965 resultados para Records management
An intervention study to improve pain management by nurses : normative beliefs and perceived control
Resumo:
Based on a predictive model of nurses' intentions regarding pain management, an intervention was developed to improve nurses' pain management. The intervention involved a series of workshops with cohorts of nurses working in acute care wards to address the important antecedents to their intentions: normative beliefs and perceived control. Pre- and post-intervention measures demonstrate the effectiveness of the intervention. The effectiveness of this intervention in improving the management of patients' pain is compared with a patient education program group and a control group. The findings provide support for further developing interventions based on the theory of planned behavior.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
This chapter presents a comparative survey of recent key management (key distribution, discovery, establishment and update) solutions for wireless sensor networks. We consider both distributed and hierarchical sensor network architectures where unicast, multicast and broadcast types of communication take place. Probabilistic, deterministic and hybrid key management solutions are presented, and we determine a set of metrics to quantify their security properties and resource usage such as processing, storage and communication overheads. We provide a taxonomy of solutions, and identify trade-offs in these schemes to conclude that there is no one-size-fits-all solution.
Resumo:
Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.
Resumo:
QUT’s new metadata repository (data registry), Research Data Finder, has been designed to promote the visibility and discoverability of QUT research datasets. Funded by the Australian National Data Service (ANDS), it will provide a qualitative snapshot of research data outputs created or collected by members of the QUT research community that are available via open or mediated access. As a fully integrated metadata repository Research Data Finder aligns with institutional sources of truth, such as QUT’s research administrative system, ResearchMaster, as well as QUT’s Academic Profiles system to provide high quality data descriptions that increase awareness of, and access to, shareable research data. In addition, the repository and its workflows are designed to foster smoother data management practices, enhance opportunities for collaboration and research, promote cross-disciplinary research and maximize existing research datasets. The metadata schema used in Research Data Finder is the Registry Interchange Format - Collections and Services (RIF-CS), developed by ANDS in 2009. This comprehensive schema is potentially complex for researchers; unlike metadata for publications, which are often made publicly available with the official publication, metadata for datasets are not typically available and need to be created. Research Data Finder uses a hybrid self-deposit and mediated deposit system. In addition to automated ingests from ResearchMaster (research project information) and Academic Profiles system (researcher information), shareable data is identified at a number of key “trigger points” in the research cycle. These include: research grant proposals; ethics applications; Data Management Plans; Liaison Librarian data interviews; and thesis submissions. These ingested records can be supplemented with related metadata including links to related publications, such as those in QUT ePrints. Records deposited in Research Data Finder are harvested by ANDS and made available to a national and international audience via Research Data Australia, ANDS’ discovery service for Australian research data. Researcher and research group metadata records are also harvested by the National Library of Australia (NLA) and these records are then published in Trove (the NLA’s digital information portal). By contributing records to the national infrastructure, QUT data will become more visible. Within Australia and internationally, many funding bodies have already mandated the open access of publications produced from publicly funded research projects, such as those supported by the Australian Research Council (ARC), or the National Health and Medical Research Council (NHMRC). QUT will be well placed to respond to the rapidly evolving climate of research data management. This project is supported by the Australian National Data Service (ANDS). ANDS is supported by the Australian Government through the National Collaborative Research Infrastructure Strategy Program and the Education Investment Fund (EIF) Super Science Initiative.
Resumo:
Process-oriented thinking has become the major paradigm for managing companies and other organizations. The push for better processes has been even more intense due to rapidly evolving client needs, borderless global markets and innovations swiftly penetrating the market. Thus, education is decisive for successfully introducing and implementing Business Process Management (BPM) initiatives. However, BPM education has been an area of challenge. This special issue aims to provide current research on various aspects of BPM education. It is an initial effort for consolidating better practices, experiences and pedagogical outcomes founded with empirical evidence to contribute towards the three pillars of education: learning, teaching, and disseminating knowledge in BPM.
Resumo:
Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.
Resumo:
To protect the health information security, cryptography plays an important role to establish confidentiality, authentication, integrity and non-repudiation. Keys used for encryption/decryption and digital signing must be managed in a safe, secure, effective and efficient fashion. The certificate-based Public Key Infrastructure (PKI) scheme may seem to be a common way to support information security; however, so far, there is still a lack of successful large-scale certificate-based PKI deployment in the world. In addressing the limitations of the certificate-based PKI scheme, this paper proposes a non-certificate-based key management scheme for a national e-health implementation. The proposed scheme eliminates certificate management and complex certificate validation procedures while still maintaining security. It is also believed that this study will create a new dimension to the provision of security for the protection of health information in a national e-health environment.
