932 resultados para Three-phase power flow


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An efficient heuristic algorithm is presented in this work in order to solve the optimal capacitor placement problem in radial distribution systems. The proposal uses the solution from the mathematical model after relaxing the integrality of the discrete variables as a strategy to identify the most attractive bus to add capacitors to each step of the heuristic algorithm. The relaxed mathematical model is a nonlinear programming problem and is solved using a specialized interior point method, The algorithm still incorporates an additional strategy of local search that enables the finding of a group of quality solutions after small alterations in the optimization strategy. Proposed solution methodology has been implemented and tested in known electric systems getting a satisfactory outcome compared with metaheuristic methods.The tests carried out in electric systems known in specialized literature reveal the satisfactory outcome of the proposed algorithm compared with metaheuristic methods. (C) 2009 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The separation methods are reduced applications as a result of the operational costs, the low output and the long time to separate the uids. But, these treatment methods are important because of the need for extraction of unwanted contaminants in the oil production. The water and the concentration of oil in water should be minimal (around 40 to 20 ppm) in order to take it to the sea. Because of the need of primary treatment, the objective of this project is to study and implement algorithms for identification of polynomial NARX (Nonlinear Auto-Regressive with Exogenous Input) models in closed loop, implement a structural identification, and compare strategies using PI control and updated on-line NARX predictive models on a combination of three-phase separator in series with three hydro cyclones batteries. The main goal of this project is to: obtain an optimized process of phase separation that will regulate the system, even in the presence of oil gushes; Show that it is possible to get optimized tunings for controllers analyzing the mesh as a whole, and evaluate and compare the strategies of PI and predictive control applied to the process. To accomplish these goals a simulator was used to represent the three phase separator and hydro cyclones. Algorithms were developed for system identification (NARX) using RLS(Recursive Least Square), along with methods for structure models detection. Predictive Control Algorithms were also implemented with NARX model updated on-line, and optimization algorithms using PSO (Particle Swarm Optimization). This project ends with a comparison of results obtained from the use of PI and predictive controllers (both with optimal state through the algorithm of cloud particles) in the simulated system. Thus, concluding that the performed optimizations make the system less sensitive to external perturbations and when optimized, the two controllers show similar results with the assessment of predictive control somewhat less sensitive to disturbances

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mutilation of extremities was very frequent in patients affected by leprosy in the past; although it is now much less common, it is still seen, mainly in patients with long-term disease. In general, mutilation of the nose and ears is caused by the bacillus and mutilation of the hands and feet a consequence of chronic trauma. Leprosy must be chronically treated and any decision to interrupt therapy is based on laboratory tests and biopsy. Scintigraphy is a non-invasive procedure which could be of great value in to determining disease activity. We studied eight patients (five males and three females, aged 64-73 years) who presented with mutilation of the nose (2), ear (1), feet (3) or foot and hand (2), Conventional three-phase bone scintigraphy (750 MBq) and X-ray examinations of the affected areas were performed in all patients. Bone scintigraphy was abnormal in four patients (the presence of bacilli was confirmed by biopsy in two of them), and normal in the other four. In all patients except for the one with ear mutilation, radiography only showed the absence of bone. We conclude that bone scintigraphy is very useful to determine disease activity in cases of mutilation caused by leprosy. It seems to be superior to conventional radiography and may enable bone biopsies to be avoided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this work a detailed modeling of three-phase distribution transformers aimed at complementing well-known approaches is presented. Thus, incidence of angular displacement and tapping is taken into account in the proposed models, considering both actual values and per unit. The analysis is based on minimal data requirement: solely short-circuit admittance is needed since three-phase transformers are treated as non-magnetically-coupled single-phase transformers. In order to support the proposed methodology, results obtained through laboratory tests are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A proposta deste trabalho é apresentar uma nova metodologia para determinação experimental das capacitancias parasitas do motor de indução trifásico de rotor em gaiola. As capacitancias parasitas fazem parte do circuito equivalente do motor