975 resultados para Lecture schedule
Resumo:
BACKGROUND: Information on the efficacy of chlorhexidine (CHX) rinsing on the subgingival microbiota is limited. This study tested if intermittent CHX rinsing over 5 years had an impact on the subgingival microbiota. METHODS: Subgingival plaque samples were analyzed by the checkerboard DNA-DNA hybridization method in a double-blind randomized CHX rinse study. RESULTS: A total of 210 subjects were included. The mean age of the subjects was 71.7 (+/- 4.1) years, and 56.2% were women. Evidence of alveolar bone loss was found in 39% of subjects. Bacterial loads were not correlated significantly with probing depth. At year 5, subjects in the CHX rinse group with no evidence of bone loss presented with lower total bacterial counts than control subjects with no bone loss. The levels of the following bacteria were significantly lower in the CHX group: Lactobacillus acidophilus (P <0.05), Eikenella corrodens (P <0.05), Fusobacterium nucleatum sp. nucleatum (P <0.01), Treponema denticola (P <0.05), Leptotrichia buccalis (P <0.05), and Eubacterium saburreum (P <0.05). No differences in bacterial loads were found between CHX and control rinse subjects with alveolar bone loss. CONCLUSIONS: Older subjects with or without periodontitis carry a large variety of bacteria associated with periodontitis. Intermittent rinsing with CHX may provide a preventive benefit in reducing levels of bacteria but only in subjects without alveolar bone loss.
Resumo:
During the project, managers encounter numerous contingencies and are faced with the challenging task of making decisions that will effectively keep the project on track. This task is very challenging because construction projects are non-prototypical and the processes are irreversible. Therefore, it is critical to apply a methodological approach to develop a few alternative management decision strategies during the planning phase, which can be deployed to manage alternative scenarios resulting from expected and unexpected disruptions in the as-planned schedule. Such a methodology should have the following features but are missing in the existing research: (1) looking at the effects of local decisions on the global project outcomes, (2) studying how a schedule responds to decisions and disruptive events because the risk in a schedule is a function of the decisions made, (3) establishing a method to assess and improve the management decision strategies, and (4) developing project specific decision strategies because each construction project is unique and the lessons from a particular project cannot be easily applied to projects that have different contexts. The objective of this dissertation is to develop a schedule-based simulation framework to design, assess, and improve sequences of decisions for the execution stage. The contribution of this research is the introduction of applying decision strategies to manage a project and the establishment of iterative methodology to continuously assess and improve decision strategies and schedules. The project managers or schedulers can implement the methodology to develop and identify schedules accompanied by suitable decision strategies to manage a project at the planning stage. The developed methodology also lays the foundation for an algorithm towards continuously automatically generating satisfactory schedule and strategies through the construction life of a project. Different from studying isolated daily decisions, the proposed framework introduces the notion of {em decision strategies} to manage construction process. A decision strategy is a sequence of interdependent decisions determined by resource allocation policies such as labor, material, equipment, and space policies. The schedule-based simulation framework consists of two parts, experiment design and result assessment. The core of the experiment design is the establishment of an iterative method to test and improve decision strategies and schedules, which is based on the introduction of decision strategies and the development of a schedule-based simulation testbed. The simulation testbed used is Interactive Construction Decision Making Aid (ICDMA). ICDMA has an emulator to duplicate the construction process that has been previously developed and a random event generator that allows the decision-maker to respond to disruptions in the emulation. It is used to study how the schedule responds to these disruptions and the corresponding decisions made over the duration of the project while accounting for cascading impacts and dependencies between activities. The dissertation is organized into two parts. The first part presents the existing research, identifies the departure points of this work, and develops a schedule-based simulation framework to design, assess, and improve decision strategies. In the second part, the proposed schedule-based simulation framework is applied to investigate specific research problems.
Resumo:
There is some evidence that dental erosion is steadily spreading. To diagnose erosion, dental professionals have to rely on clinical appearance, as there is no device available to detect it. Adequate preventive measures can only be initiated if the different risk factors and potential interactions between them are known. When substance loss, caused by erosive tooth wear, reaches a certain degree, oral rehabilitation becomes necessary. Prior to the most recent decade, the severely eroded dentition could only be rehabilitated by the provision of extensive crown and bridgework or removable dentures. As a result of the improvements in composite restorative materials and in adhesive techniques, it has become possible to rehabilitate eroded dentitions in a less invasive manner.
Resumo:
Contention-based MAC protocols follow periodic listen/sleep cycles. These protocols face the problem of virtual clustering if different unsynchronized listen/sleep schedules occur in the network, which has been shown to happen in wireless sensor networks. To interconnect these virtual clusters, border nodes maintaining all respective listen/sleep schedules are required. However, this is a waste of energy, if locally a common schedule can be determined. We propose to achieve local synchronization with a mechanism that is similar to gravitation. Clusters represent the mass, whereas synchronization messages sent by each cluster represent the gravitation force of the according cluster. Due to the mutual attraction caused by the clusters, all clusters merge finally. The exchange of synchronization messages itself is not altered by LACAS. Accordingly, LACAS introduces no overhead. Only a not yet used property of synchronization mechanisms is exploited.