1000 resultados para crest line


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study was undertaken to investigate any textual differences and similarities within essays written with a word processing program and an e-mail editor by non-native writers. It arose from many contradictions and a paucity of empirical research within the field of second language learning and electronic technology. To further explore these contradictory observations, 3 classes of intermediate level ESL (English as a Second Language) students v^ote 6 essays, alternating between a word processing program and an e-mail editor. Prior to the data collection, students read brief texts and responded to questions that focused upon three formal topics: immigration, economics, and multiculturalism. Data were examined for (a) the differences in the frequency counts of 12 cohesive devices, (b) sentence complexity, which focused upon the occurrences of simple and complex sentences, (c) the number of words within the writings, (d) the method of contextualization preferred by writers, and (e) any variations in the final grades of the students' texts that resulted from holistic rating. Results of analysis indicated that there were no statistically significant differences in the frequency counts of the linguistic features. Sentence complexity did not vary within the off-line and on-line essays. The average number of words found within the off-line essays was approximately 20% greater than within on-line essays. Contextualization methods were not different within word-processed or e-mailed essays. Finally, there was no difference in the quality of the texts when holistically rated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work consists of a theoretical part and an experimental one. The first part provides a simple treatment of the celebrated von Neumann minimax theorem as formulated by Nikaid6 and Sion. It also discusses its relationships with fundamental theorems of convex analysis. The second part is about externality in sponsored search auctions. It shows that in these auctions, advertisers have externality effects on each other which influence their bidding behavior. It proposes Hal R.Varian model and shows how adding externality to this model will affect its properties. In order to have a better understanding of the interaction among advertisers in on-line auctions, it studies the structure of the Google advertisements networ.k and shows that it is a small-world scale-free network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sediments recovered from seven Last Glacial Maximum grounding lines sites, around the Antarctic Peninsula, were analyzed using micromorphology. This is the first evidence that grounding line sediments from around the Antarctic Peninsula have complex deformational histories and subglacial origins. It was determined that grounding zone wedge contain multiple units, or diamicton layers, with homogenized boundaries. The multiple diamicton units / layers are due to the accretionary formation of a grounding line wedge. All the sediments were deposited via deformation, and continual reincorporation, homogenization of lower diamicton layers by upper diamicton layers produced what macroscopically appeared to be a single massive diamicton unit. The morainal ridge that was sampled, alternatively, is composed of a single unit, or diamicton layer, that was subglacial in origin and believed to have been pushed out to form a ridge that was subsequently deformed via glacial push.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of men working to weld the railway line at Baie Comeau. The caption reads, "Welding railway line as rails joined immediately behind the temporary staff house".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph with the caption "Railway line, on trestle, immediately behind millsite".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A listing of the pilots competing in the All Women's International Air Race, 1953.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clipping from a Town Council meeting at which estimates of the costs of Railway Line no. 1 and Line no. 2 were submitted by the office of Port Dalhousie and Thorold Railway. The estimate was submitted by S.D. Woodruff and George Rykert, president. There is also a disclaimer in which Calvin Phelps claims to have resigned as director of the Port Dalhousie and Thorold Railway when he discovered that the company had no intention to adhere to the original plan for building and running the road, Aug. 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of the estimated cost of Line no. 1, n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Memorandum of ditching on the line of the Port Dalhousie and Thorold Railway between Port Dalhousie and St. Catharines (1 page, handwritten), n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“Frisco Line” St. Louis and San Francisco Railway the direct line through St. Louis schedule, Jan. 9, 1882.