967 resultados para Radioactive installation
Resumo:
Numerous piles are often subjected to the combination of cyclic axial and cyclic lateral loads in service, such as piled foundations for offshore platforms which may suffer swaying and rocking motions owing to wind and wave actions. In this research, centrifuge tests were conducted to investigate the effect of previous cyclic axial loads on the performance of pile groups subjected to subsequent cyclic lateral loads. Different pile installation methods were also applied to study the different behaviour of bored and jacked pile groups subjected to cyclic loads. During lateral load cycling, it is seen that cyclic axial loads to which pile groups were previously subjected could reduce the pile cap permanent lateral displacement in the first lateral load cycle but do not influence the incremental rate of permanent displacement in the following lateral load cycles. Moreover, it is found that previous cyclic axial loads could improve the pile cap cyclic lateral secant stiffness, especially for the pre-jacked pile group. When rocking motions were induced by cyclic lateral loads, pile groups subjected to cyclic axial loads before have smaller permanent settlement than those without the cyclic axial loading effect. The designers of piles that are intended to resist significant lateral loads without excessive deformations in service may wish to deploy cyclic axial preloading, accordingly.
Resumo:
On-site tracking in open construction sites is often difficult because of the large amounts of items that are present and need to be tracked. Additionally, the amounts of occlusions/obstructions present create a highly complex tracking environment. Existing tracking methods are based mainly on Radio Frequency technologies, including Global Positioning Systems (GPS), Radio Frequency Identification (RFID), Bluetooth and Wireless Fidelity (Wi-Fi, Ultra-Wideband, etc). These methods require considerable amounts of pre-processing time since they need to manually deploy tags and keep record of the items they are placed on. In construction sites with numerous entities, tags installation, maintenance and decommissioning become an issue since it increases the cost and time needed to implement these tracking methods. This paper presents a novel method for open site tracking with construction cameras based on machine vision. According to this method, video feed is collected from on site video cameras, and the user selects the entity he wishes to track. The entity is tracked in each video using 2D vision tracking. Epipolar geometry is then used to calculate the depth of the marked area to provide the 3D location of the entity. This method addresses the limitations of radio frequency methods by being unobtrusive and using inexpensive, and easy to deploy equipment. The method has been implemented in a C++ prototype and preliminary results indicate its effectiveness
Resumo:
Tracking methods have the potential to retrieve the spatial location of project related entities such as personnel and equipment at construction sites, which can facilitate several construction management tasks. Existing tracking methods are mainly based on Radio Frequency (RF) technologies and thus require manual deployment of tags. On construction sites with numerous entities, tags installation, maintenance and decommissioning become an issue since it increases the cost and time needed to implement these tracking methods. To address these limitations, this paper proposes an alternate 3D tracking method based on vision. It operates by tracking the designated object in 2D video frames and correlating the tracking results from multiple pre-calibrated views using epipolar geometry. The methodology presented in this paper has been implemented and tested on videos taken in controlled experimental conditions. Results are compared with the actual 3D positions to validate its performance.
Resumo:
There are several reasons for monitoring of underground structures and they have already been discussed many times, e.g. from the view of ageing or state after accidental event like flooding of Prague metro in 2002. Monitoring of Prague metro is realized in the framework of international research project sponsored by ESF-S3T. The monitoring methods used in Prague are either classical one or new or developing one. The reason for different monitoring methods is the different precision of each method and also for cross-checking between them and their evaluation. Namely we use convergence, tiltmetres, crackmetres, geophysical methods, laser scanning, computer vision and finally installation of MEMS monitoring devices. In the paper more details of each method and obtained results will be presented. The monitoring methods are complemented by wireless data collection and transfer for real-time monitoring. © 2012 Taylor & Francis Group.
Resumo:
High-resolution γ-ray spectroscopy is essential to fully exploit the unique, high-quality beams available at the next generation of radioactive ion beam facilities such as the TRIUMF isotope separator and accelerator (ISAC). The 8π spectrometer, which consists of 20 Compton-suppressed HPGe detectors, has recently been reconfigured for a vigorous research programme in weak interaction and nuclear structure physics. With the addition of a variety of ancillary detectors it has become the world's most powerful device dedicated to β-decay studies. This paper provides a brief overview of the apparatus and highlights from recent experiments. © 2005 IOP Publishing Ltd.
