984 resultados para Civil engineering.
Resumo:
A multivariate approach to bidding strategy is presented in comparison with previous standard approaches. An optimal formulation is derived and a method of parameter estimation proposed. A case study illustrates the derivation of optimal and other strategic mark up values against a single bidder. Concluding remarks concern extensions to multiple competitors differing levels of information, and sensitivity analysis.
Resumo:
This paper presents a unified view of the relationship between (1) quantity and (2) price generating mechanisms in estimating individual prime construction costs/prices. A brief review of quantity generating techniques is provided with particular emphasis on experientially based assumptive approaches and this is compared with the level of pricing data available for the quantities generated in terms of reliability of the ensuing prime cost estimates. It is argued that there is a tradeoff between the reliability of quantity items and reliability of rates. Thus it is shown that the level of quantity generation is optimised by maximising the joint reliability function of the quantity items and their associated rates. Some thoughts on how this joint reliability function can be evaluated and quantified follow. The application of these ideas is described within the overall strategy of the estimator's decision - "Which estimating technique shall I use for a given level of contract information? - and a case is made for the computer generation of estimates by several methods, with an indication of the reliability of each estimate, the ultimate choice of estimate being left to the estimator concerned. Finally, the potential for the development of automatic estimating systems within this framework is examined.
Resumo:
The construction industry contains two types of estimators the contractors' estimator and the designers' price forecaster. Each has two models of the building in which to systemize his procedures - the production model and the design model. The use of these models is discussed in the light of the industry's particular problems of complexity and uncertainty together with the pressures of the market. It is argued that estimators and forecasters, in order to function effectively in these conditions, are forced to exercise a high degree of subjective judgment. Means of eliciting good heuristics involved in judgment making are considered by reference to the artificial intelligence and construction literature and a methodology is proposed based on these findings. The results of two early trials of the method with students are given, indicating the usefulness of the approach.
Resumo:
This paper describes an analysis of construction project bids to determine (a) the global distribution and (b) factors influencing the distribution of bids. The global distribution of bids was found, by using a battery of ll test statistics, to be approximated by a three-parameter log normal distribution. No global spread parameter was found. A multivariate analysis revealed the year of tender to be the major influencing factor. Consideration of the construction order, tender price and output indices lead to the conclusion that distributional spread reflected the degree of difference in pricing policies between bidders and the skewness of the distributions reflected the degree of competition. The paper concludes with a tentative model of the causal relationships between the factors and distributional characteristics involved.
Resumo:
A theoretical framework for a construction management decision evaluation system for project selection by means of a literature review. The theory is developed by the examination of the major factors concerning the project selection decision from a deterministic viewpoint, where the decision-maker is assumed to possess 'perfect knowledge' of all the aspects involved. Four fundamental project characteristics are identified together with three meaningful outcome variables. The relationship within and between these variables are considered together with some possible solution techniques. The theory is next extended to time-related dynamic aspects of the problem leading to the implications of imperfect knowledge and a nondeterministic model. A solution technique is proposed in which Gottinger's sequential machines are utilised to model the decision process,
Resumo:
Emerging sciences, such as conceptual cost estimating, seem to have to go through two phases. The first phase involves reducing the field of study down to its basic ingredients - from systems development to technological development (techniques) to theoretical development. The second phase operates in the direction in building up techniques from theories, and systems from techniques. Cost estimating is clearly and distinctly still in the first phase. A great deal of effort has been put into the development of both manual and computer based cost estimating systems during this first phase and, to a lesser extent, the development of a range of techniques that can be used (see, for instance, Ashworth & Skitmore, 1986). Theoretical developments have not, as yet, been forthcoming. All theories need the support of some observational data and cost estimating is not likely to be an exception. These data do not need to be complete in order to build theories. As it is possible to construct an image of a prehistoric animal such as the brontosaurus from only a few key bones and relics, so a theory of cost estimating may possibly be found on a few factual details. The eternal argument of empiricists and deductionists is that, as theories need factual support, so do we need theories in order to know what facts to collect. In cost estimating, the basic facts of interest concern accuracy, the cost of achieving this accuracy, and the trade off between the two. When cost estimating theories do begin to emerge, it is highly likely that these relationships will be central features. This paper presents some of the facts we have been able to acquire regarding one part of this relationship - accuracy, and its influencing factors. Although some of these factors, such as the amount of information used in preparing the estimate, will have cost consequences, we have not yet reached the stage of quantifying these costs. Indeed, as will be seen, many of the factors do not involve any substantial cost considerations. The absence of any theory is reflected in the arbitrary manner in which the factors are presented. Rather, the emphasis here is on the consideration of purely empirical data concerning estimating accuracy. The essence of good empirical research is to .minimize the role of the researcher in interpreting the results of the study. Whilst space does not allow a full treatment of the material in this manner, the principle has been adopted as closely as possible to present results in an uncleaned and unbiased way. In most cases the evidence speaks for itself. The first part of the paper reviews most of the empirical evidence that we have located to date. Knowledge of any work done, but omitted here would be most welcome. The second part of the paper presents an analysis of some recently acquired data pertaining to this growing subject.
