990 resultados para ECO project
Resumo:
A host of methods and tools to support designing are being developed in Cambridge EDC. These range from tools for design management to those for the generation and selection of design ideas, layouts, materials and production processes. A project, to develop a device to improve arm mobility of muscular dystrophy sufferers, is undertaken as a test-bed to evaluate and improve these methods and tools as well as to observe and modify its design and management processes. This paper presents the difficulties and advantages of using design methods and tools within this rehabilitation design context, with special focus on the evolution of the designs, tools, and management processes.
Resumo:
Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.
Resumo:
A baseline survey for the project which had been conducted in 2009 had gaps that could not allow assessment of project performance in the outcome and impact indicators to be made. This study was, therefore, commissioned to reconstruct the baseline data, aligned to the impact and outcome indicators on the project logframe and results framework, against which project achievements could be assessed. The purpose and scope of the study was to reconstruct the baseline data and analysis describing the situation prior to QAFM Project inception, taking 2008 as the baseline year, which was aligned to the project logframe outcome and impact indicators; to collect data on current status to compare project outcome (and where possible impact) in improved fish handling sites in comparison with the baseline as well as with comparable non-improved fish landing sites as control group. The study was conducted through secondary data search from sources at NaFIRRI, DFR and ICEIDA. Field data collection was carried out using a sample survey covering 312 respondents including boat and gear owners, crew members, processors and traders at eight project and two control landing sites. Key Informant Interviews were conducted with DFOs and BMU leaders in the study districts and landing sites respectively.
Resumo:
The drive to reduce carbon emissions from domestic housing has led to a recent shift of focus from new-‐build to retrofit. However there are two significant differences. Firstly more work is needed to retrofit existing housing to the same energy efficiency standards as new-‐build. Secondly the remaining length of service life is potentially shorter. This implies that the capital expenditure – both financial and carbon -‐ of retrofit may be disproportionate to the savings gained over the remaining life. However the Government’s definition of low and zero carbon continues to exclude the capital (embodied) carbon costs of construction, which has resulted in a lack of data for comparison. The paper addresses this gap by reporting the embodied carbon costs of retrofitting four individual pilot properties in Rampton Drift, part of an Eco-‐Town Demonstrator Project in Cambridgeshire. Through collecting details of the materials used and their journeys from manufacturer to site, the paper conducts a ‘cradle-‐to-‐gate’ life cycle carbon assessment for each property. The embodied carbon figures are calculated using a software tool being developed by the Centre for Sustainable Development at the University of Cambridge. The key aims are to assess the real embodied carbon costs of retrofit of domestic properties, and to test the new tool; it is hoped that the methodology, the tool and the specific findings will be transferable to other projects. Initial changes in operational energy as a result of the retrofit works will be reported and compared with the embodied carbon costs when presenting this paper.
Resumo:
The aquatic ecosystem of the Upper Victoria Nile is part of a wider complex of water bodies (lakes and rivers) in Uganda that is of immense socioeconomic importance, especially the fisheries. A source of food, income, energy, irrigation and drinking water, the protection, sustainable use and management of the Upper Victoria Nile water resources are vital to Uganda's economy. The Upper Victoria Nile,due to its abundance of socio-economic benefits,provides a significant contribution to Uganda's economy. The fisheries contribute to the sector as a major source of the export earnings, second to coffee (NEMA,1996), sustain small fishing villages,provide income and generally improve nutrition. Apart from the socio-economic significance of the fisheries,the riverine features of the Upper Victoria Nile, especially its hydropower potential,distinguish this river from the rest of the aquatic ecosystems in the country.