engineering, RRFC bridges are a viable, economic replacement system for low-volume road bridges.
Resumo:
Report on the Iowa Economic Development Authority for the year ended June 30, 2014
Resumo:
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.
Resumo:
Each year, IEDA’s contract compliance team compiles a report of the status of each business project awarded or under contract. The FY14 annual report measures status and progress of projects awarded since 2003 and tracked by the compliance team. Within this version of the report, the projects are grouped by status. Within this version of the report, the projects are first grouped by the status.
Resumo:
Each year, IEDA’s contract compliance team compiles a report of the status of each business project awarded or under contract. The FY14 annual report measures status and progress of projects awarded since 2003 and tracked by the compliance team. Within this version of the report, the projects are grouped by status. Within this version of the report, the projects are first grouped by the county in which they were awarded and subcategorized according to their status. Below is an explanation for each status as well as an explanation on how they appear within the report.
Resumo:
BACKGROUND: Home hospital is advocated in many western countries in spite of limited evidence of its economic advantage over usual hospital care. Heart failure and community-acquired pneumonia are two medical conditions which are frequently targeted by home hospital programs. While recent trials were devoted to comparisons of safety and costs, the acceptance of home hospital for patients with these conditions remains poorly described. OBJECTIVE: To document the medical eligibility and final transfer decision to home hospital for patients hospitalized with a primary diagnosis of heart failure or community-acquired pneumonia. DESIGN: Longitudinal study of patients admitted to the medical ward of acute care hospitals, up to the final decision concerning their transfer. SETTING: Medical departments of one university hospital and two regional teaching Swiss hospitals. PATIENTS: All patients admitted over a 9 month period to the three settings with a primary diagnosis of heart failure (n= 301) or pneumonia (n=441). MEASUREMENTS: Presence of permanent exclusion criteria on admission; final decision of (in)eligibility based on medical criteria; final decision regarding the transfer, taking into account the opinions of the family physician, the patient and informal caregivers. RESULTS: While 27.9% of heart failure and 37.6% of pneumonia patients were considered to be eligible from a medical point of view, the program acceptance by family physicians, patients and informal caregivers was low and a transfer to home hospital was ultimately chosen for just 3.8% of heart failure and 9.6% of pneumonia patients. There were no major differences between the three settings. CONCLUSIONS: In the case of these two conditions, the potential economic advantage of home hospital over usual inpatient care is compromised by the low proportion of patients ultimately transferred.
Resumo:
Iowa’s Re‐Envisioned Economic Development Roadmap includes a comprehensive and detailed assessment of Iowa’s economic position and strategic priorities. Embedded within this roadmap are several key themes of economic progress realized and potential economic success to be earned in the years to come.
Resumo:
Little is known about the financial burden of individuals with depressive symptoms. This study explored that burden, using data from the Survey of Health, Ageing, and Retirement in Europe. To assess the association between depressive symptoms and the individuals' financial burden for medical care and whether they forwent medical care because of costs, logistic regressions were performed that adjusted for age, gender, marital status, education, and chronic diseases. A total of 16,696 noninstitutionalized individuals aged 50-79 years were included in the study. Individuals with depressive symptoms and those without such symptoms bore a similar financial burden. However, individuals with depressive symptoms were at increased risk of forgoing care because of costs, which may worsen their health and financial situation
Resumo:
Iowa is a relatively small state and is on the rebound economically. It has an overall population that is stable, but which is shifting within the state from more rural areas to suburban and urban centers. There is a very tight labor market with high levels of employment. Iowa now has a time-sensitive opportunity to exert global leadership in renewable energy, while maintaining its leadership in other key industries like finance and agriculture.
Resumo:
The Iowa Department of Education and Iowa Workforce Development partnered to combine educational and workforce data. The collaboration led to the establishment of the Training and Employment Outcomes System (TEOS) which combines wage data with education records for community colleges. This report summarizes results on four areas: Descriptive wage summaries; the returns to education; transitions for program majors to the workforce; and the five-years in-state retention rate of community college graduates.
Resumo:
CIRAS professionals, the equipment they use to do their jobs, and the latest in technical support equipment. With these investments, CIRAS continues to meet the needs of Iowa manufacturers, whether in doing routine problem solving, long-range planning, or transferring newer technologies. In all of its services, but most notably in product development projects, one of the strengths of CIRAS lies in bringing ISU students into the picture, both to help reach project goals and as real-job learning experiences for the students.