Resumo:
This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme
Resumo:
Several methods of estimating the costs or price of construction projects are now available for use in the construction industry. It is difficult due to the conservative approach of estimators and quantity surveyors, and the fact that the industry is undergoing one of its deepest recessions this century, to implement any changes in these processes. Several methods have been tried and tested and probably discarded forever, whereas other methods are still in their infancy. There is also a movement towards greater use of the computer, whichever method seems to be adopted. An important consideration with any method of estimating is the accuracy by which costs can be calculated. Any improvement in this consideration will be welcomed by a11 parties, because existing methods are poor when measured by this criteria. Estimating, particularly by contractors, has always carried some mystic, and many of the processes discussed both in the classroom and in practice are little more than fallacy when properly investigated. What makes an estimator or quantity surveyor good at forecasting the right price? To what extent does human behaviour influence or have a part to play? These and some of the other aspects of effective estimating are now examined in more detail.
Resumo:
Normanton2020 This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Interior Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Normanton. 16 students and four staff set off on a 2488km journey to undertake the second half of the Carpentaria Project (following Linking Karumba: Creating Sustainable Connections 2008), in the other Carpentaria Shire town of Normanton. This project, Get EnGulfed: Normanton 2020, looked back and forwards to propose strategies strengthening local and regional identities. Our project partners recognised the need for a strategic approach to developing future visions for Normanton’s growth as a socially, culturally, economically and ecologically sustainable town in the decade to 2020. They proposed: Project aims to foster: • Enhanced liveability; • A strengthened expression of town identity; • Expanded sustainable tourism. Primary challenges & opportunities: • Remoteness; • Two seasons: wet & dry; • Local economy; • Society and Cultural Heritage. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Mud Maps of Normanton: Rhys Belnap, AJ Humphries, Amos Shirreff, Haiku Van Keuk Normanton: Stay Another Day: Belle Dalton, Tom Jordan, Josh Nielsen, Carla Ramsland The Sweet Spot on the Savannah Way: Daniel Lapham, Yvonne Phillips, Patrick Poon, Dan Young Resilience Through Diversity: Jillian Kenny, Tania Metcher, Stephen Orr, Evan Thompson
Resumo:
Get EnGulfed: Normanton2020 This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Interior Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Normanton. It presented the work to QUT staff from across the university, as well as industry partners and invited guests. 16 students and four staff set off on a 2488km journey to undertake the second half of the Carpentaria Project (following Linking Karumba: Creating Sustainable Connections 2008), in the other Carpentaria Shire town of Normanton. This project, Get EnGulfed: Normanton 2020, looked back and forwards to propose strategies strengthening local and regional identities. Our project partners recognised the need for a strategic approach to developing future visions for Normanton’s growth as a socially, culturally, economically and ecologically sustainable town in the decade to 2020. They proposed: Project aims to foster: • Enhanced liveability; • A strengthened expression of town identity; • Expanded sustainable tourism. • Primary challenges & opportunities: • Remoteness; • Two seasons: wet & dry; • Local economy; • Society and Cultural Heritage. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Mud Maps of Normanton: Rhys Belnap, AJ Humphries, Amos Shirreff, Haiku Van Keuk Normanton: Stay Another Day: Belle Dalton, Tom Jordan, Josh Nielsen, Carla Ramsland The Sweet Spot on the Savannah Way: Daniel Lapham, Yvonne Phillips, Patrick Poon, Dan Young Resilience Through Diversity: Jillian Kenny, Tania Metcher, Stephen Orr, Evan Thompson
Resumo:
