958 resultados para Management|Environmental management|Civil engineering


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Intrusion (unauthorized stepping-into/staying-in a hazardous area), as a common type of near-miss, is the prime cause of the majority of incidents on construction sites including fall from heights, and striking against or being struck by moving objects. Accidents often occur because workers take shortcuts moving about the site without fully perceiving the potential dangers. A number of researches have been devoted to developing methods to prevent such behaviors mainly based on the theory of Behavior-Based Safety (BBS), which aims to cultivate safety behaviors among workers in accordance with safety regulations. In current BBS practice, trained observers and safety supervisors are responsible for safety behavior inspections following safety plans and operation regulations. The observation process is time-consuming and its effectiveness depends largely on the observer’s safety knowledge and experience, which often results in omissions or bias. This paper presents a reformed safety behavior modification approach by integrating a location-based technology with BBS. Firstly, a detailed background is provided, covering current intrusion problems on site, existing use of BBS for behavior improvement, difficulties in achieving widespread adoption and potential technologies for location tracking and in-time feedback. Then, a conceptual framework of positioning technology-enhanced BBS is developed, followed by details of the corresponding on-line supporting system, Real Time Location System (RTLS) and Virtual Construction System (VCS). The application of the system is then demonstrated and tested in a construction site in Hong Kong. Final comments are made concerning further research direction and prospects for wider adoption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rapid population growth, changing demographic profiles and increased focus on sustainable urban form has led to significant changes in settlement patterns in Australian cities. Growth management strategies are increasingly employed to help cities manage strain on infrastructure, housing and ecosystems. Urban consolidation is one such strategy and has been adopted by all Australian capital cities. Despite strong governmental support, urban consolidation has triggered much academic debate and has often been accompanied by staunch community opposition and complaints from the development industry about barriers to the provision of higher density housing. Greater understanding of stakeholder representations of higher density housing is important for planning, given the strong policy focus on urban consolidation nationally. This paper contributes to existing urban consolidation literature by empirically demonstrating how urban consolidation is represented in Brisbane’s newspaper media through the use of metaphors. Its conceptual departure point is Social Representations Theory, drawing on the theory’s notion of objectification to illustrate how the media translates the abstract notion of urban consolidation into a tangible and understandable object. The objectification of urban consolidation is identified and discussed relative to four themes: land use conflict; growth; neighbourhood change and apartment living. This paper argues that understanding stakeholder representations is important for planners seeking to promote and negotiate delivery of higher density development. It concludes that stakeholder representations can highlight key areas of contention to be addressed by planners, provide indications on the likelihood of public acceptance of increased housing densities and delineate the boundaries of urban consolidation debates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Green building incentives are important to promoting green building. However, it lacks a systematic review of existing knowledge. This paper aims to elicit the common themes in studies of green building incentives through a systematic review. It is found that the common research areas into green building incentives are incentive categorisation, its effectiveness on promoting green building development, criticism of current green incentive implementation and strategies for improving green building incentives. Green building incentives are categorised into external and internal incentives. The external incentive is a forced choice whereby beneficiaries are required to fulfil specified conditions or requirements before benefitting, while the internal incentive allows beneficiaries to be incentivised out of volition because of the appeal of the benefits of green buildings. The external incentives, which are largely provided by the government, are divided into financial and non-financial incentives. It is found that owners are more incentivised by non-financial incentives. In terms of effectiveness, both external and internal incentives are important instruments for promoting green building, although it is not clear which are the more effective. Furthermore, the review uncovered criticisms of external green building incentives, which mainly focus on shortcomings in administering the incentives by the government. The strategies for improving green building incentives were also found, the most important of these being the need for the government to redirect its approach of providing incentives so that owners can be encouraged to pursue green building. The review findings signify the importance of the government in relation to green building incentives. Further research areas that could expand the knowledge of green building incentives are also recommended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large cities depend heavily on their metro systems to reduce traffic congestion, which is particularly the case with Shanghai, the largest and most developed city in China. For the purposes of enhancing the possibility in quantitative risk assessment and promoting the safety management level in Shanghai metro, an adaptable metro operation incident database (MOID) is therefore presented for containing details of all incidents that have occurred in metro operation. Taking compatibility and simplicity into consideration, Microsoft Access 2010 software is used for the comprehensive and thorough design of the MOID. Based on MOID, statistical characteristics of incident, such as types, causes, time, and severity, are discovered and 24 accident precursors are identified in Shanghai metro. The processes are demonstrated to show how the MOID can be used to identify trends in the incidents that have occurred and to anticipate and prevent future accidents. In order to promote the application of MOID, an organizational structure is proposed from the four aspects of supervision, research, implementation, and manufacturer. This research would be conducive to safety risk analysis in identifying relevant precursors in safety management and assessing safety level as a qualitative tool.