942 resultados para Operating costs.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.
Resumo:
Meeting the demand for independent living from the increasing number of older people presents a major challenge for society, government and the building industry. Older people's experience of disabling conditions can be affected by the design and layout of their accommodation. Adaptations and assistive technology (AT) are a major way of addressing this gap between functional capacity and the built environment. The degree of adaptability and the differences in the average cost of adaptation of different types of property are large and there is major variation within property type. Based on a series of user profiles, it was found that a comprehensive package of adaptations and AT is likely to result in significant economies arising from a reduction in the need for formal care services. This finding is sensitive to assumptions about how long an individual would use the adaptations and AT, as well as to the input of informal care and the nature of their accommodation. The present study, which focused on social housing, has implications for how practitioners specify ways of meeting individual needs as well as providing a case to support the substantial increase in demand for specialist adaptation work.
Resumo:
We examined how far, and at what cost, the housing stock could be modified to accommodate the assistive technology (AT) necessary to enable older people to remain in their own homes. A multidisciplinary team devised seven hypothetical user profiles for 10 case study areas, with five local authorities and five housing associations in England and Wales. Each profile was considered at two times, five years apart, with the users' functional abilities deteriorating in between. In addition, in-depth interviews were carried out with a sample of 67 older people in the case study areas about their use and experience of a wide range of AT. The interviews showed the need to listen to older people and that they welcomed AT when it addressed a perceived need. The results showed that the extent of adaptation required of buildings to accommodate a user's needs varied greatly. It was also found that there was confusion about the terminology of AT, including the idea of the 'smart house'. The study shows that the adaptability of the housing depends on a range of factors and costs.
Resumo:
The successful implementation of just-in-time (JIT) purchasing policy in many industries has prompted many companies that still use the economic order quantity (EOQ) purchasing policy to ponder if they should switch to the JIT purchasing policy. Despite existing studies that directly compare the costs between the EOQ and JIT purchasing systems, this decision is, however, still difficult to be made, especially when price discount has to be considered. JIT purchasing may not always be successful even though plants that adopted JIT operations have experienced or can take advantage of physical space reduction. Hence, the objective of this study is to expand on a classical EOQ with a price discount model to derive the EOQ–JIT cost indifference point. The objective was tested and achieved through a survey and case study conducted in the ready-mixed concrete industry in Singapore.
Resumo:
A model for comparing the inventory costs of purchasing under the economic order quantity (EOQ) system and the just-in-time (JIT) order purchasing system in existing literature concluded that JIT purchasing was virtually always the preferable inventory ordering system especially at high level of annual demand. By expanding the classical EOQ model, this paper shows that it is possible for the EOQ system to be more cost effective than the JIT system once the inventory demand approaches the EOQ-JIT cost indifference point. The case study conducted in the ready-mixed concrete industry in Singapore supported this proposition.
Resumo:
Many systems might have a long time dormant period, during which the systems are not operated. For example, most building services products are installed while a building is constructed, but they are not operated until the building is commissioned. Warranty terms for such products may cover the time starting from their installation times to the end of their warranty periods. Prior to the commissioning of the building, the building services products are protected by warranty although they are not operating. Developing optimal burn-in policies for such products is important when warranty cost is analysed. This paper considers two burn-in policies, which incur different burn-in costs, and have different burn-in effects on the products. A special case about the relationship between the failure rates of the products at the dormant state and at the operating state is presented. Numerical examples compare the mean total warranty costs of these two burn-in policies.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.
Resumo:
This paper addresses two critical issues associated with reliability and maintenance of building services systems. The first is the ratio of operating and/or maintenance costs to initial costs for building services systems. It is an important parameter for life cycle costing and maintenance policy development. The second is the proportion of items among building services systems that need preventive maintenance. In this paper, we estimate the ratios based on a cost dataset. It suggests that correctly estimating the ratio be important but using a constant ratio in life cycle costing may result in wrong decisions. It also estimates the proportion of preventive maintenance for building services systems on the basis of the distribution of failure patterns.
Resumo:
Constructing a building is a long process which can take several years. Most building services products are installed while a building is constructed, but they are not operated until the building is commissioned. The warranty term for the building service systems may cover the time starting from their installation to the end of the warranty period. Prior to the commissioning of the building, the building services systems are protected by warranty although they are not operated. The bum in time for such systems is important when warranty costs is analyzed. In this paper, warranty cost models for products with burn in periods are presented. Two burn in policies are developed to optimize the total mean warranty cost. A special case on the relationship between the failure rates of the product at the dormant state and at the I operating state is presented.
Resumo:
Since 1995 the Directive 93/43/EEC prescribes the application of HACCP principles in food production. However, despite the major importance of food safety, there is a fundamental lack of information on the economic impact of this directive. This project aims to study costs and benefits of HACCP, including the impact of HACCP on public health. Due to the complexity of the issue, we propose to start with a pilot study, limited to dairy and meat products industry in NL, UK and I. Information will be obtained at two levels: production chain and public health. Integration of these results will result in recommendations at the levels of EU member states and industry for regulation and supporting measures, and in recommendations for an effective and efficient approach for a more comprehensive project on costs and benefits of HACCP, covering major parts of the food industry in EU member states.
Resumo:
When people monitor a visual stream of rapidly presented stimuli for two targets (T1 and T2), they often miss T2 if it falls into a time window of about half a second after T1 onset-the attentional blink. However, if T2 immediately follows T1, performance is often reported being as good as that at long lags-the so-called Lag-1 sparing effect. Two experiments investigated the mechanisms underlying this effect. Experiment 1 showed that, at Lag 1, requiring subjects to correctly report both identity and temporal order of targets produces relatively good performance on T2 but relatively bad performance on T1. Experiment 2 confirmed that subjects often confuse target order at short lags, especially if the two targets are equally easy to discriminate. Results suggest that, if two targets appear in close succession, they compete for attentional resources. If the two competitors are of unequal strength the stronger one is more likely to win and be reported at the expense of the other. If the two are equally strong, however, they will often be integrated into the same attentional episode and thus get both access to attentional resources. But this comes with a cost, as it eliminates information about the targets' temporal order.
Resumo:
In this paper, we introduce a special issue about unique and shared mechanisms underlying the performance limitations observed in dual tasks. In particular, the relationship between task-switching costs, the attentional-blink effect, and the psychological refractory period effect is reviewed. These costs are traditionally attributed to fixed and unique capacity limitations for task set reconfiguration, target identification, and response selection, respectively However, we argue that more global attentional processes play a role that cuts across these paradigms. This is reason for a more paradigm-independent approach to processing limitations in dual tasks.