Scarcity of large parcels of land in well-serviced areas has motivated people to re-develop brownfield land. Most of brownfield land has high risk of contamination from wide range of industrial activities such as gas works, factories, railway land and waste tips. In addition, people who live in brownfield re-development areas may be exposed to health hazards. This paper discusses public perceptions on the brownfield sites and also the risk and mitigation strategy to promote brownfield re-development. Data is gathered from face to face survey of fifty respondents who work in Brisbane Central Business District (CBD) and interview with an expert on remediation of contaminated land. From this preliminary study, it is found that majority of the population are not aware of any brownfield sites near their residence and those who are aware showed very little concern on their proximity to the site. Further discussion on the paper based on a simple cross tabulation analysis. The main risk mitigation strategy of re-development of brownfield site is by updating the registration through Environmental Management Register (EMR) and Contaminated Land Register (CLR). In addition, insurance may offer to cover cost overruns on remediation cost.
Resumo:
Linking Karumba: Creating Sustainable Connections This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Industrial Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Karumba. It presented the work to the Karumba and Carpentaria Shire community. 16 students and four staff set off on a 2488km journey to undertake the first half of the Carpentaria Project: a fortnight-long strategic planning project entitled Linking Karumba to encourage social, economic, environmental and cultural linkages across the town. Karumba, along with the nearby town of Normanton, is one of Queensland’s most remote settlements. Its economy is based on fishing, tourism, and mining. It has two centres, 2.5km apart by river, or 9km by road. This physical disconnect was identified by Carpentaria Shire Council (CSC) and the Karumba Progress Association (KPA) as a source of socio-cultural disconnection, which formed the basis of our project brief. Student designs were highly responsive to the character of Karumba’s culture and environment, indicating remarkable levels of immersion, and attracting $830 000 in Qld. state government funding for implementation. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Make the Switch: Alice Anonuevo, Michael Marriott, Carla Priestley & Grant Harvey Realigning the Systems: Claudia Bergs, Rebecca Stephens, Anna Coulson & Lois Kerrigan Diversification of Experience: Rebecca North, Kyle Bush, Debra Sullivan & Jenna Green The River is the Main Street: Ashley Nicholson, Monica Kuiken, Dean Bowen & Bill Schild
Resumo:
QUT Linking Karumba Project This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Industrial Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Karumba. It presented the final, polished set of work to the Karumba and Carpentaria Shire community, following revisions in line with feedback from the 2008 exhibition. 16 students and four staff set off on a 2488km journey to undertake the first half of the Carpentaria Project: a fortnight-long strategic planning project entitled Linking Karumba to encourage social, economic, environmental and cultural linkages across the town. Karumba, along with the nearby town of Normanton, is one of Queensland’s most remote settlements. Its economy is based on fishing, tourism, and mining. It has two centres, 2.5km apart by river, or 9km by road. This physical disconnect was identified by Carpentaria Shire Council (CSC) and the Karumba Progress Association (KPA) as a source of socio-cultural disconnection, which formed the basis of our project brief. Student designs were highly responsive to the character of Karumba’s culture and environment, indicating remarkable levels of immersion, and attracting $830 000 in Qld. state government funding for implementation. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Make the Switch: Alice Anonuevo, Michael Marriott, Carla Priestley & Grant Harvey Realigning the Systems: Claudia Bergs, Rebecca Stephens, Anna Coulson & Lois Kerrigan Diversification of Experience: Rebecca North, Kyle Bush, Debra Sullivan & Jenna Green The River is the Main Street: Ashley Nicholson, Monica Kuiken, Dean Bowen & Bill Schild