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research project developed a quantitative approach to assess the risk to human health from heavy metals and polycyclic aromatic hydrocarbons in urban stormwater based on traffic and land use factors. The research outcomes are expected to strengthen the scientifically robust management and reuse of urban stormwater. The innovative methodology developed can be applied to evaluate human health risk in relation to toxic chemical pollutants in urban stormwater runoff and for the development of effective risk mitigation strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The movement to protect heritage places has grown enormously in Australia over the past decade. The renewed recognition of the significant roles that heritage places play in the urban environment today is encouraging but has a way to go if the demolition of memorable places and irreversible loss of intangible values seen in previous times is to be discontinued. This study investigated the perceptions of the general public and the professional stakeholders in heritage projects and found that they were very similar, particularly in relation to the reasons for heritage retention. The results indicate that, while there is growing interest in sustaining the reflection of the historic urban landscape by retaining cherished icons for the future, there needs to be better ways to overcome the modern development pressures on heritage sites. The paper concludes that, despite the challenges in heritage retention, they are outweighed by the value that accrues from preserving heritage places and the widespread appreciation of that value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public rental housing (PRH) projects are the mainstream of China's new affordable housing policies, and their integrated sustainability has a far-reaching effect on medium-low income families' well-being and social stability. However, there are few quantitative researches on the integrated sustainability of PRH projects. Our study tries to fill this gap through proposing an assessment model of the integrated sustainability for PRH projects. First, this paper defines what the sustainability of a PRH project is. Second, after constructing the sustainable system of a PRH project from the perspective of complex eco-system, the paper explores the internal operation mechanism and the coupling mechanism among the ecological, economic and social subsystems. Third, it identifies fourteen indices to represent the sustainability system of a PRH project, including six indices of ecological subsystem, five of economic subsystem and three of social subsystem. Fourth, it qualifies the weights of three subsystems and their internal representative indices. In addition, an assessment model is established through expert surveys and analytic network process (ANP). Finally, the paper carries out an empirical research on a PRH project in Nanjing city of China, followed by suggestions to enhance the integrated sustainability. The sustainability system and its evaluation model proposed in this paper are concise and easy to understand and can provide a theoretical foundation and a scientific basis for the evaluation and optimization of PRH projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis uses semi-structured interviews and documentary analysis to explore the impact of carbon sequestration rights on rural land in Queensland and to determine whether current rural valuation knowledge and practice is equipped to deal with these rights. The carbon right in Queensland is complex and subject to significant individual variation. The nature and form of this right will determine whether it has a positive or negative impact on Queensland rural land. Significant gaps in the knowledge of industry stakeholders, including rural valuers, concerning carbon rights were found, and recommendations for valuation practice were made.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is a digital process that encompasses all aspects, disciplines and systems of built assets within a single virtual model. This allows stakeholders to collaborate more accurately and efficiently than with traditional processes. Case study 1 Design: New Generation Rollingstock Maintenance Centre, Queensland. Case Study 2 Construction: Perth Children's Hospital, Western Australia. Case Study 3 Asset Management: Sydney Opera House, New South Wales. This project sought to provide the built environment industry with a framework to measure and maximize benefits from implementing BIM across the life-cycle phases of a built asset.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Any plan for decoupling growth from fossil fuel use needs to prioritise locally appropriate, integrated and multi-faceted outcomes. Such transitions can be highly complex, given the physical and institutional characteristics of existing electricity infrastructure as well as various financial, technical and practical challenges. This Chapter applies a whole systems perspective to developing decoupling solutions, reflecting on the Dutch Sustainable Technology Development Program and Townsville City (Queensland, Australia). Key aspects considered include the need for demonstrating outcomes to multiple stakeholders, using pilot projects with integrated monitoring and evaluation, fostering collaborative approaches to energy management, cultivating cultures of ‘learning by doing’, and seeking synergies across multiple agendas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis took a novel approach to examining factors associated with risky attitudes and risky road use in China by investigating the economic and political background status of a sample of young Chinese drivers. Using data from an online survey significant relationships are found between some family background factors and road safety variables. Correlation analysis, ANOVA, hierarchical regression analysis and structural equation modelling are applied in this study, with culture, personality and demographic variables as additional factors for a better understanding of the key findings. The findings are discussed in light of China's political management system and potential education opportunities for young drivers.