Resumo:
Jacked piles are becoming a valuable installation method due to the low noise and vibration involved in the installation procedure. Cyclic jacking may be used in an attempt to decrease the required installation force. Small scale models of jacked piles were tested in sand and silt in a 10 m beam centrifuge. Two different piles were tested: smooth and rough. Piles were driven in two ways with monotonic and cyclically jacked installations. The cyclically jacked installation involves displacement reversal at certain depth for a fixed number of cycles. The depth of reversal and amplitude of the cycle vary for different tests. Data show that the base resistance increases during cyclic jacking due to soil compaction at the pile toe. On the other hand, shaft load decreases with the number of cycles applied due to densification of soil next to the pile shaft. Cyclic jacking may be used in unplugged tubular piles to decrease the required installation load. © 2013 Taylor & Francis Group, London.
Resumo:
The finite element method (FEM) is growing in popularity over the pressure diagram/hand calculation method for analysis of excavation systems in general and deep soil mixing excavations in particular. In this paper, a finite element analysis is used to study the behavior of a deep mixed excavation. Through the use of Plaxis (a FEM software program), the construction sequence is simulated by following the various construction phases allowing for deflections due to strut or anchor installation to be predicted. The numerical model used in this study simulates the soil cement columns as a continuous wall matching the bending stiffness of the actual wall. Input parameters based on laboratory tests and modeling assumptions are discussed. An example of the approach is illustrated using the Islais Creek Transport/Storage Project in San Francisco, California. Copyright ASCE 2006.
Resumo:
Due to their potential for significant fuel consumption savings, Counter-Rotating Open Rotors (CRORs) are currently being considered as an alternative to high-bypass turbofans. When CRORs are mounted on an aircraft, several 'installation effects' arise which are not present when the engine is operated in isolation. This paper investigates how flow features arising from one such effect - The angle-of-attack of the engine centre-line relative to the oncoming flow - can influence the design of CROR engines. Three-dimensional full-annulus unsteady CFD simulations are used to predict the time-varying flow field experienced by each rotor and emphasis is put on the interaction of the frontrotor wake and tip vortex with the rear-rotor. A parametric study is presented that quantifies the rotorrotor interaction as a function of the angle-of-attack. It is shown that angle-of-attack operation significantly changes the flow field and the unsteady lift on both rotors. In particular, a frequency analysis shows that the unsteady lift exhibits sidebands around the rotor-rotor interaction frequencies. Further, a non-linear increase in the total rear-rotor tip unsteadiness is observed for moderate and high angles-of-attack. The results presented in this paper demonstrate that common techniques used to mitigate CROR noise, such as modifying the rotor-rotor axial spacing and rear-rotor crop, can not be applied correctly unless angle-of-attack effects are taken into account. Copyright © 2012 by ASME.
Resumo:
Pile jacking is a common installation method for displacement piles due to the low noise and vibration involved in the installation procedure. Problems may occur when modelling jacked piles in the centrifuge, especially for friction piles, due to scaling effects which can be minimised, provided that the pile diameter is greater than fifty times the mean grain size. A series of centrifuge tests of jacked piles was performed in both dry and saturated fine sand. Piles were installed using three different methods. The effect of the installation method on the head load required is assessed. The influence of the normalised roughness was also tested by testing one rough and one smooth pile. Finally, cyclic shearing at constant depth was performed to establish the shaft load reduction due to friction fatigue. © 2014 Taylor & Francis Group.
Resumo:
In the central part of the Delft railway tunnel project, an underground railway station is being built at very close distance to the existing station building, which is still in operation. Although elaborate sensitivity analyses were made, some unforeseen deformations were encountered during the first phases of the execution process. Especially the installation of temporary sheet pile walls as well as the installation of a huge amount of grout anchor piles resulted in deformations exceeding the predicted final deformations as well as the boundary values defined by a level I limiting tensile strain method (LTSM) approach. In order to ensure the execution process, supplementary analyses were made to predict future deformations, and this for multiple cross sections. These deformations were implemented into a finite element model of the masonry of the building in order to define probable crack formation. This Level II LTSM approach made it possible to increase the initially foreseen deformation criteria and the continuation of the works. Design steps, design models and monitoring results will be explained within this paper.
