982 resultados para Jornal Ponto Final
Resumo:
This is the River Leith fluvial audit: Final project report produced by Lancaster University in 1998. Freeze cores extracted from the upper and lower ends of River Leith illustrate that the bed is highly compacted in the downstream reach. Fine material is locally derived from bedrock at depths of only 32 cms into the bed and in one core fine material is 66% of the extracted core. Levels of fines that are believed to be detrimental to fish are put at 20 to 30%. Reduced flow and stream power from water abstraction may lead to a greater infiltration of fine material if gravels are not regularly flushed through with flood flows. Infiltration of fine material can lead to river bed compaction and concretion. A small abstraction may have no effect on the morphology of a river if the reduced discharge is within the normal range of flows experienced. However if the impact on flows is small it is still possible that fine sediment problems will develop progressively and the effects may not be noticed for several years.
Resumo:
This is the River Eden RHS and geomorphology evaluation: Final report October 2001 produced by the Environment Agency North West in 2001. This report analysed the River Habitat Survey (RHS) and geomorphology data to evaluate the level of habitat quality and the geomorphological characteristics of the River Eden and sub-catchments. RHS data and geomorphological assessment data was collected within the study areas by CEH and Fluvial Environmental Services Ltd. The River Eden and its sub-catchments are being considered as a Special Area for Conservation (SAC) due to the presence of habitat types and species, which are rare or threatened within Europe. The purpose of the project is to provide an overview of the state of the catchment in terms of river habitats and geomorphological processes in order to aid the derivation of sound management for this proposed SAC.The aim of this report was to determine the state of the environment within the Eden and sub-catchments and identify the main pressures on the system in order to derive sound management options.
Resumo:
This is the River Camel Salmon Action Plan Final document produced by the Environment Agency in 2002. This final Salmon Action Plan (SAP) for the River Camel catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Camel salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Camel.
Resumo:
This is the River Fowey Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Fowey catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Fowey salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the Fowey SAP therefore, is to maintain, improve and develop the Fowey salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. Although the Fowey is passing its conservation limit, the consultees felt very strongly that there were two major factors limiting the salmon stock of the River Fowey- the overgrazing of Bodmin Moor and the use of the catchment for water supply by South West Water.
Resumo:
This is the River Lynher Salmon Action Plan Final document produced by the Environment Agency in 1999. This final Salmon Action Plan (SAP) for the River Lynher catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The River Lynher salmon stock has suffered two periods of spawning target failure within the past ten years. This assessment can only be estimated and in this case is likely to be dependent on river flow and the availability of salmon to the rods as only rod catch is used in the compliance assessment.
Resumo:
This is the River Plym Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Plym catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. These issues and actions follow on from the detailed analysis of the catchment, which is presented in the River Plym SAP Consultation document.The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the River Plym SAP therefore, is to maintain, improve and develop the River Plym salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. The River Plym has failed to pass its conservation limit since 1996, and the consultees felt very strongly that there were three major factors limiting the salmon stock of the River Plym.
Resumo:
This is the River Tavy Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Tavy catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Tavy salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Tavy.
Resumo:
This is the River Yealm Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Yealm catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Yealm salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. The main objective of the River Yealm SAP is to maintain, improve and develop the River Yealm salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support.
Resumo:
This is the Rivers Avon & Erme Salmon Action Plan Final document produced by the Environment Agency in 2004. The Rivers Avon and Erme Salmon Action Plan (SAP) has been produced after consideration of feedback from public consultation. The final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the salmon stocks and fisheries of both rivers. Efforts have been made to identify possible sources of funding, partners and timescales. It indicates how the plan will be managed, including the process for reviewing stock status, issues, actions and progress. Low marine survival is currently a major factor limiting the numbers of salmon returning to spawn in both the Avon and the Erme. Actions to improve the accessibility of spawning areas and to maximise the productivity of spawning and nursery habitats are seen as priorities, which should help to offset the low marine survival. The quality of the information available to assess salmon stocks is recognised as a limiting factor in the management of salmon fisheries. The SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the salmon stocks and fisheries of the Avon and the Erme.
