958 resultados para United States. Agency for International Development. Regional Center for Southern Africa
Resumo:
Processed.
Resumo:
Prepared at the request of Agency for International Development, by the division's Foreign Education Branch.
Resumo:
Final report: ERDA, Subtask 5 - OFEF Project.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
Printed by James Nichols, Warwick Square, London.
Resumo:
Sabin
Resumo:
Mode of access: Internet.
Resumo:
Includes index.
Resumo:
Prepared under University research contract no. DOT-TST-0S-40004 for Office of University Research, Dept. of Transportation.
Resumo:
Bibliography: p. 189-191.
Resumo:
Issues for <, Jan. 1895>-June 1922 called also whole no. <14>-190.
Resumo:
Photocopy. Ann Arbor, Mich., University Microfilms International, 1978.
Resumo:
"Issued December 1979."
Resumo:
Shipping list no.: 92-186-P.
Resumo:
Mode of access: Internet.