911 resultados para Technical requirements
Resumo:
Two-dimensional and 3D quantitative structure-activity relationships studies were performed on a series of diarylpyridines that acts as cannabinoid receptor ligands by means of hologram quantitative structure-activity relationships and comparative molecular field analysis methods. The quantitative structure-activity relationships models were built using a data set of 52 CB1 ligands that can be used as anti-obesity agents. Significant correlation coefficients (hologram quantitative structure-activity relationships: r 2 = 0.91, q 2 = 0.78; comparative molecular field analysis: r 2 = 0.98, q 2 = 0.77) were obtained, indicating the potential of these 2D and 3D models for untested compounds. The models were then used to predict the potency of an external test set, and the predicted (calculated) values are in good agreement with the experimental results. The final quantitative structure-activity relationships models, along with the information obtained from 2D contribution maps and 3D contour maps, obtained in this study are useful tools for the design of novel CB1 ligands with improved anti-obesity potency.
Resumo:
The print- and mailroom at Gefle Dagblad (GD-tyck) is handling an increasing amount of commercial jobsalong with the newspaper production. Investments have above all been done in the mailroom to be able tooffer commercial costumers a higher degree of finishing and there are plans to expand further in the commercialmarket. GD-tryck is of the opinion that they need to secure the quality of their production to be ableto do such expansion, which is the reason why a quality system of some kind may be appropriate. Howeverthere are no plans to certify such a quality system according to ISO 9001:2000.In this exam report the present methods of working have been analysed from a quality perspective.Suggestions on how GD-tryck should be working with quality development is presented in the fields whereshortage of quality has been discovered. The suggestions taken together do not form a quality system butcan be looked at as ideas of approach to quality fields that have to be developed if a working quality systemshall be accomplished.Many of the quality fields that have been discussed do not have anything to do with technical qualitydirectly but are in some degree requirements for a working quality system. It also feels urgent to illustratethese fields in this exam report when most people at GD seems to place quality as identical with technicalquality. Technical quality is also a quality field where GD-tryck has few concrete problems today and theyalready produce printed matters of a high quality. Afact that might make it difficult to adopt a quality systemas the benefits of such a system is not obvious.
Resumo:
The purpose of this thesis is to present and describe which criteria, according to the systemfamily Configuration Management, should be met when developing a CM-tool to handlemigration data.ACT is a tool developed by Microsoft to gather information about, analyze, test and mitigateapplications in a network when migrating the IT-infrastructure of an organization to a newoperating system. The organization that is being studied wants to present the data about theanalyzed applications in such a way, that a customer can choose what to mitigate and migrate.The goal is therefore to develop a prototype (CM-tool) that will present this data.The study has shown that ACT lacks certain requirements stated by the organization when itcomes to presentation. But when it comes to the rest of the functions, ACT performs as expected.The investigation resulted in specifications and technical solution for the new CM-tool. CMcriteriafor migration data was put forth and parts of the prototype were also developed.
Resumo:
At the beginning of 2003 the four year long research project REBUS on education, research, development and demonstration of competitive solar combisystems was launched. Research groups in Norway, Denmark, Sweden and Latvia are working together with partners from industry on innovative solutions for solar heating in the Nordic countries. Existing system concepts have been analyzed and based on the results new system designs have been developed. The proposed solutions have to fulfill country specific technical, sociological and cost requirements. Due to the similar demands on the systems in Denmark and Sweden it has been decided to develop a common system concept for both countries, which increases the market potential for the manufacturer. The focus of the development is on systems for the large number of rather well insulated existing single family houses. In close collaboration with the industrial partners a system concept has been developed that is characterized by its high compactness and flexibility. It allows the use of different types of boilers, heating distribution systems and a variable store and collector size. Two prototypes have been built, one for the Danish market with a gas boiler, and one for the Swedish market with a pellet boiler as auxiliary heater. After intensive testing and eventual further improvements at least two systems will be installed and monitored in demonstration houses. The systems have been modeled in TRNSYS and the simulation results will be used to further improve the system and evaluate the system performance.
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.
Resumo:
We consider method of moment fixed effects (FE) estimation of technical inefficiency. When N, the number of cross sectional observations, is large it ispossible to obtain consistent central moments of the population distribution of the inefficiencies. It is well-known that the traditional FE estimator may be seriously upward biased when N is large and T, the number of time observations, is small. Based on the second central moment and a single parameter distributional assumption on the inefficiencies, we obtain unbiased technical inefficiencies in large N settings. The proposed methodology bridges traditional FE and maximum likelihood estimation – bias is reduced without the random effects assumption.
Resumo:
The FE ('fixed effects') estimator of technical inefficiency performs poorly when N ('number of firms') is large and T ('number of time observations') is small. We propose estimators of both the firm effects and the inefficiencies, which have small sample gains compared to the traditional FE estimator. The estimators are based on nonparametric kernel regression of unordered variables, which includes the FE estimator as a special case. In terms of global conditional MSE ('mean square error') criterions, it is proved that there are kernel estimators which are efficient to the FE estimators of firm effects and inefficiencies, in finite samples. Monte Carlo simulations supports our theoretical findings and in an empirical example it is shown how the traditional FE estimator and the proposed kernel FE estimator lead to very different conclusions about inefficiency of Indonesian rice farmers.
Resumo:
During the development of system requirements, software system specifications are often inconsistent. Inconsistencies may arise for different reasons, for example, when multiple conflicting viewpoints are embodied in the specification, or when the specification itself is at a transient stage of evolution. These inconsistencies cannot always be resolved immediately. As a result, we argue that a formal framework for the analysis of evolving specifications should be able to tolerate inconsistency by allowing reasoning in the presence of inconsistency without trivialisation, and circumvent inconsistency by enabling impact analyses of potential changes to be carried out. This paper shows how clustered belief revision can help in this process. Clustered belief revision allows for the grouping of requirements with similar functionality into clusters and the assignment of priorities between them. By analysing the result of a cluster, an engineer can either choose to rectify problems in the specification or to postpone the changes until more information becomes available.