976 resultados para Academic policies
Resumo:
Break-even analyses of the costs and benefits of six alternative bovine tuberculosis (bTB) control strategies were undertaken. The results show that some strategies, such as zoning, would require relatively small reductions in bTB incidence as a result to be cost effective, whilst for others, such as proactive badger removal, the costs would require a substantial and relatively rapid reduction in bTB incidence to be worthwhile.
Resumo:
The paper outlines EU policy on bioenergy, including biofuels, in the context of its policy initiatives to promote renewable energy to combat greenhouse gas emissions and climate change. The EU's Member States are responsible for implementing EU policy: thus, the UK's Renewables Obligation on electricity suppliers and its Renewable Transport Fuel Obligation and road-fuel tax rebates are examined. It is unlikely that EU policy is in conflict with the WTO Agreement on Agriculture or that on Subsidies and Countervailing Measures, but its provisions on environmental sustainability criteria could be problematic.
Resumo:
Many systems might have a long time dormant period, during which the systems are not operated. For example, most building services products are installed while a building is constructed, but they are not operated until the building is commissioned. Warranty terms for such products may cover the time starting from their installation times to the end of their warranty periods. Prior to the commissioning of the building, the building services products are protected by warranty although they are not operating. Developing optimal burn-in policies for such products is important when warranty cost is analysed. This paper considers two burn-in policies, which incur different burn-in costs, and have different burn-in effects on the products. A special case about the relationship between the failure rates of the products at the dormant state and at the operating state is presented. Numerical examples compare the mean total warranty costs of these two burn-in policies.
Resumo:
Constructing a building is a long process which can take several years. Most building services products are installed while a building is constructed, but they are not operated until the building is commissioned. The warranty term for the building service systems may cover the time starting from their installation to the end of the warranty period. Prior to the commissioning of the building, the building services systems are protected by warranty although they are not operated. The bum in time for such systems is important when warranty costs is analyzed. In this paper, warranty cost models for products with burn in periods are presented. Two burn in policies are developed to optimize the total mean warranty cost. A special case on the relationship between the failure rates of the product at the dormant state and at the I operating state is presented.