Resumo:
大型制冷机组部件众多,管路比较复杂,又是必须承受高压的容器,安装、调试都有严格的要求。以30HXC165A制冷机组的现场冲洗、调试为例,详细介绍了大型制冷机组在试运行之前标准的准备工作。这些工作包括吹扫、试压、排污、充注制冷剂和冲洗调试等全部过程及注意事项。本文为大型螺杆式制冷机组这种压力容器设备的运行和维护管理提供了工程实践经验。结果表明:在施工调试过程中,只有各方互相协调,并且严格按照相关文件和规范要求才能顺利完成制冷机组的安装调试,为以后的正常运行打下基础。
Strict requirements must be met during the installation and commissioning program for the large-scale chiller units since it has multitudinous components and complicated pipelines with high-pressure vessels. Preparation program was present in detail for large-scale chiller units before commissioning as the example of 30HXC165A chiller units. The total arrangement was considered about chiller units in terms of blowing, pressure trial, drainage, refrigerant filling, flushing and commissioning. The paper also provides the operation and maintenance engineering experience for large-scale screw chiller units. The results indicate that installation and commissioning can be achieved only strict abidance the related regulations demand based on harmony of all engineering participants (owners, engineering, providers etc.). Furthermore, favorable installation and commissioning work can provide the reliable foundation of normal operation.
Resumo:
针对现有渗透变形仪存在的密封止水效果差、试样固定装置影响过流面积、仪器复杂等缺陷,通过对岩土渗透变形特性及测试原理进行分析,研制出一种适用于黏性土、水泥土类的新型渗透变形仪,该仪器设计方法独特,在试样外套橡皮膜并加围压的柔性密封止水,以及在试样顶部采用圆环型透水石固定试样等方法,既能测定岩土体的渗透系数又能测定渗透变形特性,同时,既保证试样的渗流面积不受影响又允许试样产生渗透变形,而且在渗透水压力作用下试样周围的密封性良好。实际工程应用结果表明,该仪器测定的岩土体的渗透系数及抗渗比降具有很高的可靠性和精度。
Resumo:
The gas-jet recoil transport technique is developed and improved as a new rapid and effective on-line and off beam method following "rabbit" apparatus in the study of short lives nuclei. It can transport the short half-life nuclear reaction products far from high radioactive area for collection and measurement at low background area. This technique has been widely used in the researches with accelerator and reactor. It is indispensable basic experimental technology and tool applied to nuclear reaction, spec...中文摘要:气体喷嘴反冲传输技术是继"跑兔"装置之后发展和完善起来的适合于短寿命核素研究的一种快速而有效的在线脱束方法。它能够将短寿命核反应产物传输至远离高辐射区的低本底场所进行收集和测量。该技术已在加速器和反应堆上得到了广泛的应用,是一种研究核反应、核谱学和合成与鉴别新元素、新核素的一种不可缺少的基本实验技术和工具。描述了气嘴系统的结构、基本原理、设计要求以及它的主要特性,特别是对系统的气体动力学机制以及各种参数对系统特性的影响等进行了讨论。最后,综述了它在核物理、核化学以及质谱学等领域的应用情况,并且给出了几个应用的典型例子。
Resumo:
The excited states in 22Mg have been investigated by the resonant elastic scattering of 21Na + p.A 4.0 MeV/nucleon 21Na beam was separated by the Center for Nuclear Study (CNS) radioactive ion beam separator (CRIB) and then used to bombard a thick (CH2)n target. The energy spectra of recoiled protons were measured at scattering angles of θc.m. ≈ 172◦, 146◦, and 134◦, respectively. A wide energy-range of excitation function in 22Mg (up to Ex ∼ 8.9 MeV) was obtained simultaneously with a thick-target method, and a state at 7.06 MeV was newly observed. The resonant parameters were deduced from an R-matrix analysis of the center-of-mass (c.m.) differential cross-section data with a SAMMY-M6-BETA code. The astrophysical resonant reaction rate for the 18Ne(α,p)21Na reactionwas recalculated based on the present parameters.Generally speaking,the present rates are much smaller than the previous ones.