Resumo:
Irrigation is known to stimulate soil microbial carbon and nitrogen turnover and potentially the emissions of nitrous oxide (N2O) and carbon dioxide (CO2). We conducted a study to evaluate the effect of three different irrigation intensities on soil N2O and CO2 fluxes and to determine if irrigation management can be used to mitigate N2O emissions from irrigated cotton on black vertisols in South-Eastern Queensland, Australia. Fluxes were measured over the entire 2009/2010 cotton growing season with a fully automated chamber system that measured emissions on a sub-daily basis. Irrigation intensity had a significant effect on CO2 emission. More frequent irrigation stimulated soil respiration and seasonal CO2 fluxes ranged from 2.7 to 4.1 Mg-C ha−1 for the treatments with the lowest and highest irrigation frequency, respectively. N2O emission happened episodic with highest emissions when heavy rainfall or irrigation coincided with elevated soil mineral N levels and seasonal emissions ranged from 0.80 to 1.07 kg N2O-N ha−1 for the different treatments. Emission factors (EF = proportion of N fertilizer emitted as N2O) over the cotton cropping season, uncorrected for background emissions, ranged from 0.40 to 0.53 % of total N applied for the different treatments. There was no significant effect of the different irrigation treatments on soil N2O fluxes because highest emission happened in all treatments following heavy rainfall caused by a series of summer thunderstorms which overrode the effect of the irrigation treatment. However, higher irrigation intensity increased the cotton yield and therefore reduced the N2O intensity (N2O emission per lint yield) of this cropping system. Our data suggest that there is only limited scope to reduce absolute N2O emissions by different irrigation intensities in irrigated cotton systems with summer dominated rainfall. However, the significant impact of the irrigation treatments on the N2O intensity clearly shows that irrigation can easily be used to optimize the N2O intensity of such a system.
Resumo:
Background and Aims: Irrigation management affects soil water dynamics as well as the soil microbial carbon and nitrogen turnover and potentially the biosphere-atmosphere exchange of greenhouse gasses (GHG). We present a study on the effect of three irrigation treatments on the emissions of nitrous oxide (N2O) from irrigated wheat on black vertisols in South-Eastern Queensland, Australia. Methods: Soil N2O fluxes from wheat were monitored over one season with a fully automated system that measured emissions on a sub-daily basis. Measurements were taken from 3 subplots for each treatment within a randomized split-plot design. Results: Highest N2O emissions occurred after rainfall or irrigation and the amount of irrigation water applied was found to influence the magnitude of these “emission pulses”. Daily N2O emissions varied from -0.74 to 20.46 g N2O-N ha-1 day-1 resulting in seasonal losses ranging from 0.43 to 0.75 kg N2O N ha-1 season -1 for the different irrigation treatments. Emission factors (EF = proportion of N fertilizer emitted as N2O) over the wheat cropping season, uncorrected for background emissions, ranged from 0.2 to 0.4% of total N applied for the different treatments. Highest seasonal N2O emissions were observed in the treatment with the highest irrigation intensity; however, the N2O intensity (N2O emission per crop yield) was highest in the treatment with the lowest irrigation intensity. Conclusions: Our data suggest that timing and amount of irrigation can effectively be used to reduce N2O losses from irrigated agricultural systems; however, in order to develop sustainable mitigation strategies the N2O intensity of a cropping system is an important concept that needs to be taken into account.
Resumo:
In this Column, I have decided to give you an insight into a both outward and forward looking area of BPM research; in fact, we want to discuss one of the streams of research and development that are yet to find a way of translation into practice. To that end, I have teamed up with colleagues and students here at Queensland University of Technology with whom I have shared some thinking and research around BPM in Virtual Environments (hence, BPMVE).
