1000 resultados para U.S. Atomic Energy Commission. Technical Information Center.
Resumo:
"Final report for Atomic Power Division, Westinghouse Electric Corporation, Bettis Field, Pittsburgh, Pennsylvania"--Added title page.
Resumo:
Work performed under Contract No. AT(11-1)-74 with the assistance of the California Research Group, Richmond, California.
Resumo:
"Originally planned for publication as Volume 19C, Div. IV, of the National Nuclear Energy Series. Several of the papers originally intended for this volume have appeared in ... scientific journals and were, therefore, omitted. These are listed in the Bibliography at the end of the volume."
Resumo:
Work done by the National Bureau of Standards, Washington, D.C.
Resumo:
"July 1955."
Resumo:
Three samples of thorium powder as supplied by Horizons, Inc. of Cleveland, Ohio were compared. The powder was processed entirely without the use of protective atmospheres with the exception of the sintering which was performed in a tank argon atmosphere with a dew point of approximately -80°C and the hot-pressing which was carried out in vacuum. The equipment and procedures used for cold-pressing and sintering were identical to those used in the evaluation of Sylvania produced thorium powders. The hot-pressing was done with standard uranium hot-pressing equipment.
Resumo:
Sponsored by the Atomic Energy Commission and the Bureau of Ships, Dept. of the Navy.
Resumo:
Cover title.
Resumo:
"This report was prepared at the request of the United States Atomic energy commission by Messrs. Harry I. Miller ... and F. Douglas Campbell."
Resumo:
"Contract AT(30-1)-2181."
Resumo:
"Nuclear Power Group."
Resumo:
"March 1, 1959 - March 31, 1960."
Resumo:
At head of title on cover: "U.S. Atomic Energy Commission Plowshare Program, Project GNOME, Carlsbad, New Mexico.
Resumo:
Prepared for U.S. Atomic Energy Commission.
Resumo:
"U.S. Atomic Energy Commission. Plowshare Program"--Cover.