966 resultados para Strategic organizations


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper explains the conflictive and cooperative elements of energy diplomacy between the European Union (EU) and Russia. It argues that interdependence forms the underlying principle of this relationship and creates both sensitivity and vulnerability for the interdependent parties, thus carrying the sperms of both conflict and cooperation. Both sides would be negatively affected by the other side’s noncooperation within the current policy framework and the prevailing mistrust and recurring tensions can be explained by this sensitivity. However, even if both sides’ policies were adjusted, vulnerability interdependence would still prevent them from seriously reducing their energy cooperation. It is necessary then to see how EU and Russian energy diplomacy can converge and how their strategic energy partnership can be cemented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the UK, the recycling of sewage sludge to land is expected to double by 2006 but the security of this route is threatened by environmental concerns and health scares. Strategic investment is needed to ensure sustainable and secure sludge recycling outlets. At present, the security of this landbank for sludge recycling is determined by legislation relating to nutrient rather than potentially toxic elements (PTEs) applications to land - especially the environmental risk linked to soil phosphorus (P) saturation. We believe that not all land has an equal risk of contributing nutrients derived from applications to land to receiving waters. We are currently investigating whether it is possible to minimise nutrient loss by applying sludge to land outside Critical Source Areas (CSAs) regardless of soil P Index status. Research is underway to develop a predictive and spatially-sensitive, semi-distributed model of critical thresholds for sludge application that goes beyond traditional 'end-of-pipe" or "edge-of-field" modelling, to include hydrological flow paths and delivery mechanisms to receiving waters from non-point sources at the catchment scale.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A multi-scale framework for decision support is presented that uses a combination of experiments, models, communication, education and decision support tools to arrive at a realistic strategy to minimise diffuse pollution. Effective partnerships between researchers and stakeholders play a key part in successful implementation of this strategy. The Decision Support Matrix (DSM) is introduced as a set of visualisations that can be used at all scales, both to inform decision making and as a communication tool in stakeholder workshops. A demonstration farm is presented and one of its fields is taken as a case study. Hydrological and nutrient flow path models are used for event based simulation (TOPCAT), catchment scale modelling (INCA) and field scale flow visualisation (TopManage). One of the DSMs; The Phosphorus Export Risk Matrix (PERM) is discussed in detail. The PERM was developed iteratively as a point of discussion in stakeholder workshops, as a decision support and education tool. The resulting interactive PERM contains a set of questions and proposed remediation measures that reflect both expert and local knowledge. Education and visualisation tools such as GIS, risk indicators, TopManage and the PERM are found to be invaluable in communicating improved farming practice to stakeholders. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.