Resumo:
Efficient state asset management is crucial for governments as they facilitate the fulfillment of their public functions, which include the provision of essential services and other public administration support. In recent times economies internationally and particularly in South east Asia, have displayed increased recognition of the importance of efficiencies across state asset management law, policies and practice. This has been exemplified by a surge in notable instances of reform in state asset management. A prominent theme in this phenomenon is the consideration of governance principles within the re-conceptualization of state asset management law and related policy, with many countries recognizing variability in the quality of asset governance and opportunities for profit as being critical factors. This issue is very current in Indonesia where a major reform process in this area has been confirmed by the establishment of a new Directorate of State Asset Management. The incumbent Director-General of State Asset Management has confirmed a re-emphasis on adherence to governance principles within applicable state asset management law and policy reform. This paper reviews aspects of the challenge of reviewing and reforming Indonesian practice within state asset management law and policy specifically related to public housing, public buildings, parklands, and vacant land. A critical issue in beginning this review is how Indonesia currently conceptualizes the notion of asset governance and how this meaning is embodied in recent changes in law and policy and importantly in options for future change. This paper discusses the potential complexities uniquely Indonesian characteristics such as decentralisation and regional autonomy regime, political history, and bureaucratic culture.
Resumo:
This study seeks to answer the question of “why is policy innovation in Indonesia, in particular reformed state asset management laws and regulations, stagnant?” through an empirical and qualitative approach, identifying and exploring potential impeding influences to the full and equal implementation of said laws and regulations. The policies and regulations governing the practice of state asset management has emerged as an urgent question among many countries worldwide (Conway, 2006; Dow, Gillies, Nichols, & Polen, 2006; Kaganova, McKellar, & Peterson, 2006; McKellar, 2006b) for there is heightened awareness of the complex and crucial role that state assets play in public service provision. Indonesia is an example of such country, introducing a ‘big-bang’ reform in state asset management laws, policies, regulations, and technical guidelines. Two main reasons propelled said policy innovation: a) world-wide common challenges in state asset management practices - such as incomplete information system, accountability, and governance adherence/conceptualisation (Kaganova, McKellar and Peterson 2006); and b) unfavourable state assets audit results in all regional governments across Indonesia. The latter reasoning is emphasised, as the Indonesian government admits to past neglect in ensuring efficiency and best practice in its state asset management practices. Prior to reform there was euphoria of building and developing state assets and public infrastructure to support government programs of the day. Although this euphoria resulted in high growth within Indonesia, there seems to be little attention paid to how state assets bought/built is managed. Up until 2003-2004 state asset management is considered to be minimal; inventory of assets is done manually, there is incomplete public sector accounting standards, and incomplete financial reporting standards (Hadiyanto 2009). During that time transparency, accountability, and maintenance state assets was not the main focus, be it by the government or the society itself (Hadiyanto 2009). Indonesia exemplified its enthusiasm in reforming state asset management policies and practices through the establishment of the Directorate General of State Assets in 2006. The Directorate General of State Assets have stressed the new direction that it is taking state asset management laws and policies through the introduction of Republic of Indonesia Law Number 38 Year 2008, which is an amended regulation overruling Republic of Indonesia Law Number 6 Year 2006 on Central/Regional Government State Asset Management (Hadiyanto, 2009c). Law number 38/2008 aims to further exemplify good governance principles and puts forward a ‘the highest and best use of assets’ principle in state asset management (Hadiyanto, 2009a). The methodology of this study is that of qualitative case study approach, with a triangulated data collection method of document analysis (all relevant state asset management laws, regulations, policies, technical guidelines, and external audit reports), semi-structured interviews, and on-site observation. Empirical data of this study involved a sample of four Indonesian regional governments and 70 interviews, performed during January-July 2010. The analytical approach of this study is that of thematic analysis, in an effort to identify common influences and/or challenges to policy innovation within Indonesia. Based on the empirical data of this study specific impeding influences to state asset management reform is explored, answering the question why innovative policy implementation is stagnant. An in-depth analysis of each influencing factors to state asset management reform, and the attached interviewee’s opinions for each factor, suggests the potential of an ‘excuse rhetoric’; whereby the influencing factors identified are a smoke-screen, or are myths that public policy makers and implementers believe in; as a means to explain innovative policy stagnancy. This study offers insights to Indonesian policy makers interested in ensuring the conceptualisation and full implementation of innovative policies, particularly, although not limited to, within the context of state asset management practices.
Resumo:
A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
Resumo:
Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.