1000 resultados para City of Praia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Villisca, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a special investigation of the City of Pacific Junction for the period July 1, 2008 through June 30, 2013

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Central City, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Blue Grass, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Bedford, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Pleasant Plain, Iowa for the period January 1, 2014 through December 31, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Colo, Iowa for the year ended June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Patterson, Iowa for the period December 1, 2013 through November 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed upon procedures report on the City of Galt, Iowa for the period August 1, 2013 through July 31, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Clarinda, Iowa for the year ended June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Cambridge, Iowa for the period August 1, 2013 through July 31, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Gilman, Iowa for the period September 1, 2013 through August 31, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Mount Ayr, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Foamed asphalt shoulders were placed on an Industrial Connector road at the south edge of Muscatine. The foamed asphalt was produced by injecting 1 to 2 percent water into hot asphalt cement in a patented foaming chamber. A foam develops which is 10 to 15 times the original volume. of the asphalt cement. A 3/8" limestone aggregate was used in the foamed asphalt mixture. This foamed asphalt was placed on the shoulders and in the radii on the Industrial Connector road in May 1987. The radii were later replaced due to reconstruction, but the shoulders remain and performed fairly well with some recent stripping and potholing. The performance appeared to be lower than expected from conventional hot mix on projects with similar traffic.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Goodell, Iowa for the year ended June 30, 2014