996 resultados para recovery plan
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Collection : Collection d'Anville ; 01183 B
Resumo:
Valid individualized case conceptualization methodologies, such as plan analysis, are rarely used for the psychotherapeutic treatment conceptualization and planning of bipolar affective disorder (BD), even if data do exist showing that psychotherapy interventions might be enhanced by applying such analyses for treatment planning for several groups of patients. We applied plan analysis as a research tool (Caspar, 1995) to N=30 inpatients presenting BD, who were interviewed twice. Our study aimed at producing a prototypical plan structure encompassing the most relevant data from the 30 individual case conceptualizations. Special focus was given to links with emotions and coping plans. Inter-rater reliability of these plan analyses was considered sufficient. Results suggest the presence of two subtypes based on plananalytic principles: emotion control and relationship control, along with a mixed form. These subtypes are discussed with regard to inherent plananalytic conflicts, specific emotions and coping plans, as well as symptom level and type. Finally, conclusions are drawn for enhancing psychotherapeutic practice with BD patients, based on the motive-oriented therapeutic relationship.
Resumo:
This document provides design and strategies for the capital complex. Also for future physical development of the complex.
Resumo:
To provide safe and modern transportation systems and services to individuals who travel in Iowa, the Iowa Department of Transportation has identified three broad-based and far-reaching strategic goals: accessibility, responsiveness and accountability. These goals are outlined in this plan, which is aligned with the Accountable Government Act. In addition, the plan specifically addresses strategic needs to serve our customers, and to respond to trends of a growing population and the ever changing need to enhance and expand Iowa's transportation systems. This plan is a living document, and therefore, will be updated periodically.
Resumo:
Échelle(s) : Échelle non déterminable
Resumo:
Recent data have implicated thrombospondin-1 (TSP-1) signaling in the acute neuropathological events that occur in microvascular endothelial cells (ECs) following spinal cord injury (SCI) (Benton et al., 2008b). We hypothesized that deletion of TSP-1 or its receptor CD47 would reduce these pathological events following SCI. CD47 is expressed in a variety of tissues, including vascular ECs and neutrophils. CD47 binds to TSP-1 and inhibits angiogenesis. CD47 also binds to the signal regulatory protein (SIRP)α and facilitates neutrophil diapedesis across ECs to sites of injury. After contusive SCI, TSP-1(-/-) mice did not show functional improvement compared to wildtype (WT) mice. CD47(-/-) mice, however, exhibited functional locomotor improvements and greater white matter sparing. Whereas targeted deletion of either CD47 or TSP-1 improved acute epicenter vascularity in contused mice, only CD47 deletion reduced neutrophil diapedesis and increased microvascular perfusion. An ex vivo model of the CNS microvasculature revealed that CD47(-/-)-derived microvessels (MVs) prominently exhibit adherent WT or CD47(-/-) neutrophils on the endothelial lumen, whereas WT-derived MVs do not. This implicates a defect in diapedesis mediated by the loss of CD47 expression on ECs. In vitro transmigration assays confirmed the role of SIRPα in neutrophil diapedesis through EC monolayers. We conclude that CD47 deletion modestly, but significantly, improves functional recovery from SCI via an increase in vascular patency and a reduction of SIRPα-mediated neutrophil diapedesis, rather than the abrogation of TSP-1-mediated anti-angiogenic signaling.
Resumo:
Ancien possesseur : Argenson, Antoine-René de Voyer (1722-1787 ; marquis de Paulmy d')
Resumo:
Annual Report, Agency Performance plan
Resumo:
The Iowa Department of Transportation (DOT), working closely with the Federal Aviation Administration (FAA), strives to ensure that Iowa’s system of public airports is positioned to meet the needs of businesses, residents, and visitors to our state. Airports must be accessible and positioned to safely meet different levels of aviation activity. In partnership with the FAA and various cities, counties, and airport authorities, the Iowa DOT helps to direct the systematic development of public airports. This report is a summary of a more comprehensive technical report that outlines a strategic plan for improving the performance of airports in Iowa over the next 20 years. More information on the technical report and on individual reports prepared for each of the public airports can be obtained from the Iowa DOT, Office of Aviation website at www.iawings.com. The Iowa Aviation System Plan provides the Iowa DOT with an important tool to monitor the ability of airports to meet customer needs. The plan also provides a means to measure the effects of investment on the performance of the Iowa Aviation System. Over the next 20 years, federal, state, local, and private funding will be needed to ensure that the aviation system meets goals established in this study. It is estimated that at least $821 million will be needed over the next 20 years if airports in Iowa are to respond to objectives set by the system plan. In future years, the plan will enable the Iowa DOT to measure system performance. By tracking key indicators for the airport system, it will be possible for the Iowa DOT and the FAA to formulate strategies for responding to Iowa’s air transportation needs. The Iowa Aviation System Plan provides a guide for the state and its communities to ensure that the vision established for the Iowa Aviation System can be achieved.