979 resultados para switching mode power supply
Resumo:
Bibliography: p. 39 (2d group)
Resumo:
Thesis (M.S.)--University of Illinois at Urbana-Champaign, 1966.
Resumo:
Bibliography: p. 46.
Resumo:
First report covers period from May 6, 1931 to Dec. 31, 1931.
Resumo:
"May 1, 1962."
Resumo:
SRIA-65, Reactor technology.
Resumo:
Mode of access: Internet.
Resumo:
"TID-3089 Reactors-Power."
Resumo:
"Contract No. AT(40-1)-2589."
Resumo:
"January 28, 1960."
Resumo:
"Prepared under contract with the United States Atomic Energy Commission, GNEC/AEC contract AT-(40-I)-2674 and PRWRA/AEC contract AT-(40-I)-2672."
Resumo:
"AEC Contract AT(04-3)-400."
Resumo:
"Other issues of this report may bear the number BAW-7."
Resumo:
"July 1978."
Resumo:
"DOE/EV-0095."