Resumo:
This is the River Axe Salmon Action Plan Final document produced by the Environment Agency in 2004. The River Axe Salmon Action Plan (SAP) has been produced after consideration of feedback from public consultation. The final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the salmon stock of the River Axe. Efforts have been made to identify possible sources of funding, partners and timescales. It indicates how the plan will be managed, including the process for reviewing stock status, issues, actions and progress. Low marine survival is currently a major factor limiting salmon stocks throughout the United Kingdom. However, on the River Axe the freshwater environment is still the main factor limiting the recovery of the salmon stock. Most of the adults returning to the Axe at present are probably derived from hatchery reared smolts, although there has been some natural reproduction in recent years. Juvenile populations in the Yarty indicate that this is a tributary where salmon have started to re-establish a self-sustaining population. Actions to improve the quality of the freshwater environment, both in terms of water quality and sedimentation, are seen as the top priorities, and are required to allow the Axe to support a self-sustaining salmon population.
Resumo:
This is the River Dart Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Dart catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Dart salmon stock. The low marine survival (likely to be below 10%) is possibly to be the main cause for the River Dart salmon stock non-compliance with its conservation limit. Actions protecting smolts and maximising spawning activity of returning adults are seen as priorities to contribute to mitigate the low marine survival. Also the lack of information on salmon stock and its habitat is recognised as one main factor limiting the better management of salmon fisheries. Efforts will be focused on gaining more knowledge and improving modelling techniques. The actions presented in this document are perceived as those required to address the important issues and factors limiting the salmon stock. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Dart salmon stock and fisheries.
Resumo:
This is the River Exe Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Exe catchment has been produced after consideration of feedback from external consultation. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Exe salmon stock and fisheries. The River Exe salmon population is currently judged to be passing its Conservation Limit. However, its apparent declining trend in egg deposition in the recent years and the high uncertainty in its stock assessment suggest the following actions as priorities: actions promoting good land management, maximising salmon natural spawning activity and protecting smolts throughout the Exe catchment. Also, the lack of information on salmon stocks and its habitat quality and availability is recognised as the main factor limiting the better management of salmon fisheries. The actions presented in this document are perceived as those required to address the important issues and factors limiting the salmon stock.
Resumo:
This is the River Lyn Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Lyn catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lyn salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Lyn salmon stock and fisheries.
Resumo:
This is the River Taw Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Taw catchment has been produced after consideration of feedback from external consultation. The SAP provides a list of the issues and actions which were agreed for a five-year programme to maintain and improve the River Taw salmon stock. Some of these actions have already been delivered before finalising the SAP, but others have yet to be addressed. An attempt has been made to estimate the cost of the actions, identify possible sources of funding and the timescale under which they will be dealt with. The Taw salmon stock is currently failing to meet its spawning target. However, there was a period of compliance in the 1990s following a decade of failure through the 1980s. The freshwater environment of the Taw has improved in recent years. The actions presented in this SAP are perceived as those that are required to address, as far as possible, the important issues and factors currently limiting the salmon stock on the river. This SAP aims to promote long term collaboration between the Agency and other interested parties in managing the River Taw salmon stock and fisheries.
Resumo:
This is the River Teign Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Teign catchment has been produced after consideration of feedback from external consultation. This final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the River Teign salmon stock. An attempt has been made to cost these actions, identify possible sources of funding, partners and the timescale under which they will be dealt with. It indicates how the plan will be managed, i.e., implemented and reviewed, and, summarises progress of on-going actions. The low marine survival (likely to be below 10%) is possibly the main cause for the River Teign salmon stock non-compliance with its conservation limit. Actions protecting smolts and maximising spawning activity of returning adults are seen as priorities to contribute to offset the low marine survival. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Teign salmon stock and fisheries.