para estudos de interferência eletromagnética causada no motor de indução em modo comum quando ele for acionado por inversor controlado por modulação por largura de pulsos (MLP). Os procedimentos propostos para o desenvolvimento deste novo método consistem em: a) determinação dos parâmetros do circuito equivalente do motor de indução trifásico, em regime permanente, através de ensaio em laboratório; b) estabelecer configurações de ligações entre o inversor MLP e o motor para medições das grandezas de interesse que são as seguintes: tensões de modo comum e de eixo, correntes de fuga e de eixo, através de circuito de medição desenvolvido para este fim; c) calcular os valores das capacitancias parasitas entre estator e carcaça do motor; estator e rotor; rotor e carcaça e de rolamento utilizando a expressão matemática da definição de capacitancia; d) utilizar o software Pspice para simular o sistema motor de indução trifásico, alimentado por inversor MLP, com os circuitos equivalentes em baixas e altas frequências; e) obter as formas de onda características do fenômeno de modo comum.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reactive-optimisation procedures are responsible for the minimisation of online power losses in interconnected systems. These procedures are performed separately at each control centre and involve external network representations. If total losses can be minimised by the implementation of calculated local control actions, the entire system benefits economically, but such control actions generally result in a certain degree of inaccuracy, owing to errors in the modelling of the external system. Since these errors are inevitable, they must at least be maintained within tolerable limits by external-modelling approaches. Care must be taken to avoid unrealistic loss minimisation, as the local-control actions adopted can lead the system to points of operation which will be less economical for the interconnected system as a whole. The evaluation of the economic impact of the external modelling during reactive-optimisation procedures in interconnected systems, in terms of both the amount of losses and constraint violations, becomes important in this context. In the paper, an analytical approach is proposed for such an evaluation. Case studies using data from the Brazilian South-Southeast system (810 buses) have been carried out to compare two different external-modelling approaches, both derived from the equivalent-optimal-power-flow (EOPF) model. Results obtained show that, depending on the external-model representation adopted, the loss representation can be flawed. Results also suggest some modelling features that should be adopted in the EOPF model to enhance the economy of the overall system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The transmission network planning problem is a non-linear integer mixed programming problem (NLIMP). Most of the algorithms used to solve this problem use a linear programming subroutine (LP) to solve LP problems resulting from planning algorithms. Sometimes the resolution of these LPs represents a major computational effort. The particularity of these LPs in the optimal solution is that only some inequality constraints are binding. This task transforms the LP into an equivalent problem with only one equality constraint (the power flow equation) and many inequality constraints, and uses a dual simplex algorithm and a relaxation strategy to solve the LPs. The optimisation process is started with only one equality constraint and, in each step, the most unfeasible constraint is added. The logic used is similar to a proposal for electric systems operation planning. The results show a higher performance of the algorithm when compared to primal simplex methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An analysis of the performance of six major methods of loss allocation for generators and demands was conducted, based on pro-rata (two), on incremental factors (two), on proportional sharing (PS) (one), and on electric circuit theory (one). Using relatively simple examples which can easily be checked, the advantages and disadvantages of each were ascertained and the results confirmed using a larger sample system (IEEE-118). The discussion considers the location and size of generators and demands, as well as the merits of the location of these agents for each configuration based on an analysis of the effect of various network modifications. Furthermore, an application in the South-Southeastern Brazilian Systems is performed. Conclusions and recommendations are presented. (C) 2004 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes a methodology to incorporate voltage/reactive representation to Short Term Generation Scheduling (STGS) models, which is based on active/reactive decoupling characteristics of power systems. In such approach STGS is decoupled in both Active (AGS) and Reactive (RGS) Generation Scheduling models. AGS model establishes an initial active generation scheduling through a traditional dispatch model. The scheduling proposed by AGS model is evaluated from the voltage/reactive points of view, through the proposed RGS model. RGS is formulated as a sequence of T nonlinear OPF problems, solved separately but taking into account load tracking between consecutive time intervals. This approach considerably reduces computational effort to perform the reactive