992 resultados para Integration projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Studies of construction labour productivity have revealed that limited predictability and multi-agent social complexity make long-range planning of construction projects extremely inaccurate. Fire-fighting, a cultural feature of construction project management, social and structural diversity of involved permanent organizations, and structural temporality all contribute towards relational failures and frequent changes. The main purpose of this paper is therefore to demonstrate that appropriate construction planning may have a profound synergistic effect on structural integration of a project organization. Using the general systems theory perspective it is further a specific objective to investigate and evaluate organizational effects of changes in planning and potentials for achieving continuous project-organizational synergy. The newly developed methodology recognises that planning should also represent a continuous, improvement-leading driving force throughout a project. The synergistic effect of the process planning membership duality fostered project-wide integration, eliminated internal boundaries, and created a pool of constantly upgrading knowledge. It maintained a creative environment that resulted in a number of process-related improvements from all parts of the organization. As a result labour productivity has seen increases of more than 30%, profits have risen from an average of 12% to more than 18%, and project durations have been reduced by several days.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many different individuals, who have their own expertise and criteria for decision making, are involved in making decisions on construction projects. Decision-making processes are thus significantly affected by communication, in which a dynamic performance of human intentions leads to unpredictable outcomes. In order to theorise the decision making processes including communication, it is argued here that the decision making processes resemble evolutionary dynamics in terms of both selection and mutation, which can be expressed by the replicator-mutator equation. To support this argument, a mathematical model of decision making has been made from an analogy with evolutionary dynamics, in which there are three variables: initial support rate, business hierarchy, and power of persuasion. On the other hand, a survey of patterns in decision making in construction projects has also been performed through self-administered mail questionnaire to construction practitioners. Consequently, comparison between the numerical analysis of mathematical model and the statistical analysis of empirical data has shown a significant potential of the replicator-mutator equation as a tool to study dynamic properties of intentions in communication.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper critiques the approach being taken in Ghana to implement Alternative Livelihood (AL) projects in mining communities. The rapid insurgence of illegal artisanal gold mining has forced policymakers to think more creatively about ways in which to deal with mounting unemployment in the country's rural areas. Most of the economic activities being promoted, however, have proved highly unpopular with target groups. The adopted policy approaches reflect how little in tune the organisations championing AL activities are with the mindsets and ambitions of rural populations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we ask why so much ecological scientific research does not have a greater policy impact in the UK. We argue that there are two potentially important and related reasons for this failing. First, much current ecological science is not being conducted at a scale that is readily meaningful to policy-makers. Second, to make much of this research policy-relevant requires collaborative interdisciplinary research between ecologists and social scientists. However, the challenge of undertaking useful interdisciplinary research only re-emphasises the problems of scale: ecologists and social scientists traditionally frame their research questions at different scales and consider different facets of natural resource management, setting different objectives and using different language. We argue that if applied ecological research is to have greater impact in informing environmental policy, much greater attention needs to be given to the scale of the research efforts as well as to the interaction with social scientists. Such an approach requires an adjustment in existing research and funding infrastructures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.