947 resultados para DISTRIBUTION SYSTEM


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A field trial was carried out in Brazil in March 2002 with the aim to evaluate the effects of different timing and extension of weedy period on maize productivity. The hybrid Pioneer 30K75 was sowed under 7 t ha(-1) mulching promoted by glyphosate spraying. The treatments were divided in two groups: In the first group, weeds were maintained since the maize sowing until different periods in the crop cycle: 0, 14, 28, 42, 56, 70, and 150 days (harvesting time). In the second group, the maize crop was kept weed free for the same periods of the first group. Weed control was done through hand hoeing. A complete randomized blocks experimental design with five replications was used for plots distribution in the field. Nonlinear regression model was used to study the effects of weedy or weedfree periods on maize productivity. Weed community included 13 families and 31 species. Asteraceae, Poaceae, and Euphorbiaceae were the most abundant families. Results showed that under no tillage condition with 7 t ha-1 mulching at sowing time, the maize crop could cohabit with weed community for 54 days without any yield lost. on the other hand, if the crop was kept weed free for 27 days, the weed interference was not enable to reduce maize production. According to these results one weed control measure between 27 and 54 days after crop emergence could be enough to avoid any reduction in maize productivity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Japanese apricot (Prunus mume Sieb. et Zucc.) is a fruit tree of the Rosaceae family which produces very acid and bitter fruits, highly appreciated by Orientals. In Brazil, this species has been studied as a rootstock for peach and nectarine trees, its main advantage being the reduction in plant vigour, which can favour the production of compact trees and orchard cultural treatments. This study was conducted in the Vegetable Production Department of FCAV/UNESP, Jaboticabal Campus, São Paulo State, Brazil, and the objective was to examine the effect of wounding the herbaceous cutting bases on the rooting of four Japanese apricot clones. The clones were obtained from plants under cultivation in the Instituto Agronomico de Campinas, Brazil, and were identified as Clones 02, 05, 10 and 15. The stock plants, obtained through herbaceous cuttings, were maintained under lath house conditions (50% of natural light). Cuttings 12 cm long with 3 to 5 leaves were collected from these clones and prepared. The experiment was carried out in a completely randomised design with 4 repetitions of 20 cuttings per replication, in a factorial 4 x 2 design, the clone factor having 4 levels (Clones 02, 05, 10 and 15) and the wounding factor at 2 levels of incisions into the cutting base (with and without). All the cuttings were treated with 2000 mg.L-1 of IBA for five seconds. Differences between the clones were observed concerning the rooting percentage, dead cuttings, number and length of roots. The incision (wound) at the base of the herbaceous cuttings of the Japanese apricot increased the number of roots and improved the distribution of these in the damaged tissue but the results were not considered sufficiently beneficial to make the treatment worthwhile.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a multi-objective approach for observing the performance of distribution systems with embedded generators in the steady state, based on heuristic and power system analysis, is proposed. The proposed hybrid performance index describes the quality of the operating state in each considered distribution network configuration. In order to represent the system state, the loss allocation in the distribution systems, based on the Z-bus loss allocation method and compensation-based power flow algorithm, is determined. Also, an investigation of the impact of the integration of embedded generators on the overall performance of the distribution systems in the steady state, is performed. Results obtained from several case studies are presented and discussed. Copyright (C) 2004 John Wiley Sons, Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The optimized allocation of protective devices in strategic points of the circuit improves the quality of the energy supply and the system reliability index. This paper presents a nonlinear integer programming (NLIP) model with binary variables, to deal with the problem of protective device allocation in the main feeder and all branches of an overhead distribution circuit, to improve the reliability index and to provide customers with service of high quality and reliability. The constraints considered in the problem take into account technical and economical limitations, such as coordination problems of serial protective devices, available equipment, the importance of the feeder and the circuit topology. The use of genetic algorithms (GAs) is proposed to solve this problem, using a binary representation that does (1) or does not (0) show allocation of protective devices (reclosers, sectionalizers and fuses) in predefined points of the circuit. Results are presented for a real circuit (134 busses), with the possibility of protective device allocation in 29 points. Also the ability of the algorithm in finding good solutions while improving significantly the indicators of reliability is shown. (C) 2003 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper presents an extended genetic algorithm for solving the optimal transmission network expansion planning problem. Two main improvements have been introduced in the genetic algorithm: (a) initial population obtained by conventional optimisation based methods; (b) mutation approach inspired in the simulated annealing technique, the proposed method is general in the sense that it does not assume any particular property of the problem being solved, such as linearity or convexity. Excellent performance is reported in the test results section of the paper for a difficult large-scale real-life problem: a substantial reduction in investment costs has been obtained with regard to previous solutions obtained via conventional optimisation methods and simulated annealing algorithms; statistical comparison procedures have been employed in benchmarking different versions of the genetic algorithm and simulated annealing methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Optimised placement of control and protective devices in distribution networks allows for a better operation and improvement of the reliability indices of the system. Control devices (used to reconfigure the feeders) are placed in distribution networks to obtain an optimal operation strategy to facilitate power supply restoration in the case of a contingency. Protective devices (used to isolate faults) are placed in distribution systems to improve the reliability and continuity of the power supply, significantly reducing the impacts that a fault can have in terms of customer outages, and the time needed for fault location and system restoration. This paper presents a novel technique to optimally place both control and protective devices in the same optimisation process on radial distribution feeders. The problem is modelled through mixed integer non-linear programming (MINLP) with real and binary variables. The reactive tabu search algorithm (RTS) is proposed to solve this problem. Results and optimised strategies for placing control and protective devices considering a practical feeder are presented. (c) 2007 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes an alternative procedure to obtain an equivalent conductor from a bundled conductor, taking into account the distribution of the current in subcondutors of the bundle. Firstly, it is introduced a brief background about the concept of Geometric Mean Radius (GMR) and how this methodology is applied to define an equivalent conductor and its electric parameters. Emphasizing that the classical procedure, using GMR, is limited to premise which the current is equally distributed through subconductors. Afterwards, it is described the development of proposed method and applications for an equivalent conductor obtained from a conventional transmission line bundled conductor and from an equivalent conductor based on a bundle with compressed SF(6) insulation system, where the current is unequally distributed through subconductors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper an efficient algorithm for probabilistic analysis of unbalanced three-phase weakly-meshed distribution systems is presented. This algorithm uses the technique of Two-Point Estimate Method for calculating the probabilistic behavior of the system random variables. Additionally, the deterministic analysis of the state variables is performed by means of a Compensation-Based Radial Load Flow (CBRLF). Such load flow efficiently exploits the topological characteristics of the network. To deal with distributed generation, a strategy to incorporate a simplified model of a generator in the CBRLF is proposed. Thus, depending on the type of control and generator operation conditions, the node with distributed generation can be modeled either as a PV or PQ node. To validate the efficiency of the proposed algorithm, the IEEE 37 bus test system is used. The probabilistic results are compared with those obtained using the Monte Carlo method.