analysis of the RGS problem as a whole. When necessary, RGS model is capable to propose active generation redispatches, such that critical reactive problems (in which all reactive variables have been insufficient to control the reactive problems) can be overcome. The formulation and solution methodology proposed are evaluated in the IEEE30 system in two case studies. These studies show that the methodology is robust enough to incorporate reactive aspects to STGS problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The data of four networks that can be used in carrying out comparative studies with methods for transmission network expansion planning are given. These networks are of various types and different levels of complexity. The main mathematical formulations used in transmission expansion studies-transportation models, hybrid models, DC power flow models, and disjunctive models are also summarised and compared. The main algorithm families are reviewed-both analytical, combinatorial and heuristic approaches. Optimal solutions are not yet known for some of the four networks when more accurate models (e.g. The DC model) are used to represent the power flow equations-the state of the art with regard to this is also summarised. This should serve as a challenge to authors searching for new, more efficient methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes an approach of optimal sensitivity applied in the tertiary loop of the automatic generation control. The approach is based on the theorem of non-linear perturbation. From an optimal operation point obtained by an optimal power flow a new optimal operation point is directly determined after a perturbation, i.e., without the necessity of an iterative process. This new optimal operation point satisfies the constraints of the problem for small perturbation in the loads. The participation factors and the voltage set point of the automatic voltage regulators (AVR) of the generators are determined by the technique of optimal sensitivity, considering the effects of the active power losses minimization and the network constraints. The participation factors and voltage set point of the generators are supplied directly to a computational program of dynamic simulation of the automatic generation control, named by power sensitivity mode. Test results are presented to show the good performance of this approach. (C) 2008 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work aims to present the design and the evaluation of a standard multi-pole machine with permanent magnets inserted in the rotor by two different geometrical forms: aligned and skewed magnets. The design (new analytical method) was based on a standard 250 W three phase 12-pole induction motor (squirrel cage rotor type), beginning with the original stator constructive data to calculate the magnetic flux density to determine the permanent magnets. In the development of the work, a simple and modular rotor was built reusing the original 12-pole stator (concentrated windings). The machine was evaluated in a laboratory for the purpose of checking the quantity and quality of energy produced with the machine operating as a generator and its start, torque, and performance working as a motor. In conclusion, the modular skewed magnet is an option for electrical machines, for the generation of a reasonable quality, in the context of decentralized generation and a motor with high torque and low energetic consumption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We have developed a biodegradable composite scaffold for bone tissue engineering applications with a pore size and interconnecting macroporosity similar to those of human trabecular bone. The scaffold is fabricated by a process of particle leaching and phase inversion from poly(lactide-co-glycolide) (PLGA) and two calcium phosphate (CaP) phases both of which are resorbable by osteoclasts; the first a particulate within the polymer structure and the second a thin ubiquitous coating. The 3-5 mu m thick osteoconductive surface CaP abrogates the putative foreign body giant cell response to the underlying polymer, while the internal CaP phase provides dimensional stability in an otherwise highly compliant structure. The scaffold may be used as a biomaterial alone, as a carrier for cells or a three-phase drug delivery device. Due to the highly interconnected macroporosity ranging from 81% to 91%, with macropores of 0.8 similar to 1.8 mm, and an ability to wick up blood, the scaffold acts as both a clot-retention device and an osteoconductive support for host bone growth. As a cell delivery vehicle, the scaffold can be first seeded with human mesenchymal cells which can then contribute to bone formation in orthotopic implantation sites, as we show in immune-compromised animal hosts. We have also employed this scaffold in both lithomorph and particulate forms in human patients to maintain alveolar bone height following tooth extraction, and augment alveolar bone height through standard sinus lift approaches. We provide a clinical case report of both of these applications; and we show that the scaffold served to regenerate sufficient bone tissue in the wound site to provide a sound foundation for dental implant placement. At the time of writing, such implants have been in occlusal function for periods of up to 3 years in sites regenerated through the use of the scaffold.